INGETEC - REQUIREMENTS MISSING

missing
ITEM Suria (122Ha)
1 Mechanical trial pits 72
2 Borehole whit SPT test 20
3 Laboratory test:
3.1 Wet and dry density measurement 16
3.2 Water content measurement 10
3.3 Particle size analysis 7
3.4 Atterberg’s limits estimation 8
3.5 Organic content test 12
3.6 Chemical analysis (chloride content) 16
3.7 Chemical analysis (sulphate content, etc.) 16
3.8 Chemical analysis (PH measurement) 16
3.9 Proctor test 29
3.10 Micro-Deval or Los Angeles test 29
3.11 Mechanical Tests : Direct shear Tests, 29
3.12 Mechanical Tests : UU test, 29
3.13 Mechanical Tests : Triaxial test, 29
Mechanical Tests : Unconfined compression
3.14 29
Tests,
Mechanical Tests : Soil swell/collapse potential
3.15 29
test,
3.16 Mechanical Tests : Consolidation test, etc. 29
4 Thermal resistivity 6

OTHER REQUIREMENTS MISSING


Total missing Total
Requirements missing Pubenza (60Ha) Requirements missing
95 76% 23 51 45%
43 47% - 26 0%
72% 49%
29 55% - 14 0%
29 34% - 14 0%
29 24% - 14 0%
29 28% - 14 0%
29 41% - 14 0%
29 55% - 14 0%
29 55% - 14 0%
29 55% - 14 0%
29 100% 14 14 100%
29 100% 14 14 100%
29 100% 11 14 79%
29 100% 14 14 100%
29 100% 14 14 100%
29 14 14
100% 100%
29 14 14
100% 100%
29 100% 14 14 100%
9 67% 4 7 57%
Average 65% Average 38%
SURIA
122.4 Ha
requirements additional / Ha
Mechanical trial pits 70 + 1 / 5 Ha 70 5
borehole whit SPT test 30 + 1 / 10 Ha 30 10
Laboratory test 18 + 1 / 12Ha 18 12
Thermal resistivity test 8 + 1 / 250 Ha 8 250

REQUIREMENTS EDF CONTRACT

Wet and dry density Bulk density (wet density, dry


measurement density) No. 6

Water content measurement Water content


Particle size analysis Particle size analysis
Atterberg’s limits estimation Atterberg limit tests
Organic content test ,,,
Chemical analysis (chloride Chloride Content in soil
content)

Chemical analysis (sulphate Sulphate content in ground water


content, etc.)

Chemical analysis (PH PH (soil)


measurement)
Proctor test ,,,
Micro-Deval or Los Angeles test ,,,

Direct Shear test (Consolidated


Mechanical Tests : Direct shear constant volume
Tests, shear tests, optional, if clayey soil
encountered)

Triaxial test (Unconsolidated


Mechanical Tests : UU test, undrained, optional, if
clayey soil encountered)
Triaxial test (Consolidated
Mechanical Tests : Triaxial test,
drained)

Mechanical Tests : Unconfined Unconfined compressive strength


compression Tests, (for rock)

Mechanical Tests : Soil Swell potential/consolidation test


swell/collapse potential test, (Optional, if clayey)
Mechanical Tests : Consolidation Swell potential/consolidation test
test, etc. (Optional, if clayey)
Total Contract Realizado Contract
additional Bridge Total
Requirements DEBISAMCO DEBISAMCO DISICO
25 95 8 8 3 11
13 43 20 20 6 4 30
11 29 8 - 1 8 17
1 9 16 7 6 13

Total Contract Realizado Contract


Bridge
Requirements DEBISAMCO DEBISAMCO DISICO

29 8 10 1 24

29 8 6 0 24
29 8 10 1
29 8 10 1 24
29 8
29 4+4 0 0

29 4+4 0 0

29 4+4 0 0
29 0
29 0

29 8+8 2 1 1

29 4 0 0 1

29 4 0 1 1

29 4 0 0 5

29 6 0 0 2

29 6 0 1 5
Difference Contract Difference
(missing) INGETEC (INGETEC)
84 23 72
13 23 20
12 20
2 3 6

Difference Contract Difference


REQUERIMENTS EDF
(missing) INGETEC (INGETEC)

Wet and dry density


18 13 16
measurement

23 19 10 Water content measurement


18 22 7 Particle size analysis
18 21 8 Atterberg’s limits estimation
21 17 12 Organic content test
29 13 16 Chemical analysis (chloride
content)

29 13 16 Chemical analysis (sulphate


content, etc.)

29 13 16 Chemical analysis (PH


measurement)
29 29 Proctor test
29 0 29 Micro-Deval or Los Angeles test

26 0 29 Mechanical Tests : Direct shear


Tests,

29 0 29 Mechanical Tests : UU test,

28 0 29 Mechanical Tests : Triaxial test,

Mechanical Tests : Unconfined


29 0 29
compression Tests,

Mechanical Tests : Soil


29 0 29
swell/collapse potential test,
Mechanical Tests :
28 0 29
Consolidation test, etc.
PUBENZA
60.24 Ha
requirements additional / Ha additional
20 + 1 / 2Ha 20 2 31
10 + 1 / 4 Ha 10 4 16
3 + 1 / 6 Ha 3 6 11
2 + 1 / 15 Ha 2 15 5

CONTRACT

Bulk density (wet density, dry


density) No. 6

Water content
Particle size analysis
Atterberg limit tests
,,,
Chloride Content in soil

Sulphate content in ground water

PH (soil)
,,,
,,,

Direct Shear test (Consolidated


constant volume
shear tests, optional, if clayey soil
encountered)

Triaxial test (Unconsolidated


undrained, optional, if
clayey soil encountered)
Triaxial test (Consolidated
drained)

Unconfined compressive strength


(for rock)

Swell potential/consolidation test


(Optional, if clayey)
Swell potential/consolidation test
(Optional, if clayey)
Total Contract Realizado Contract total Difference
Bridge
Requirement DEBISAMCO DEBISAMCO DISICO contracted (missing)
51 5 5 3 8 43
26 14 14 2 4 20 6
14 6 1 8 15 - 7
7 12 9 17 29 -

Total Contract Realizado Contract Difference


Bridge
Requirements DEBISAMCO DEBISAMCO DISICO (missing)

14 6 8 1 5

14 6 0 1 26 13
14 6 4 1 9
14 6 9 1 26 4
14 6 8
14 3+3 0 0 14

14 3+3 0 0 14

14 3+3 0 0 14
14 0 14
14 0 14

14 6+6 4 1 1 9

14 3+3 0 0 1 14

14 3 4 1 1 9

14 3 3 0 2 11

14 5 0 0 5 14

14 5 5 1 2 8
Promedio 8
Contract Difference
INGETEC (INGETEC)
28 23
28 -2

3 4

Contract Difference
INGETEC (INGETEC)

25 -11

28 -14
27 -13
26 -12
25 -11
25 -11

25 -11

25 -11
0 14
0 14

3 11

0 14

0 14

0 14

0 14

0 14
DEBISAMCO - REQUIREMENTS MISSING

ITEM PV Plant Suria (122Ha)


1 Mechanical trial pits 84
2 Borehole whit SPT test 13
3 Laboratory test:
3.1 Wet and dry density measurement 20
3.2 Water content measurement 20
3.3 Particle size analysis 20
3.4 Atterberg’s limits estimation 20
3.5 Organic content test 29
3.6 Chemical analysis (chloride content) 20
3.7 Chemical analysis (sulphate content, etc.) 20
3.8 Chemical analysis (PH measurement) 20
3.9 Proctor test 29
3.10 Micro-Deval or Los Angeles test 29
3.11 Mechanical Tests : Direct shear Tests, 20
3.12 Mechanical Tests : UU test, 24
3.13 Mechanical Tests : Triaxial test, 24
3.14 Mechanical Tests : Unconfined compression 24
Tests,

3.15 Mechanical Tests : Soil swell/collapse potential 22


test,
3.16 Mechanical Tests : Consolidation test, etc. 22
4 Thermal resistivity
uria (122Ha) Pubenza (60Ha)
95 88% 43 51
43 30% 6 26

29 69% 7 14
29 69% 7 14
29 69% 7 14
29 69% 7 14
29 100% 14 14
29 69% 7 14
29 69% 7 14
29 69% 7 14
29 100% 14 14
29 100% 14 14
29 69% 7 14
29 83% 7 14
29 83% 10 14
29 10 14
83%
29 8 14
76%
29 76% 8 14
9 0% 7