1-: Phases of the project

Phase Topic
A Analyze the existing LAN/WAN Phase A completion
infrastructure time
B Prepare a proposal for the Phase B starts after
optimization / reorganization and the ending of phase
development of the network A
infrastructures.

C Making the initial deployment plan Phase C starts after


including costing, duration and the end of Phase B
resources and outline a preliminary or Phase A or can
list of network equipment’s essential run simultaneously
for network establishment; with phase B

D Prepare a training plan for IT staff for After finishing the


the network deployment and phase C Phase D
maintenance starts
E Network deployment stages. Phase E starts after
the phase D

F Establishment of network monitoring Phase F can be kept Final auditing Time table six is
and auditing cell and feed back report monitoring and report will be reserved for the
for further improvement. auditing while submitted fixing the problems
deployment phase after the found in auditing.
E going on by a phase F and
audit team on site before the
starting of
phase G
G Documentation of the network and This phase starts
final handover to the project. after the phase F

1
2:-Activities to be performed

This is containing in project phase in topics.

Analyze the existing LAN/WAN infrastructure of the organization.

1. Analyze existing LAN and WAN infrastructure report, prepared by Information-


Analytical Department of the government and examine the government’s
requirements.
2. Preparing solution for urgent temporary merging of existing LAN/WANs to meet
the government’s requirements.
3. Prepare a final assessment report based on the analysis of the existing network.

Prepare a proposal for the optimization / reorganization and development of the data
infrastructure:

1. Analyze the market of local communications (lines) owners/providers and


2. Propose a viable solution for communications link setup across the country.
3. Calculating the estimated cost of the network optimization / reorganization and
deployment.
4. Outline a preliminary list of network equipments essential for network
establishment; Submitting a complete project plan to Government for approval

Prepare training plan for IT staff for deployment and maintenance:

For IT support and Network Administrators

1. Plan a short term local training for IT specialists on network installation/support,


calculate estimated cost of trainings.
2. Communicate with the Head hunting firms for the required experts and
consultants.

2
3:-Duration for each activity

This is containing in project phase in different time tables.

First 1 day: - for surveying the project site and proposing

Second 5 days: - will be purchasing of devices and equipment’s

Third 7 days: - for Trucking

Forth 6 days: - for Cabling

Fifth 3 days: - for Crimping

Sixth 9 days: - for Configuration of client and server

4:-Required man power and Responsible body

Network technicians, Network Engineers, who assist man power for drilling the wall etc.

15 daily labors for trunk and cabling

3 IT officers for crimping and installation and configuration purpose

1 IT manager for the Management of the project and will Responsible for the technical
works.

Task2.Identifying Network and Internet Infrastructure resources

Servers Brand name of Capacity


manufacture
Database Server Dell 8GB RAM.
Application Server “ 8GB RAM.
Mail Server “ 8GB RAM.
Web server “ 8GB RAM.

3
1. Hardware needed to build the infrastructure
 Servers

Database Server, Application Server, Mail Server, Web server, Storage Server. Servers
should have above 8GB RAM.

 Router
 RACK
 Distribution /multilayer switch
 Access switch
 Patch panel,
 Module(jack),outlet and faceplate
 Cables
o UTP CAT6:-User cordcable are used for connect from the user to the
outlet.
o UTP CAT6:-Patch cord cable are used for connect from the patch panel to
the switch.
o Fiber cable:-is used for connect from ISP to EPON.
 Network toolkits

Network toolkits are crimper, pancher, cutter, Cordless, drill with number 8 and number
22.

2. Software needed to build the infrastructure

Microsoft exchange server 2012 or latest for centralized messaging system Kaspersky
server based antivirus for server virus protection

Windows Server 2012, Windows 10 updated version, MS office 2016, Latest version SQL
server.

Type of internet connectivity needed to build the infrastructure.

Internet connectivity from telecommunication infrastructure is EPON.

EPON abbreviated Ethernet Passive Optical Network. Since the project needed 4Mbps.

4
Estimate price of listed hardware, software and internet connectivity

Estimation of the necessary hardware and software and internet connection

1. Three 18 port D-link switch 5,736birr Estimation


2. One PowerEdge™ T420 tower server computer 35,000 birr
3. 500 meters of twisted pair cable will cost the company 1000birr Estimation
4. 500 meters of trunk with a size of 20×30 cm thickness 5000birr Estimation
5. 4mbps ADSL Broadband connection for the whole employee 230birr subscription
fee plus 700birr monthly charge

5
Task3:-Preparing Logical Design of an IT Infrastructure Solution

6
Task4:-Assisting in Policy development of client support and maintenance

There should be a permanent employee of It support officer who will maintain


whenever the Network and hard ware failure occurs.

Phases of Project

Activities to be performed

 Prepare equipment’s for infrastructure


 Implantation The network
 Installing the client computers
 Configure the system
 Test the system

Duration For each activates

No Tasks Month Month 2 Month 3 Month 4


1
1 Prepare
equipments for
infrastructure

2 Implantation The
network

3 Installing the client


computers

4 Configure the
system

5 Test the system

7
For the infrastructure need manpower (Its better create in table format)

 IT profession
 Electricians

Hardware Requirements

List of hardware’s for to build infrastructures

No Items Quantity Prices remark


1 Server 2 140000 birr
2 Computers 144 1152000 birr
3 Switches 11 16500 birr
4 Network Cables 3roll
5 Truncates
6 Rj 45 200
7 crimpers 3
8 Patch panels 9
9 punchers 3
10 Ups 146
11 Power stabilizers
12 Printers
Software Requirement

List of Software’s for to build infrastructures

No Description of Equipment’s Qty U.Price Cost Est (Birr)


softwares
1 Antivirus software’s
2 Windows Server Operating
Systems
3 Windows operating
Systems
4 Microsoft exchange server
software
5 Microsoft software’s
6 Browser software’s like
Mozilla, Chrome

Total Price

8
Type of internet

• 4MB ADSL broadband internet connection

I propose for the client support mechanism

• Preventive maintenance—the prevention of equipment breakdowns before they


happen. This includes inspections, adjustments, regular service and planned
shutdowns.
• Repair work—repairing equipment and troubleshooting malfunctions in an effort
to return the equipment to its previous condition. These repairs may be reactive
or preventive.
• Improvement work—searching for better materials and improved design changes
to facilitate equipment reliability. Repair work is often a part of improvement
work.

9
10
Task 3

1. How to support the user computer