HNS Level IV Network Infrastructure Designing and Proposal COC Model
HNS Level IV Network Infrastructure Designing and Proposal COC Model
Project Assignment
Contents
Phase Topic
A Analyze the existing LAN/WAN Phase A completion
infrastructure time
B Prepare a proposal for the Phase B starts after
optimization / reorganization and the ending of phase
development of the network A
infrastructures.
F Establishment of network monitoring Phase F can be kept Final auditing Time table six is
and auditing cell and feed back report monitoring and report will be reserved for the
for further improvement. auditing while submitted fixing the problems
deployment phase after the found in auditing.
E going on by a phase F and
audit team on site before the
starting of
phase G
G Documentation of the network and This phase starts
final handover to the project. after the phase F
1
2:-Activities to be performed
Prepare a proposal for the optimization / reorganization and development of the data
infrastructure:
2
3:-Duration for each activity
Network technicians, Network Engineers, who assist man power for drilling the wall etc.
1 IT manager for the Management of the project and will Responsible for the technical
works.
3
1. Hardware needed to build the infrastructure
Servers
Database Server, Application Server, Mail Server, Web server, Storage Server. Servers
should have above 8GB RAM.
Router
RACK
Distribution /multilayer switch
Access switch
Patch panel,
Module(jack),outlet and faceplate
Cables
o UTP CAT6:-User cordcable are used for connect from the user to the
outlet.
o UTP CAT6:-Patch cord cable are used for connect from the patch panel to
the switch.
o Fiber cable:-is used for connect from ISP to EPON.
Network toolkits
Network toolkits are crimper, pancher, cutter, Cordless, drill with number 8 and number
22.
Microsoft exchange server 2012 or latest for centralized messaging system Kaspersky
server based antivirus for server virus protection
Windows Server 2012, Windows 10 updated version, MS office 2016, Latest version SQL
server.
EPON abbreviated Ethernet Passive Optical Network. Since the project needed 4Mbps.
4
Estimate price of listed hardware, software and internet connectivity
5
Task3:-Preparing Logical Design of an IT Infrastructure Solution
6
Task4:-Assisting in Policy development of client support and maintenance
Phases of Project
Activities to be performed
2 Implantation The
network
4 Configure the
system
7
For the infrastructure need manpower (Its better create in table format)
IT profession
Electricians
Hardware Requirements
Total Price
8
Type of internet
9
10
Task 3
Task 4
11