This contingency plan outlines potential problems and solutions for an Irn-Bru advert production. It identifies someone else using the booked studio room as a potential problem, which would prevent them from working. The plan's control measure is to have one of the producers book the room and get on the timetable to ensure it is free for their use. Existing measures include having a timetable to book the room.
This contingency plan outlines potential problems and solutions for an Irn-Bru advert production. It identifies someone else using the booked studio room as a potential problem, which would prevent them from working. The plan's control measure is to have one of the producers book the room and get on the timetable to ensure it is free for their use. Existing measures include having a timetable to book the room.
This contingency plan outlines potential problems and solutions for an Irn-Bru advert production. It identifies someone else using the booked studio room as a potential problem, which would prevent them from working. The plan's control measure is to have one of the producers book the room and get on the timetable to ensure it is free for their use. Existing measures include having a timetable to book the room.
Name of Production: Irn-bru advert. Producers Name: Issac, Ben, Harvey, Brian, Liam Contact Number: 07476649197
Location / Potential problem Effect on production Control Measure Existing measures
scene The studio Someone else using the We can’t work in there. Book the room with ben to make There’s a timetable to make sure that room sure it is free and get on the the room is booked. timetable