Lecture 5
Scope Management
Part (2)
December . 2020
aScope Management hE
main processes are involved in scope management:
Planning scope management
Collecting Requirements
Defining Scope
Creating the Work Breakdown Structure (WBS)
Validating Scope
Controlling ScopePee aU Ou mR ECM ecu ee adil cee
rem te) 3). rTe(Deal| ) c. Integrity Cen
2. Initiating involves developing a project charter, which is a part of.......... management area
ER Integration b. Scope c.Risk d. Communication e. Human resources
3. Which process group involves measuring progress toward project objectives and taking
Celica Tali)
PRE Mg ae oN oat Reo seo alacant
4. Which of the following items is not normally included in a project charter?
a. The name of the project manger _b. Budget information
Liege rc CF PNcrcie ie
5. Which of the following processes (Sirispart of project integration management?
Osa eae aT ut eo cate
c. Develop the project management plan d, Close the project or phase
OPES te go re SMU HOSA t tga bola costae easton ted
an organization (Organizational culture)4= Effective communication skills. JLas¥! aij
PR eveyatee (fe (es toe) ol CRP eNO
Bem eller (vats(o Bit) omnia Rene
Wetter eee
Pag ts sree rs vse hats) Ay) E CE ne ee]
CRM RSCTer morn tata) <1 Eaeeies AN PE ed
Pees Bou caste ee oe eS In ETS)
FoR erere meteors Ue Corn oll coeesee eae
Coie rut lt Cs ane}
Pm Oey acre ae tn)a. A Gantt chart is normally used for project scheduling management (em)
b. NPV‘is a technique used for project execution. —— |)
INPV: Net present value is the difference between the present value of cash inflows and the
present value of cash outflows over a period of time.
a. Project management addresses strategic goals of the organization 1)
Doe) ramos) ob trc routes ett MMS ee -Cor) Le ere crite lev I Bec cad
management addresses _tactical_ goals.
Execution is the most time-consuming process group in the project
EM acoA eM OV oM Iie CMe O
Which of the following is not an attribute of a project?
se
a. Meeting communication goals is one of the main project requirements ( F)
b. Improved productivity is an advantage of using formal project management (T )
Formal project management approach consists of using traditional project planing, scope, and benchmarking in order
Renu ero
a. Structural frame of an organization focuses on providing harmony between needs
of the organization and needs of people, (| 13)
(HR) frame focuses on producing harmony between the needs of the organization and the needs of people.
a. Monitoring process measures progress of the project against all plans ( 1)
b. SWOT is a tool used create project charter ( 13)
SWOT : Strengths, Weaknesses, \ pportunities, and ‘hreats- swoTisa
strategic planning tool used to evaliate the strengths, Wealmesses) Opportimities, and threats to a project
OOa. Program 1. A group of projects being worked on by an
organization
Dy ae Tous) 2. a document used to coordinate all project
planning documents and guide execution i
c. Project 3. a group of related projects managed ina
phenibroutois ct) coordinated way
4.a group of investments fi
5. is a certificate in project management B
CCR poe ae mye cane Ce Le)
Aicrume steno e a (re latiPovele) teres (sus omcH UMA TMAH ITAMODAMCeL boron ls lilca teu yFOleLUcae Moy MUN ope Key cuercHoCe MH OTe
processes used to create them Ni geal
Deliverables are only product-related, such as a piece of hardware or software. True Fales
The term describes a product produced as part of a project,
EMRE Vat Lies feast Cere1o)
b. scope d. work package
BStee) premiera (Oy
a. each level of work that is outlined ina work breakdown structure.
b. the end product created/as part of a project that is delivered to the client.
c. tasks that are decomposed) into smaller tasks in work breakdown structury,
Pm antes nt eer teenth tinea reteA-Hospital is required in the “TOWN X” which has a population of 50,000
people.
>» There was a need for a hospital in the Town X for a long time. Earlier
Patients had to travel to the nearest City which is 100 km..... So it was
decided to construct a local hospital. This will improve health of
inhabitants 441s! , reduce traveling time and cost.
» The objective of the project is to achieve exposure into a new area of
expertise, profitability, competitive advantages and publicity
Pom N CEM =m) 901C- I =i l1a1e) 0 -1-1°)/91°) ele 2O22a
Lice 8) NTI nie Rooms: Sasement (kitchen- Laundry)- Ground Floor (Medical Store-
Emergency Ward- Laboratory..)- First floor( Waiting lounge- Patient Ward)
> Electrical Equipment: Three phase- copper wires- ...
» Doors: Main doors automatic- remaining doors wooding....
» Lift: Lift 8m2- 3 Lifts farthest apart- access to all floor through the lift
» Uncovered area: at least 1/5" of the land to remain uncovered- car
Fee B11 07400 Cae er-1kel nN LOO ne
» Project Initiation no later than January 2020
» Project completion by Jan 2022 bs
> Cost must not exceed $35 MillionSite Preparation (eis! j=3)
ONConi cre We me -eile [0 (CBee eee)
ESSite ie] melted ee))
Building Construction (4! «&3!); Concrete- Ceils- Walls ...
Electrical works (42S! Je!); Wiring- Electrical appliances installation-
Ol cota oNeor- lcm C1 eg)
Plumbing works (4Si!I Jue!): Piping- Sanitary fitting
aN Ned a tSib pede eel) aDIUTo are pm xeon auLUTe}
Interior/Exterior Decorate (4!)S4!): Glass works- Paint
Medical equipment installation is not part of this project.
WV ofele Rod eoRe lor Me alice Velo OTN Oo
Only Wiring for Networking will be done, Equipment will not be installed.
0Bu
Hospital
| ]
l
| J
Site Arch, Struc. [q, Elec.
prep. | design] design J °nSUEOMT Wor Works
aa
quipment
PI LeRYm RAMA Lee keV Lena ve |) elles cis anelets tere ort TNUL
https://www.futurehospital je/wp-content/uploads/2016/11/22-Project-Execution-Plan.pdf4) Create Work Breakdown
Structure (WBS)
WBS is a [2E@eencrdacs of activities involved in the project that
TOR U-e Ke) 8
Intranet
|
1 i
Web site design | Home page design —_ Marketing pages Sales pages
Text Text
: Site map Text
+ Graphic design Images Images Images
L
1
a
1
Programs Hyperlinks Hyperlinks Hyperlinks: The process of < project
and project work into ;
WBS provides the basis for planning and managing project
schedules, costs, resources, and changes.
petty ES Ore bars ttt ted
‘| .1 Scope management pla
| 2 Project scope statement
| 3 Requirements
documentation
4 Enterprise environmental
factors
5 Organizational procesé
assets4) Create WBS (c
d)y
> The scope baseline includes the approved project scope
PEE Cee INA e-))CoKe) eremcni the eran) BCs m 1)
statement and its associated WBS and WBs dictionary. 5
> WBS can be organized by project products (deliverable), project phases,
or the PM process groups
| Web site design |Home page design | Marketing pages Sales pages |
Site map Text
Le
Graphic design Images Images Images
Programs Hyperlinks Hyperlinks Hyperlinks
Fig. Sample intranet WBS organized by product4) Create WBS (cont'd)
Intranet
Project
Level 1 - Entire Project
Concept | Website Website
design development Rollout Support
i : 2 1 2 :
Evaluate) Define Define Define Develop | Brief Web
Level 3 “urent | requirements specific risks & risk | project plan | development
systems functionality | management |p team
approach
1
Define user | Define content | Define system Define server
owner
fequirements requirements —__ requirements
ea ™ " requirements
Ti lbevaCele-1.3| Define specific functionality
4 Define risks and risk management
approach
.5| Develop project plan
.G Brief Web development team
1.2|WeD site design§ Summary Tasks:
FS Tasks that are decomposed into smaller tasks summary
ELL.
Work Package:
» Work package is the task at the /owest /eve/of each branch in WBS (
further decomposed)
» Represents the level of work that the PM [imam and Bayes
» Resources (e.g., cost, time) Fev yeerersat the work package level.
> All other tasks are grouping or summary for work packages.
Pam Medel WOK Oacielefe V0 9)
= Awork package that is ‘00 4/9 would imply /oose contro/on the activities.
= Awork package that is /oo sma//would consume a lot of effort in managing.
—— i. ...°.°.°.°°” ——_ 8i
Ei
Ey
}.4Define Requirements,
Ser requirement
* 2 Web Site Design
® 3 Web Site Development
* 4 Roll Out
* § Support
Fig. Intranet Gantt chart in Microsoft Project4) Create WBS (co —
yaaUsing guidelines or template:
> TIGRE ieeed: uses WBS of a similar project as the starting
point
yaa the mind-mapping approach: [OS=Seeelte-tme-telrl Une im cole Mele
idea to structure thoughts and ideas
= allows people to write and draw pictures of ideas in a non/inear format
= increase participation and morale among teams <3: il! tone] call by
yu The top-down approach) Uae flow charts,
spider diagrams
yaa The bottom-up approach) and thought maps.4) Create WBS (cont'd)4) Create WBS (cont'd)
B crea ig WBS Approaches:
= Start with the /argest items of the
project and break them into
subordinate items
Refining the work into greater
and greater levels of detail
h
Best suited to project managers
who have vast technical insight
and a big-picture perspective
y ou
= Identify as many specific tasks
related to the project as possible
(required deliverables)
Then aggregate the specific tasks
and organize them into summary
activities, or higher levels in the
WBS
Best suited for projects that
represent entirely new systems or
approaches to doing a jobPa ELL) eet be described nt Peon TOR \-10 (18 MS UCL)
understanding of what it involves
> (TESIRICUE is a document that provides detailed information
about each WBS item.
ZaWBS dictionary can include:
Code of account identifier (code Gf accounts is a unique lettering or numbering system
in which letters on numbers ar@ assigned to/each unique component of the work breakdown
structure. )
BI Solgl Clo M elLG frei nesPyy
Assumptions and constraints eperalre ese]
EXole elle Real -(010] (0171 oe Uwe Oe
Resources required EINES)
(ONS Els} Pr ca) fe en
eT ac=teltTi tual 1) Exes nele ey
Acceptance criteria rreslerery4) Create WBS (cont'd)
Sample WBS dictionary entry
Project Title: Information Technology (IT) Upgrade Project
WBS Item Name: Update Database, i
Description: The IT department maintains an online database of hardware and software on the
corporate intranet, However, we need to make sure that we know exactly what hardware and software
sing and if they have any unique needs before we decide what to order for the
eviewing information from the current database, producing reports that
list each depa SGmployees and location, and updating the data after performing the physical
inventory and receiving inputs from department managers. Our project sponsor will send a notice to all
department managers to communicate the importance of this project and this particular task. In
addition to general hardware and software upgrades, the project sponsors will ask the department
managers to provide information for any unique requirements they might have that could affect the
upgrades. This task also includes updating the inventory data for network hardware and software. After
updating the inventory database, we will send an e-mail to each department manager to verify the
will be r» Aunit of work should appear at only one place in the WBS.
> The work content of a WBS item is the sum of the WBS items below it.
> AWBS item is the responsibility of only one person, even though many
people might be working on it.
>» The WBS must be consistent « ““l--with the way work actually will be
performed; it should serve the project team first
> Project team members should be inVolvealin| developing the WBS.
> Each WBS jiem (RaREIRAeTener in a WBS dictionary to ensure
accurate understanding of the scope of work
>» The WBS must be a fiexible {cal/to accommodate changes.
EyOran} ered
Crue cd
Seo ace eu aes
“ia eae validation involves formal acceptance of the
I 3) Defining Scope
Cer en od
bey Sire
(wes)
5) Validating Sc
Validating scope is often achieved by a CSOT ponnceen
inspection(<*+<)and then sign-off on key deliverables. |
completed project deliverables.
Sears
aWEhst
crete
Validating scope can Pont Beene a |
Scope control involves managing changes to the’ project scope while
Ly
Deciding whether corrective or preventivezaction is required
Lofola ie) liale Mere) XM (<1 91-1410 Mo) elie py etetia Neal eee
OES ela e 0 tom
Variance analysis is a technique for determining the cause and degree of
Collier ecmolci8N-.-1N) cil= 212 \\=1||91=> Noite ote “1 RS a es, mere
a Dons “it» Help users manage different aspects of all 10 project
management knowledge areas.
» Free trial for MS project 2016:
https://www.microsoft.com/en-us/evaleenter/evaluate-project-
professional-2016
» Task1: Use MS Project for WBS» Task!: Use MS Project for WBS ——
4 Tracking Database
4 Linitating
1.1 Kickoff meeting
1.2 Develop project charter
1.3 Charter signed
4 2Planning
2.1 Develop project plans
2.2 Review project plans
2.3 Project plans approved
4 3 Executing
3.1 Analysis
3.2 Design
3.3 Implementation
3.4 System implemented
4 4Controlling
4.1 Report performance
4.2.Control changes
4 5 Closing
5.1 Prepare final project report
5.2 Present final project
5.3 Project completedh
alle Ni y FT