You are on page 1of 2
ISGEC HEAVY ENGINEERING LIMITED Approval Note To: Mr. VK Luthra From : Site = ‘Through : Mr. K L Agarwal Ws Project Code : EC0043 Project Name : KGPCL Bangalore J Dated :- 27-09-2022 Sub: for amendment in Work No. Ps 0043 and i . ACC Limited = ork. With reference to the above subject, initially we have given the PO to M/s ACC Limited for RMC supply ul vite for die following yude of concrete with last revision no 2. As per sanction dated 17/09/2022 for M/s Bharat Builders & developers of additional qty of 394 cum ( PO number P83012412/BC0043 } which supposed be adjusted from M/s Acc Limited as below ( Sanction copy attached herewith ) : Aenendes 0 | Renais ae s1652 ‘M20, Cum oO 00 00 | o o was | Gum | 20] ora6 | S000 ft —aenores | ——aomooe sao [eno fT |e | ae Weer rote 4000. compou ws wanwee | cm | sats | 2000 | aD) a meld ial s2100| _s1s000| Sac | nosis | coon sao cago oan ueeera ee Talay fe ass20 | nsnco | arena | same ye Pumping Charges 8061.6 CuM @ Rs.150/- Excluding GST 1209240 = 35290052.00 Gross total amount ‘Aulullional Cust 315672 It may be noted cost towards pumping of concrete has been added which was not considered earlier and Quantity of concrete has been amended as per sheet provided from site as per their requirement Sheet attached. Request you to accord your approval far amendment in purchase order and sanction the additional amount of 3,15,672 INR & having total amended PO value amount of Rs.3,52,90,092/- Saravanan —_—Mallikarjun Ghasne GZ Dude} AK Braden Silveria ‘Munish Kumar KL Agrawal VK Luthra, ae

You might also like