10A.

DAFTAR PERALATAN PENAMBANGAN YANG DIMILIKI PERUSAHAAN DAN KONTRAKTOR

PA MA UA EU Prod'ty Fuel Rate


Periode Jenis Peralatan Tipe Kapasitas Jml
(%) BCM/Jam, Ton/Jam Ltr/bcm, Ltr/ton

1 2 3 4 5 6 7 8 9 10 11
KOMATSU, LIUGONG &
Alat Gali - Muat Batuan Penutup/Waste CATERPILLAR 8 93% 82% 51% 42% 162 Bcm/Jam 0.15 Ltr/Bcm
Alat Gali - Muat Komoditas KOMATSU 1 97% 94% 53% 50% 193 Ton/Jam 0.16 Ltr/Ton
Alat Muat Batuan Penutup/Waste

Alat Angkut Batuan Penutup/Waste QUESTER, IVECO, HINO & 34 80% 72% 48% 35% 36 Bcm/Jam 0.24 Ltr/Bcm
MERCY
Alat Angkut Komoditas QUESTER 6 90% 81% 50% 41% 38 Ton/Jam 0.28 Ltr/Ton
KOMATSU D155 & CATERPILLAR
D8R & DRESSTA 5 52% 37% 49% 18% 0.13 Ltr/Bcm
Alat Pembongkaran Batuan (Bulldozer, Continous Miner,
Realisasi sebutkan…..) Batuan Penutup/Waste KOMATSU D85 & CATERPILLAR
6 85% 78% 61% 48%
Triwulan 1 D6R
Alat Bor untuk Peledakan Batuan Penutup/Waste
Alat Bor untuk Peledakan Komoditas
Fuel Truck Canter 2
Grader Caterpillar 535K &
Grader Liugong 4515D 2 83% 75% 56% 42%
Alat Penunjang Lainnya
Bus Karyawan 3
LV Strada Triton 8
Water Truck 3
10C. RENCANA DAN REALISASI JAM KERJA

Bulan ke- Bulan ke- Bulan ke- Bulan ke- Bulan ke- Bulan ke- Bulan ke- Bulan ke- Bulan ke- Bulan ke- Bulan ke-
Periode Parameter Jam Kerja Satuan Bulan ke- I II III IV V VI VII VIII IX X XI XII
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Hari Kalender Hari 31 28 31 30 31 30 31 31 30 31 30 31
Waktu tersedia Jam 682 616 682 660 682 660 720 732 720 744 720 744
Total Waktu Tunda (Delay Hours) Jam 91 83 92 90 141 89 250 252 282 313 - -
Libur Nasional (Public Holiday) Jam - - - - 55 - 12 24 - -
Pergantian Gilir Kerja (Change Shift) Jam - - - - - - 5 5 5 5
Istirahat Makan (Meals Breaks) Jam 62 56 62 60 57 60 60 60 60 60
Sholat Jum'at/ Ibadah (Friday Praying) Jam 4 4 4 5 4 4 4 5 5 4
Pemeriksaan Kesehatan Harian Jam 10 9 10 10 10 10 10 10 10 10
General Safety Talk Jam 4 4 5 4 5 4 5 4 4 4
Realisasi
Waiting Survey Jam 1 1 1 1 1 1 - - - -
Tahun 2022
Pengisian Bahan Bakar Jam 10 9 10 10 10 10 10 10 10 10
Peledakan Jam - -
Total Waktu Tunggu (Idle Hours) Jam 225 128 125 158 182 142 108 110 108 112 - -
Hujan Jam 155 92 90 105 121 94 63 63 75 87
Jalan Licin Jam 66 34 33 53 61 47 94 94 113 130
Kabut Jam 4 3 2 - - - - - - -
Fasting Jam - - - - - - - - - -
Total Jam Hilang Jam - 2 5 - - - - - - -
Total Jam Kerja Efektif Jam 366 404 465 413 360 430 362 370 330 319 720 744
10D. RENCANA DAN REALISASI PENGELOLAAN AIR TAMBANG

Periode Parameter Jam Kerja Satuan Bulan ke- I Bulan ke- II Bulan ke- III Bulan ke- IV Bulan ke- V Bulan ke- VI Bulan ke- VII Bulan ke- VIII Bulan ke- IX Bulan ke- X Bulan ke- XI Bulan ke- XII

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
mm atau
Curah Hujan/ Mata Air 23 14 16 27 23 25 14 20 18 16
liter/detik
Luas Catchment area
Ha 40.33 40.33 40.33 40.33 40.33 40.33 40.33 40.33 40.33 40.33
Tambang
Durasi Hujan atau aliran Jam 155 92 90 98 135 103 82 130 100 125
Debit air tanah m3 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800
Realisasi Dimensi Sump/ Fasilitas
Tahun 2022 Penampungan Air (P x L x D) 74x60x14 74x60x14 74x60x14 74x60x14 74x60x14 74x60x14 74x60x10 74x60x10 74x60x10 74x60x10

Kapasitas Sump/ Fasilitas


m3 15,200 15,200 15,200 15,200 15,200 15,200 27,600 27,600 27,600 27,600
Penampungan Air
Jumlah Pompa Unit 2 2 2 2 2 2 2 2 2 3
Kapasitas Pompa m3/jam 400 400 400 400 400 400 400 400 400 400
Produktivitas Pompa m3/jam 320 320 320 320 320 320 320 320 320 320
22A. RENCANA DAN REALISASI PENGGUNAAN BAHAN BAKAR CAIR

Stock Awal Realisasi Pembelian Jumlah (Liter) Realisasi Pemakaian Jumlah (Liter) Stock Akhir
Bulan ke- Minyak Pelumas Minyak Pelumas
Liter Solar (Liter) Bensin (Liter) (Liter) Biofuel (Liter) Avtur (Liter) Solar (Liter) Bensin (Liter) (Liter) Biofuel (Liter) Avtur (Liter) Liter

1 2 3 4 5 6 7 8 9 10 11 12 13
Januari 52,444 335,378 345,802 42,020
Februari 42,020 367,521 363,526 46,015
Maret 46,015 415,399 403,078 58,336
April 58,336 351,486 323,304 86,518
Mei 86,518 319,469 292,452 113,535
Juni 113,535 383,326 344,464 152,397
Juli 152,397 367,380 368,444 151,333
Agustus 151,333 255,610 321,888 85,055
September 85,055 303,541 296,863 91,733
Oktober 91,733 91,733
November 91,733 91,733
Desember 91,733 91,733
23B. RENCANA DAN REALISASI PENGGUNAAN USAHA JASA PERTAMBANGAN

A. Rencana Penggunaan Usaha Jasa Pertambangan Tahun 2022

Perizinan Penerimaan Tenaga Kerja Penanggung Jawab Operasional


Kontrak (Rp) Pembelanjaan
IUJP Invest Asing Surat Pengesahan
No Nama Jasa Kegiatan asi
Perusahaan Jasa Non Nasio
No. Izin Tgl Terbit Tgl Berakhir Bidang Usaha Masa Nilai Realisasi (Rp) Negara Daer Lokal Nasional Impo Lokal nal Jabat Juml Nama
Nomor Tanggal
Inti Kontrak (Rp) (Rp) ah r an ah

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Kegiatan pengupasan lapisan tanah penutup subbidang 028/SK/KTT-
PT Cahaya Riau Ijin Usaha Pertambangan Parulian 10 Juni
1 IUJP 57/1/IUJP/PMDN/2017 28 Agustus 2017 28 Agustus 2022 penggalian, pemuatan, dan pemindahan lapisa tanah 3 Tahun 29,700 45,375,000,000 0 3240 0 0 45,375,000,000 0 124 29 0 153 DAS/VI/
Mandiri Mineral dan Batubara Panjaitan 2022
penutup dengan/tanpa didahului peledakan 2022

Kegiatan pengupasan lapisan tanah penutup subbidang Edriadjie


029/SK/KTT-
2 PT Anak Tiga IUJP 374/DPMPTSP.V/IX/2017 28 September 2017 28 September 2022 Ijin Usaha Pertambangan penggalian, pemuatan, dan pemindahan lapisa tanah 3 Tahun 29,700 36,300,000,000 0 3240 0 0 36,300,000,000 0 31 2 0 33 Ramadhan DAS/VI/ 10 Juni
Bintang Mineral dan Batubara penutup dengan/tanpa didahului peledakan, kegiatan Adhiyayaks 2022
2022
eksplorasi, dan konstruksi a

3
4
5
6
7
8
9
10
11
24A. RENCANA DAN REALISASI PENGGUNAAN TENAGA KERJA IUP/IUPK

Kontraktor Realisasi Triwulan


Jumlah Tenaga Kerja Klasifikasi Perizinan TKA
Klasifikasi TKI
No
Jabatan Non Jumla TKA Latar dan Jenjang RPTKA
Lokal
Lokal h
1 2 9 10 11 12 13 14
1 Manajemen 1 - 1 - S1 Belum Ada
2 Profesional - - - Belum Ada
3 Teknisi 5 16 21 - S1, SMA Belum Ada
4 Administrasi 36 8 44 - S1, SMA. SMP Belum Ada
5 Terampil 93 1 94 - SMA, SMP Belum Ada
6 Tidak Terampil 2 - 2 - SMA, SMP Belum Ada
TOTAL 137 25 162 -