You are on page 1of 2

Kantor MMP Balikpapan

A B C D
15250
4935 5080 4935
300 300 300 300
4635 4780 4635

560
6 TOILET
KETERANGAN :
NF : ENFI
ENG : ENGINEERING STAFF
HR : HR STAFF
ENGINEERING CTR : CONTRACT STAFF
TOILET ARCHIVE CTL : CONTROL STAFF
NAIK FA : FINANCE &

3930
3370
D3 ACCOUNTING STAFF
TR : TRANSLATOR
SP : SPARE CUBICAL

TURUN PANTRY

560
5
D3

SERVER

3990
3430
NAIK
D3
560
4

VOID
20200
3980
3420

TURUN
560

3
ARCHIVE
3900
3340

STORAGE STAFF ENGINEERING

DENAH PINTU LANTAI 2


560

MEETING

11 PAX
ROOM
D2
3910
3420

D:\DATA LAPTOP\Jojo Wiharja\MPS\BALIKPAPAN KALTIM\PROJECT\logo_mmp_new.jpeg

ENGINEERING Gedung Commodity Square,


MANAGER Lantai 9, Jl. Gatot Subroto,
Kav 35-36, Kuningan, Jaksel.
420

MMP 1 : 100
DENAH PINTU LT.2
SKALA 1 : 100
Kantor MMP Balikpapan

KETERANGAN :
NF : ENFI
ENG : ENGINEERING STAFF
HR : HR STAFF
CTR : CONTRACT STAFF
CTL : CONTROL STAFF
FA : FINANCE &
ACCOUNTING STAFF
TR : TRANSLATOR
SP : SPARE CUBICAL

02 FRONT ELEVATION
02 FRONT ELEVATION

1
1 2
01 PLAN (D2)
DETAIL PINTU D2 & D3
01 PLAN (D3)

D:\DATA LAPTOP\Jojo Wiharja\MPS\BALIKPAPAN KALTIM\PROJECT\logo_mmp_new.jpeg

Gedung Commodity Square,


Lantai 9, Jl. Gatot Subroto,
Kav 35-36, Kuningan, Jaksel.

NOTE:
ACCESORIES PINTU SAMA
SEPERTI EXISTING 1 : 20
MERK SETARA

03 DETAIL 1
03 DETAIL 1 04 DETAIL 2

You might also like