Professional Documents
Culture Documents
Bonsai Courtyard: A. Unit Paving On Grade at Planting F. Unit Paving On Grade at Asphalt
Bonsai Courtyard: A. Unit Paving On Grade at Planting F. Unit Paving On Grade at Asphalt
REVISIONS
GEOGRID TEXTILE
3 - 1/4" TAPCON
BOLT @ 18" O.C. 1/4" x 8' CARBON STEEL ANGLE
3/8" ROUNDED STONE
3"
DRAWINGS
3/8" CRUSHED STONE BASE
LOCATE AERATION PORT IN AREA
WITHOUT SLAB. COORDINATE CONTINUOUS GEOTEXTILE
1/4" x 8' CARBON STEEL ANGLE REINFORCEMENT LAYER, SEE SOILS
WITH PAVER LAYOUT TO
REPLACE ONE HALF (1/2) PLANTING SOIL, SEE SOILS PLANS FOR
TYPICAL PAVER WITH NO
3"
EXTENTS. TAPER AGGREGATE TO
REV #02
REV #03
REV #04
DISRUPTION TO PAVING MAXIMIZE PLANTING SOIL AROUND
ALIGNMENTS OR PATTERN. SEE ROOTBALL 1
IRRIGATION DRAWINGS FOR
REQUIRED QUANTITY. TYPICAL GRANITE PAVERS ON
V01
PLANTING SOIL, SEE PLANS FOR
LOADING
1"
8' - 0" 3"
4"
MM/DD/YY
3 01/04/23
4 01/09/23
10/17/22
2 12/30/22
BONSAI COURTYARD
STEEL EDGE RESTRAINT DETAILS AND SPECIFICATION
1
ALIGN STEEL EDGE TO PAVER EDGE
1
8'-0"
±2'-0", SEE ENLARGEMENT PLANS
3"
GRANITE SETT PAVING ON PLANTING
SOIL
DRIP TUBE, SEE IRRIGATION
1/4" x 8' CARBON STEEL ANGLE DRAWINGS
CONTINUOUS GEOTEXTILE
CIP CONCRETE PAVING ON REINFORCEMENT LAYER, SEE SOILS
4"
PLANTING SOIL, SEE PLANS
FOR REQUIRED LOAD SLOT DRAIN WITH METAL PLATE, SEE L710
1"
8' - 0" 3"
4"
1
CENTRAL GROVE
STEEL EDGE RESTRAINT DETAILS AND SPECIFICATION
6 FULL PAVERS
± 5'-2"
CONSERVATORY COMPLEX
SCALE
3"
CASCADE GARDEN
STEEL EDGE RESTRAINT DETAILS AND SPECIFICATION
A 02