VOLUME SAT HARGA SATUAN JUMLAH HARGA
BULAN I
No. URAIAN PEKERJAAN BOBOT (%)
M-1 M-2 M-3 M-4
VOLUME RAB
7 Hari 8 Hari 7 Hari 8 Hari
29.18
27.31
20.56
17.10
17.67
W
VOLUME SAT HARGA SATUAN JUMLAH HARGA
BULAN I
No. URAIAN PEKERJAAN BOBOT (%)
M-1 M-2 M-3 M-4
VOLUME RAB
J. Pek. Ring Balok Beton Bertulang 12/20
1 Pek. Bekisting 8.00 M2 Rp 162,176.55 Rp 1,297,412.40 0.176
2 Pek. Pembesian 178.43 Kg Rp 14,382.27 Rp 2,566,228.44 0.348
3 Pek. Beton K 255 0.88 M3 Rp 1,082,351.40 Rp 952,469.23 0.129 29.18
12.73
VIII PEKERJAAN PENGECATAN
1 Pek. Pengecetan Dinding Lama Exterior 213.00 M2 Rp 17,562.20 Rp 3,740,748.60 0.508
2 Pek. Pengecetan Dinding Baru Exterior 281.45 M2 Rp 25,036.05 Rp 7,046,396.27 0.957
3 Pek. Pengecetan Bidang Besi 427.96 M2 Rp 26,223.75 Rp 11,222,716.05 1.524
4 Pek. Pengecetan Calsiplank Lebar 30 cm 52.80 M2 Rp 34,644.21 Rp 1,829,214.29 0.248
IX PEKERJAAN LAIN-LAIN
Pekerjaan Pas. Pintu Plat Motif Cakar Ayam (tebal 2,3 mm) Sisi Luar, Rangka Besi Kotak 8.02
1 15.50 M2 Rp 1,000,000.00 Rp 15,500,000.00 2.105
4x6 (tebal 2 mm) Lengkap Denga Rel Atas Lengkap Dengan Kunci dan cat
2 Pekerjaan Pas. Ventilasi Jalusi Besi Siku 3x3 Jeruji besi beton 10 sni 45.00 M¹ Rp 300,000.00 Rp 13,500,000.00 1.833
5.76
3 Pekerjaan Perbaikan Tali Swing Rangka Kuda-kuda Baja 1.00 Ls Rp 15,000,000.00 Rp 15,000,000.00 2.037
4 Pekerjaan Balok Baja Baja IWF. 150 x 75 x 5 x 7 840.00 Kg Rp 28,360.50 Rp 23,822,820.00 3.235 3.235
5 Pekerjaan Pembuatan Nama Kantor / Gedung
* Pasang Huruf Tinggi 20 cm ( GUDANG A ) 140.00 cm Rp 50,000.00 Rp 7,000,000.00 0.950
* Pasang Huruf Tinggi 30 cm ( BPKAD ) 150.00 cm Rp 50,000.00 Rp 7,500,000.00 1.018
X PEKERJAAN AKHIR
1 Pekerjaan Pembersihan Akhir (Buang Bongkaran Keluar Lokasi) 1.00 Ls Rp 13,500,000.00 Rp 13,500,000.00 1.833
0
Di Periksa Oleh
KONSULTAN PENGAWAS
CV. LIMA DIMENSI
99.68
97.84
89.90
86.66
65.01
63.11
58.57
89.90
86.66
99.68
65.01
97.84
63.11
0.270
0.776
0.605
0.270 58.57
1.264
0.916
89.90
0.270
0.998
0.723
86.66
0.037
0.241
0.124
0.683
3.039
1.109
0.363
1.617
0.443
1.638
4.912
3.318
38.16
0.391
1.272
0.450
65.01
29.18
63.11
27.31
58.57
20.56
17.10
17.67
38.16
0.176
0.348
29.18 0.129 99.68
97.84
0.281
1.146
27.31 0.338
4.358
3.197
0.093
1.904
11.039 89.90
20.56
3.016
17.10
86.66
17.67
4.436
1.480
1.683
12.73
0.508
0.957
1.524
0.248
8.02
2.105
1.833
5.76
2.037
0.950
1.018
1.833
0
63.11
AGUS
DIREKTUR
TIME SCHEDULE
PEKERJAAN : REHABILITASI GEDUNG A GUDANG INDUK BPKAD
PROVINSI SULTENG
NOMOR KONTRAK : 602/130.67/SPK.1/BPKAD-2022
TANGGAL SPMK : 7 Oktober 2022
WAKTU PELAKSANAAN : 85 HARI
21.46
17.10
16.88
12.73
VOLUME SAT HARGA SATUAN JUMLAH HARGA
BULAN I
No. URAIAN PEKERJAAN BOBOT (%)
M-1 M-2 M-3
VOLUME RAB 29.1
K. Pek. Ring Balok Beton Bertulang 15/30 (RB.1) 29.65
IX PEKERJAAN LAIN-LAIN
Pekerjaan Pas. Pintu Plat Motif Cakar Ayam (tebal 2,3 mm) Sisi Luar, Rangka Besi Kotak
1 16.00 M2 Rp 1,000,000.00 Rp 16,000,000.00 1.976
4x6 (tebal 2 mm) Lengkap Denga Rel Atas Lengkap Dengan Kunci dan cat
7.36
2 Pekerjaan Pas. Ventilasi Jalusi Besi Siku 3x3 Jeruji besi beton 10 sni 49.02 M¹ Rp 300,000.00 Rp 14,706,000.00 1.816 5.76
3 Pekerjaan Perbaikan Tali Swing Rangka Kuda-kuda Baja 1.00 Ls Rp 15,000,000.00 Rp 15,000,000.00 1.852
4 Pekerjaan Balok Baja Baja IWF. 150 x 75 x 5 x 7 840.00 Kg Rp 28,360.50 Rp 23,822,820.00 2.942 2.942
5 Pekerjaan Pembuatan Nama Kantor / Gedung
* Pasang Huruf Tinggi 20 cm ( GUDANG A ) 140.00 cm Rp 50,000.00 Rp 7,000,000.00 0.864
* Pasang Huruf Tinggi 30 cm ( BPKAD ) 150.00 cm Rp 50,000.00 Rp 7,500,000.00 0.926
X PEKERJAAN AKHIR
1 Ls 13,500,000.00 Rp 13,500,000.00 1.667 0
Pekerjaan Pembersihan Akhir (Buang Bongkaran Keluar Lokasi) 1.00 Rp
Di Periksa Oleh
KONSULTAN PENGAWAS
CV. LIMA DIMENSI
100.00
98.33
90.90
87.28
74.79
0.198 70.32
70.92
1.045
2.016
0.702
68.23
64.12
56.79
87.28
74.79
1.036 100.00
2.493
0.701 98.33
64.12
0.826
0.993
0.498
1.179
1.480 56.79
1.017 90.90
0.967
1.195
0.854 87.28
0.355
0.677
0.147
0.721
2.734
0.976
43.94
0.769
1.468
40.89 0.391
2.109
4.841
2.929
70.92
0.446
1.308
0.376
68.23
0.040
0.067
0.016
29.18 64.12
29.65
21.46
17.10
16.88
12.73
43.94
40.89
0.613
0.932 100.00
0.307
98.33
4.096
3.005
0.244
2.692
21.46 9.849
4.663 90.90
17.10
16.88 0.294
1.531
0.023
87.28
12.73
0.999
1.046
1.340
0.231
1.976
7.36
5.76 1.816
1.852
0.864
0.926
0 1.667
0
70.92
64.12
Palu, 05 Desemberr 2022
Di Periksa Oleh
KONTRAKTOR PELAKSANA
CV. CELEBES MANDIRI SEJAHTERA
AGUS
DIREKTUR
43.94
TIME SCHEDULE
PEKERJAAN : REHABILITASI GEDUNG A GUDANG INDUK BPKAD
PROVINSI SULTENG
NOMOR KONTRAK : 602/130.67/SPK.1/BPKAD-2022
TANGGAL SPMK : 7 Oktober 2022
WAKTU PELAKSANAAN : 85 HARI
4 Biaya Manajemen/Perlengkapan K3 (Helm, Sepatu, Rompi, Sarung Tangan, dll) 1.00 Set Rp 7,982,500.00 Rp 7,982,500.00 0.986 0.986
5 Pek. Pembongkaran Dinding Batu Bata Gedung Gudang Existing 75.41 M3 Rp 148,100.00 Rp 11,168,499.43 1.379 1.241 0.138
6 Pek. Pembongkaran Kusen Pintu, Jendela, dan Ventilasi Gedung Gudang Existing 82.15 M2 Rp 80,800.00 Rp 6,637,316.00 0.820 0.820
7 Pek. Pembongkaran Atap dan Rangka Kuda-kuda Gedung Gudang Existing 58.50 M2 Rp 8,769.00 Rp 512,986.50 0.063 0.063
8 Pek. Pembongkaran Pondasi Batu Kali Gedung Gudang Existing 31.02 M3 Rp 111,750.00 Rp 3,466,485.00 0.428 0.428
9 Pek. Pembongkaran Beton Bertulang Gedung Gudang Existing 8.15 M3 Rp 1,102,585.20 Rp 8,986,863.24 1.110 0.999 0.111 100.00
10 Pek. Pembongkaran Plafond Gedung Gudang Existing 519.75 M2 Rp 7,450.00 Rp 3,872,137.50 0.478 0.239 0.239
11 Pek. Pembongkaran Lantai Keramik Gedung Gudang Existing 195.00 M2 Rp 11,920.00 Rp 2,324,400.00 0.287 0.287
12 Pek. Pengupasan Kolom Sampai Permukaan Begel Gedung Gudang Existing 126.00 M2 Rp 22,350.00 Rp 2,816,100.00 0.348 0.348
- 90.90
43.94
40.89
WAKTU PELAKSANAAN PEKERJAAN
VOLUME SAT HARGA SATUAN JUMLAH HARGA
BULAN I 56.79 II
BULAN BULAN III
No. URAIAN PEKERJAAN BOBOT (%)
M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M - 10 M - 11 M - 12
VOLUME RAB
E. Pek. Kolom Praktis 12/12 (K.4)
1 Pek. Bekisting 18.05 M2 Rp 159,179.55 Rp 2,872,872.52 0.355 0.355
2 Pek. Pembesian 381.39 Kg Rp 14,382.27 Rp 5,485,323.68 0.677 0.677
3 Pek. Beton K 255 1.08 M3 Rp 1,098,231.15 Rp 1,189,252.55 0.147 0.147 100.00
IX PEKERJAAN LAIN-LAIN
Pekerjaan Pas. Pintu Plat Motif Cakar Ayam (tebal 2,3 mm) Sisi Luar, Rangka Besi Kotak
1 16.00 M2 Rp 1,000,000.00 Rp 16,000,000.00 1.976
4x6 (tebal 2 mm) Lengkap Denga Rel Atas Lengkap Dengan Kunci dan cat 1.976
2 Pekerjaan Pas. Ventilasi Jalusi Besi Siku 3x3 Jeruji besi beton 10 sni 49.02 M¹ Rp 300,000.00 Rp 14,706,000.00 1.816 7.36 5.76 1.816
3 Pekerjaan Perbaikan Tali Swing Rangka Kuda-kuda Baja 1.00 Ls Rp 15,000,000.00 Rp 15,000,000.00 1.852 1.852
4 Pekerjaan Balok Baja Baja IWF. 150 x 75 x 5 x 7 840.00 Kg Rp 28,360.50 Rp 23,822,820.00 2.942 2.942
5 Pekerjaan Pembuatan Nama Kantor / Gedung
* Pasang Huruf Tinggi 20 cm ( GUDANG A ) 140.00 cm Rp 50,000.00 Rp 7,000,000.00 0.864 0.864
56.79
* Pasang Huruf Tinggi 30 cm ( BPKAD ) 150.00 cm Rp 50,000.00 Rp 7,500,000.00 0.926 0.926
X PEKERJAAN AKHIR 0
1 Pekerjaan Pembersihan Akhir (Buang Bongkaran Keluar Lokasi) 1.00 Ls Rp 13,500,000.00 Rp 13,500,000.00 1.667 1.667
RENCANA PROGRES MINGGUAN KONTRAK 0 7.36 9.52 4.58 8.19 14.29 20.19 4.10 2.69 16.36 3.62 7.43 1.67
RENCANA KOMULATIF PROGRES MINGGUAN KONTRAK 0 7.36 16.88 21.46 29.65 43.94 64.12 68.23 70.92 87.28 90.90 98.33 100.00
5.76 6.97 4.37 12.08 11.71 15.90 13.53 4.47 4.701685 2.927073 14.9627741
REALISASI KOMULATIF PROGRES MINGGUAN KONTRAK 0 5.76 12.73 17.10 29.18 40.89 56.79 70.32 74.79 79.50 82.42 100.00
43.94
29.65
29.18