You are on page 1of 20
TEST CERTIFICATE Concerning examination, load test ‘and controlling of Spreader. Examination made : 2012-10-30 1. Customer : Shanghai Zhenhua Heavy Industry Co. Ltd Enduser :China Merchants Colombo CICT , Sri Lanka Adjustable hoisting gear for ISO container 20’, 40', 45°, Type : STS 45, Serial Number : 16112 Manufacturer : BROMMA. General drawing : BR1102527, Material : High Tensile Steel & Fine Grain Stee! Spreader weight : 12.2 Tonne 0. Load test carried out with a max. of 150% overload a OMPraaron 11 Safe Working Load (SWL) :Single 51 Tonne & Twin 2 x 32.5 tonne. 42, Test load of twistlocks to 40 tonne for serial number SINGLE : WQ 7811 , WQ.9895 " WQ 9896 , WO 8936 and TWIN WQ 9931 , WQ 9933 , WO 9962 , WO 8939 . As a result of this examination we the undersigned find nothing which will prevent the use of above load gear for the loads presented in the data sheet. Remarks The load gear is to carry attached signs stating manufacturer, production number, year of manufacture and SWL - max. load Enclosed: Spreader data sheet BROMMA 2012-10-30 FAIZI ‘Test Centfcate_QEI 16.0 Rev (01) TWISTLOCK-CERTIFICATE CUSTOMER. Shanghai Zhenhua Heavy Industry Co. Ltd. CUSTOMER ORDER NO. ZP12-1873-0004 BROMMA SPREADER / ORDER NO. 16112 DATE. 30" October 2012 This is to certify that the following twistlocks have been proof tested to 40 tonne’s load. No visible deformation occured. The twistlocks have been stamped on the end face with a B/C stamp and 40. tonne. QTY. TYPE. DWG. MATERIAL. PARTNo. SERIALNo. MILL CODE 8PCS ISO 1002763 SS 2541-03 1002763 1. WQ7811 Wis 2. WQ 9895 wie 3. WQ 9896 wis 4, WQ 8936 wWi6 5. WQ 9931 wis 6. WQ 9933 wWié 7. WQ 9962 wie 8. WQ 8939 wis SIGN FAIZI DATE| 30” October 2012 ‘Twistlock Certificate_QE! 16.0 Rev (01) MF IN-PROCESS -DIMENSION INSPECTION REPORT (Rev 3) |BROMMA ER she fem [Customer [Eien WERCHANTS COEMIBC CC Set LANKA, Model = a Telescopic Beam ISeation RA [At (Top Side) eso se al e 'x2 (Bottom Side)_|_\ >= = [iret ri ‘Section 6-6 Bt (Top Side) Tee] 2 [ee ee \B2 (Bottom Side) 43 V>83 43 [Section OC [C1 (Top Side) so BY TDSy ay |C2 (Bottom Side) SO ey i283 +3 [2 Dimensional Inspection Satisfactory | Not Satisfactory Reetify Result [Above Dimensional Inspection Result — Inspected BY Aopig@d By Name: -AQIC Name: MAD Pert [Designation : Fab. inspector Designation ‘Supervisor pate: WS fiof\e loate: 1S Popye ‘TBU In Process Dimension Inspection Report AE! 70 Rev (03) = MF IN-PROCESS -MPI INSPECTION REPORT (Rev 3) BROMMA pe: leva Feisieeret CHINO MeeCHHS COLOMBO clei, etc WKA moder tus wing [PeyodSd FAniele® | LesDI-SIF [I: MAGNETIC PARTICLE INSPECTION ( FRESH |REANSPECT) TTEM INSPECTED : AS SHOWN, ate fee |[) e ; f We (7 oh Test Equipment chemical Used Hagnaiox We Cones Pant [Euipmont Used ote Magna nk THE [SwanerRemover | —SkC-5 Tocation Judgment 4 EEPT REIECT 2 BEREPTTREIECT 3 ‘BOGEREFREIECT a BOCEPPTRESECT = ‘BEDE REJECT 6. “BGREPTIREIECT 7 “AGEEFFI REJECT g ‘SGCEPTFREJECT Judgment -Aceept Reject Visual Welding Inspection Satistactony+ Not Satisfactory Inspected By Name wa Designation Fab Inspector ‘Qualification ASNT Levelt Date of inspection A$ io Note: Acceptence enter of te weld quality shal compiy with the requirements of BS EN 1281 A fnshing ana rough edges shal be smoothly rounded IME in-Process MPI Inspection Report_OE! 6.1 Rev (03) * MF IN-PROCESS -MPI INSPECTION REPORT (Rev 3) BROMMA FONT pae Iota pene inen tw MERCHARIC CoLomes CICT_ SPILANEA Model eisus — [Prwinge —[bxyo3s9 7 [ance [BRUIOIED | [1. MAGNETIC PARTICLE INSPECTION ( ERESF/ REINSPECT) ITEM INSPECTED : AS SHOWN drawing pene tual cee —T] 4 Test Equipment (chemical Uses ‘Magnafin White Contrast Paint [Eauioment Used "Yoke Magnetic nk 7HE [CleaneriRemovor SKC S Location ‘Judgment 1 ROCEPT REE 2 ACCEPT SEI 3 ‘AGGEPT/ BEVEET 4 ACCEPT BEJEET 5 ‘ACCEPT BaveCT™ @ TAGGEPT/BEvECT 7 ACCEPT / REJECT 8 ACCEPT EVECT™ Judgment - Accept / Visual Welding Inspection: Satisfactory /Not Salstactonr Inspected By Name — Ae ah Designation Fab. Inspector Qualification ‘ASNT Level Date ot ezecion Glo Noe: Accoptance rtf of ewok Gully shal compl wi te rqueent of 8S EN 128 Aifeihig ond ough edges shal be smn rounee. IMF in-Process MPI inspection Repot_OEI 6.1 Rev (03) ‘TBU IN-PROCESS -MPI INSPECTION REPORT (Rev 3) BROMMA ap ene Iota. ¢__[Pustomer HIND MEPCKARTS COLCMIES CCT OM LALEA [Model sisys [Drawing # Pp(1c2S 29 [Article # Besos F [1. MAGNETIC PARTICLE INSPECTION ( FRESH / REANSPECH) ITEM INSPECTED : AS SHOWN 1 ACCEPT / REVECT ACCEPT) REJECT ACCEPT / REJECT 2 =z 4 ACCEPT/ REJECT Judgment - Accept / Reject Visual Welding Inspection: Satisfactory / Not Satisfactory Inspected By Name el a Designation Qualification Date of Inspection Fab. Inspector ASNT Level rao cory ras e fevsed ae fect Coen Fb icleeeaariak Frame No# [_Beam1# | Beam 1# felescopic Beam Uni To or | C799 Test Equipment [Chemical Used Magnaflox White Contrast Paint [Equipment Used Yoke Magnetic Ink THF [CleaneriRemover SKC-S Location Judgment Note: Acceptance criteria of the weld quality shall comply with the requirements of BS EN 1291 All finishing and rough edges shall be smoothly rounded, ‘TBU In-Process MPI Inspection Report_QEI 6.1 Rev (03) ‘BU IN-PROCESS -MPI INSPECTION REPORT (Rev 3) BROMMA zr eae io [Customer ee WEPCHARIS COLOM EC |] se9 te i Datumnn x. nesasaait senamionti)—y~ | fr = =a pf Ravoceaa—TEPGEIT Si ntaaner EPOGT sake cocoons Ee aan: fame AWS ON Aes Overal Hesutt: PSS [ame Overall Result: PASS / FAIL, imotncon “megaronnnonss net Pe aaa a mat =< 2 Ka soca oo shana es a | ny nouetenatinespcon fester a psoas OE acon in beam PAU mpaion hci a7 8) Ansnaan ct reenact MA ae snc ma Zz a Se Zane CTS TRE OFZ = gee ery ee Tene era ae — —— — ae = — —] same onaad ame] owe | orem | oom | ee i Tapoint (A) | — Top View \<—__ Top doin (6) Ly ea I y _— Bottom Joint (A) SN ‘Bottom Joint (8) — mae A+ oe = ——4 Axe ca TPOCHAT 7 USM Krauitramer (EPOCH 7 fea ere aay ata: en ticonones mFS. — fcedes | neitoceormrenistet ms vette ar ee crater wahenatest x cee ha oes Cle ae ae en make esto boon aoe eee eeicemereecerems Soe aT = pada Sol a eae TELESCOPIC BEAM UT INSPECTION a&PORT Fra Boe Fei-aaane | —JSTSSS ran aaa fest [ie RAS eae CLE eb Sore eon oe ine fac ase fe a fai Zi foment motor a Sor Canes nm mae * “eine [IRE FOR pea : agen | ogame” | 5 so ear oe ‘ = Tae = [ete te > Eee ~ Bears ; <_1#0 E a 3 Co fe Ly Des ortny car] oy 3 y Material Ticness:2#°2.9 men f b= 3 om Wainer; Rite 5 stencrndoer; Gro i Cone tae Pate sy | rte eeney ste let Som ee ° ae is oo es msm tox th oto om Javanese DEPORT 7 UM RCN TEPOGTT rout TINE 8 renin fears semen ner? TT Seay Jenne cade ‘ema oeOnt ter? Soranieks oer an nee Gam Li mee [a ae, ‘ai genenon niet) 5 tspetion rept es enone a he tne of ection 6 f UT was care ov on 100m tr ste weld or he ees the welling D-D heaped by Gee ,@ H) Aecepted by Ferrel . renee feo Gee re = Deseo Fan Mare beer NOT = ro [sateen FO = ose ofinopecton ay Oia [ote of wsoecon: 15 [00 enon teem PUT ecto chest 879018) Frama Peeme frereawe [Oo W [roe WR WOES. od tse Za uanea fare Bane [21420 crt rir Ta Hee fies rai -oackto [SO OS™ for sts ue arn ven [nes aca-sacnne |\30 208 ewan C330 > Front View se%mm « sie eect on * fomt [Bama FOR] Gace T387 Trnawan i igo [Pagens”| Sere [ we [ oom | Be z & [8a Sofesetet | [e349 Tse 3=e |e) Ls Se ‘slick E . & Te See stole] a C Take Ra . cea eetaeen ite ten Aelia vir sate Tee but at rant a » Surcecansten > Cen ceunon wal pper Pte ccheda Probe Faqveny sive nett Seaningdt Range iS ote 010mm bho ab = te 25 he 13m a ed i bar USM EGER S/N 5S caliraten ck VAV2 8 rammareeenceleck roca no BOREL Rv? imped ehsoeaedy acemrmceCode rua du [800613 Rev? Sant nenks eee Saints a lenates 3 ws sae ZO” zt ic een Loree Stn ebro gu ee ea eee 2 Sec rnignetto xe frente E che 4. abn ie en [eseradon wor pecan aT Pesenton: NOT as eckPan RET pectin et sapere th tne tapaon [aitcton-ren lomirenen: Pod Ut of napections (STOTT, [bate omepecton: \STighi m 8 BROMMA [rice ac [forget onrne [t2p120-4 [wider 6 DIAS TAT sine fens sang Gango ad, Siavia [nest oacie |31630-E snare ig ("06 [web Patel Bach no \2OROR. A IMoaet SSS erat no Ae [weorine? orenne [roe 30-41 sor Name C32 ‘en Front View = i ad oe 3 Pisa [sae et fon aa ; red etd ioe 8e eB Fane isfishe ramen + hexged oe S Ge in| gan stile we od Sic Rewttioner: 3+ 90 mm bs gm ‘slate Suutonien: ln Gre con wate ae ise rote fener sue ett) Samangss sage ° er ey ae Oe srs mam wth etm Jwoncco “USMS Sno OHS Jennies Vist & tomar it rowaveno amacrine? Tear eed conc Cie ras an/on 302 ‘nities sat) Sateen at oem: EE ura fame ae (ni 2 ido on master ns focon SS 2 Std eeerttvat jones Cae Presi emetic [Fazal cain] 4 Alanerin tint session Nor REO [fester NOT a 5 Inpacen ea erporedin alte ie icin Jaton now A ntsc Penn: Ral UT pasar Date of rpection re fosteatiipecion: < WgOo | si é ES —_ ay? ee Ss Couplant [wallpaper Paste. laccoptance Code = Para 80st AM/BOPGL 3 ev2 Cmte SOD cane ee — so a er Single lift two brackets (T) Proof loading with four cylinders SINGLE LIFT WITH TWO BRACKETS Proofloading Bromma Spreader STS45 Customer Shanghai Zhenhua Industry Co. Ltd Serial Number. 16112 General Assembly Drawing. BR1102527 Safe Working Load 51 Tonne Proof Load 150% Tare Weight 12.2 Tonne Weight of Test Equipment 2 Tonne Cylinders Used 4 [Pressure [From Pump [Load In Tonne “Measure point mm lin Bar [Load Load lt cyl. iineach jin each |A=71,2em? _|Cylinder [Twistlock 1 2 3 5 81 6 2] tse [ei aby TSF, 207 15) ay ia [Oat | 379 155 286 21 mf 187 [as | Sap Ist 365: 27 23f (S| sir By ay 81 6 2 FT 37 [Deo Ts¥ Equipment Name: Pressure Gauge (Hi-Force HG 1) Control Number: CP3994 Calibration valid date: 27th Feb 2013 Proof Load Test Report_QE! 17.0 Rev (04) Twin lit, two brackets Proof loading with two cylinders ‘TWIN LIFT WITH TWO BRACKETS Proofloading Bromma Spreader STS45 Customer Shanghai Zhenhua Industry Co. Ltd Serial Number. 16112 General Assembly Drawing. BR1102527 Safe Working Load 2x 32.5 Tonne Proof Load 150% Tare Weight 12.2 Tonne Weight of Test Equipment 2 Tonne Cylinders Used 2 A B st" a"! en Fa i i BROMMA 1 i ‘|___ BROMMA © Da O©® [Pressure [From Pump |Load In Tonne lin Bar Load JLoad Measure points (mm) 2 eyl. jin each in each A B |A = 71,2 cm? |Cylinder |Twistlock | _1 2 3 4 5 6 a 5 1] 12} osq_| 330 | aqo | es | 3 150 i 72 | 242 | 233 [343 24g _| Ue 200 15| i 1s3_| 2e¢ | 039 | 244 | O72 | 1 452, 33] 1s] (s¢ 274 24 | 283 | 354 IEF 69 5 il 6 ao | 3% | 24) | 24 | IK [UNDER SUPERVSIONOF SIGNATURE DATE FAIZI 29-Oct-12 Equipment Name: Pressure Gauge (Hi-Force HG 1) Control Number: CP3994 Calibration valid date: 27th Feb 2013 Proof Load Test Report_QEI 17.0 Rev (04) Proof loading with four cylinders FOUR EYES WITH TWO BRACKETS Proofloading Bromma Spreader STS45 Customer Shanghai Zhenhua Industry Co. Ltd Serial Number. 16112 General Assembly Drawing. BR1102527 Safe Working Load / Gable End Eye 4x 16.3 Tonne Safe Working Load / Main Frame Eye 4x 16.3 Tonne Proof Load 150% Tare Weight 12.2 Tonne Weight of Test Equipment 2 Tonne Cylinders Used 4 BROMMA ; BROMMA @ b 4 |Pressure \From Pump {Load In Tonne Measure point mm In Bar [Load iLoad I4 cyl. ineach jin cach |A=71.2cm?__|Cylinder |Eye 1 3 4 217) 16 12.2) 1a or Wid 301 22 18,3) A ot nih 385) 28) 244) Nie ok Ale 82) 6 2.4] nA OK oe Nip Equipment Name: Pressure Gauge (Hi-Force HG 1) Control Number: CP3994 Calibration valid date: 27th Feb 2013 Proof Load Test Report_QEI 17.0 Rev (04) Proof loading with four cylinders FOUR EYES WITH TWO BRACKETS Proofloading Bromma Spreader STS45 Customer Shanghai Zhenhua Industry Co. Ltd Serial Number. 16112 General Assembly Drawing. BRI1102527 Safe Working Load / Gable End Eye 4x 12.8 Tonne Safe Working Load / Main Frame Eye 4x 12.8 Tonne Proof Load 150% Tare Weight 12.2 Tonne Weight of Test Equipment 2 Tonne Cylinders Used 4 Pressure From Pump {Load In Tonne Measure point mm In Bar Load JLoad \4 cyl. in each fin each A=71,2em*_|Cylinder |Eye 1 2 3 75) 5| 19) Kulp wh 181 13| 9.6[_ OF win |_ Nin 247| 18 143[ OK We | nie 312 2B 19.a| 2 hia_|_7®_[_ak 75 3 19] win _| 76 [ “UNDER SUPERVISION OF DATE FAIZ 29-Oct-12 Equipment Name: Pressure Gauge (Hi-Force HG 1) Control Number: CP3994 Calibration valid date: 27th Feb 2013 Proof Load Test Report_QE! 17.0 Rev (04)

You might also like