Dear Pak Weiber, Please see attached SOW and Budget for Ci A.PD provided equipment ting Phase-2 for approval 1. New 2set of MDB 500LA01 including connecting bus-bar 2. New 1set Auxiliary DP for Compressor 3. New 2set Field Distribution Board 4. New 1set Auxiliary DP Cooling Tower B. Contractor provided materials. 1. Contractor Scope of Supply 2. Cable 3.3Kv and 4.0kv 3. Cable ladder/tray and fittings C. Dismantling, Re-Installation and Permanent Removal Works 4. Dismantling and Re-installation Works. 2, Removal of existing Panel (ise) and LV Cables & handover to PD warehouse D. Equipment Queries ongoing with Siemens and other vendors 1. MrYogi Permadi HP+ 62-811-887-1830 yooi,permadi@siemens.com 2. Mr. Gilberth _HP+ 62-811-9690-126 gilberth.sitohana@siemens.co 3. Other Vendors -ongoing Regards. wg aul Project No. KT2M = 3522-2107 INDAH KIAT KARAWANG | Document No.| P-RT2M-500-04-SOW-0002 APP PROJECTS Revision No. 0 sinarmas SCOPE OF WORK Page Tora MACHINES Ey bnte.g | s8ueDste| October 20,2022 SCOPE OF WORK CONVERTING TISSUE MACHINE #6 & 7 PHASE-2 Reviewed By ‘Approved By ‘Approved By Prepared By Bayan M Monzon Wei Yen Chun Babu C Thomas Jen Tseng Chao “hls docu ta be covadeod cartier roto eprocuces in te ot npr by any moana without he pr Project No. KT2M = 3622-2107 INDAL oe Document No. | P-RT2M<300-04-S0W-0002 Va APP Revision No. 0 4 sinamas SCOPE OF WORK Page Toth — CONVERTING TISSUE MACHINE #6 & 7PHASE.2| ‘Sete Date ‘Deateenn 2078 Rovision Summary Oct.20,2m2 | 0 Iseued for Quotation yea Yow Brie. & “Ths document to be caneiered owen and shat rot ba raprouced wal cin pat by any means wont the por Sritom consent indatek Proje Fan Project No. KT2M — 3622-2101 INDAH KIAT KARAWANG Document No,|_ PoKT2NE PROJECTS jecumant No, 300-04-SOW-0002 Revision No. 7 ‘SCOPE OF WORK Page THR CONVERTING TISSUE MAGHINE# 8 & 7 PHASE.2| — '*5¥2 Date October 20, 2022 @® “Ths doomanie tbe conser corset, meane wot the pt ProjectNo.| KT2W 3822-2707 INDE Eaald oo Document No.| P-KT2M-300-04-SOW-0002 APP Revision No. v sinarmas ‘SCOPE OF WORK Page Faa CONVERTING TISSUE MACHINE# 8 & 7 PHASE.2 | '98u2 Dato October 20, 2022 Table of Contents 1. PROJECT SUMMARY 4.1 Project Description 2, OVERVIEW 3. INTERNATIONAL STANDARD AND REFERENCE. 4. CONSTRUCTION WORKS 5, REQUEST BIDDERS TO PROVIDE 5.1 Project Experiences 5.2 Company Registered Capital 53 Company Certificate 54 Man Power quantity and grade 55 Project Schedule 56 Technical Proposal 5.7 Commercial Proposal 5.8 Guarantee of Lifetime and Performance 6, PROJECT MANAGEMENT 6.4 Project Control 6.2 Report and Review 63 Documentation 64 Manpower 7, PROJECT EXECUTION 8, SCOPE OF SUPPLY 9. CONSTRUCTION POWER SCHEDULE 10.ATTACHMENT ‘This ociment sto be eased cone and abet ot ba opecuend hele on pat by any means wit the prt PE Project No. KZ — 3622-2107 INDAH KIAT KARAWANG = |“Document No. | PERTZMESOOAESOW20002 | PROJECTS 7 Revision No, o ‘SCOPE OF WORK Page Sofa CONVERTING TISSUE lanai October 20, 2022 MACHINE #6 & 7 PHASE 2 1, PROJECT SUMMARY 4.4 Project Description Name of the project Converting Tissue Machine 6 and 7 Phase - 2 Description The works consist of Engineering, Procurement, Construction and Testing & Commissioning of Converting Tissue Machine 6 and 7 Location The mill site Is on Desa Kuta Mekar no.9, Karawang, West Java Province, Indonesia. The location about 60 KM and can be reached within 2 hours by car from Jakarta city. Project number P-KT2M-3522-1902 2. OVERVIEW ‘The works consist of Engineering, Procurement, Construction and Testing & Commissioning of additional 2Sets of new machines and ancillaries. This Includes Extention Main Distribution Board (2 Panel + connecting Bus-bar), Field Distribution Board (FDB) (2set), Compressor Auxiliary Distribution Panel (1set), Cooling Tower Distribution Board (1Set), cable tray/ladder, HV and LV cables, cable pulling, termination, grounding system, dismantling, re-installation of existing cable ladder and steel support, removal of existing panel (1set) , pull back and coil existing cable 1¢ x 400mm2 approx. 1500m and handover to PD warehouse. ‘The design and quantity(s) on this document is to the tatest technology and comply with Indonesian national standard (SNI), IEC to Asia Pulp and Paper company standard, The proposal of bidders will be checked by purchaser and will be used as basis of the contract of contractor. 3. INTERNATIONAL STANDARD AND REFERENCE. The work shall comply with the standard, recommendations, stipulations and safety instructions in force in Indonesia: - Asia Pulp And Paper (Global Project Group and Pindo Deli Standard) - International Electrotechnical Commision IEC - Indonesia National Standard (SNI) a! = PUI 2000 v “Tie coourrent ito be cansldered conden and shall not be reproduced In wel pat by any eens witout the por witian consent (tPiedadol Prejoct Team Projact No. KT2M = 3622-2107 INDAH KIAT KARAWANG =| “pocumentNo} —B PROJECTS APP Revision No, 0 4 sinarmas SCOPE OF WORK Page| Borat ‘CONVERTING TISSUE MACHINE #6 & 7 PHASE 2 Issue Date | October 20, 2022 Document number [Document title P-JKIGPG-100-04-STD-0007 RO [Electrical Design Criteria P-JktGPG-100-04-STD-0012 RO [Specification for Electrical installation P-JktGPG-100-04-STD-0010 RO {Specification for Electrical Bulk Material P-JK{GPG-100-04-STD-0008 RO [Specification for Cables P-JKIGPG-100-04-PRO-1002 RO __|Lighting Installation Detail P-JRIGPG-100-04-STD-1004 RO (Grounding Installation Detail P-JRKGPG-100-16-SPC-0001RO Elect. Equipment Field inspection & Testing Procedure 4, CONSTRUCTION WORKS Hendling, shifting to required site location, installation, testing commissioning of electrical equipment shall be undertaken by Contractor with utmost care. Manufacturer's instructions and requirements given in the technical installation manuals shall be strictly followed. When handling over the cubicles and major components, extra care shall be taken to observe, the correct lifting arrangements shall be hooked safely at slings as the manufacturer's designated lifting points. The lifting position mark indicated on packing box shall be strictly adhered, for keeping it in required vertical position and safe. The Low Voltage (LV) switchgear panels, Motor Control Centers (MCC) shall be handled with care, avoiding any impact to the equipment. dragging of the panels directly on floor shall be avoided. Roller bars may be used for moving of panels. Use of a crane and trailer shall be made for handling of equipment. The switchboard shall be properly supported on the truck or trailer by means of ropes to avoid any chance of tilting. The switchboards shall be lifted after ensuring the panel supports, nuts and bolts are all secured, aligned and tightened. The LV switchgear, panels shall be installed on approved design foundations, floor cutouts. Stee! base channels shall be wolded and bolted on floor slab.. Alternatively when the base channel frame of panels are aligned and level shall be grouted by concrete/cement. It shall be ensured that the base plate level of LV switchgear shall match with the finished floor level. Ae iid “Tis documents obs consiered conta end shel net be reproduced in viol cin part by ery meen witout the por waten coraent ‘of Pindoded Projet Team Project No. KT2M = 3522-2707 INDAH KIAT KARAWANG || -pecument Nor PROJECTS a APP Revision No. a S24 sinarmas ‘SCOPE OF WORK Page Taw CONVERTING TISSUE MACHINE #6 & 7 PHASE 2 Issue Date October 20, 2022 The panels shall be checked for correct vertical position using pendulum weight and water spirit levels. LV Switchgear panels shall be tack welded at suitable intervals at base channel or bolted as per manufacturer's recommendation. In general, all electrical power and control distribution shall. be installed in overhead cable ladder and some areas are use concrete trench. The Contractor shall not bend cable to less than recommended radius. The minimum cable radius shal not less than indicate in the following table below, or as per specified by manufacturer. Continuity of each conductor shall be checked, 600 V and above cables shall be tested with 1000 Volt megger between each conductor and ground. The termination of the cables shall use the cable's shoe and termination block, The gap between cable shoe and cable insulation shall be isolated included the pressed part of cable shoe. The isolation shall not reduce the surface contact area between cable shoes and terminal block. All wire and cable shall be continuous without splices from origin to termination. No wire or cable shall be installed which has damaged insulation or jacket. The Contractor shall not cut strands from conductors to fit lugs or terminals. SERA 5 tines OD semana Ri Roe “ Bee 8 Each cabtershail bo ,etanibacdae aramena mene Each run of cable ladder shall be complete before the installation of cable, Cables shall not extend above the top level of the side rails.Cables shall be continuous in length, without splices, from source to utilization equipment if at all possible. If splices are unavoidable the ladder shall be deep enough to v “hls document tobe considered conftantl anc shal not be reprociced in whol orin party any meen wthcu te lor wren convert Re (Fidel Proje! Team Project No. KT2M ~ 3622-2101 INDAH KIAT KARAWANG | Dacumént No, | EERTEMEDOOSSOWIO002 —| PROJECTS APP Revision No, 0 [<4 sinannas SCOPE OF WORK Page Sorat CONVERTING TISSUE MACHINE #6 &7PHASE2| = 'ss2 Dele =e Cables shall be laid or pulled into ladder runs. Cable rollers, pulleys, and sheaves shall be used for pulling, utilizing the maximum pulling tensions and sidewall pressures as for conduit runs. Sharp points such as bent or burred metal, tools dropped into the ladder, and reversed bolts (heads on outside rather than inside) will cause extensive damage on pulls and may lead to failures of installed cables. Such points shall be removed or corrected before any cable is placed ina ladder. Cable ladders shall be bolted/clamped to supports. Site fabrication and cuting of section shal be kept to a minimum, all sharp edges shall be smocthed off, so that no projections to damage the cable, After cable ladder system is assemblied and the cables ara installed,all kinks, cuts, and others damage to ‘the gaivanized coating. 5, REQUEST BIDDERS TO PROVIDE 6.1 Project Experiences Bidder is requested to submit list of completed projects references that include supply and installation and capabilities to make and review design. The contractor experience includes industrial, process and commercial projects. 5.2 Company Registered Capital The bidder company must be registered and listed in Indonesia government and financially able to do the works in this tender. The bidder shall submit the information of registered capital, current capital and turn over (benefit) projects in recent 5 years. 5.3 Company Certificate The bidder shall submit the company certificate such as Environmental management, safety, construction works, design works and others which will ‘support this tender work. 5.4 Manpower Quantity and Grade ‘The bidder is requested to submit the man power quantity and the grade they have include the certificate level of design and construction. The project team set-up and organization chart include the key person's CV is requested in the bidder technical proposal. 5.5 Project Schedule The bidder shall submit the fastest plan schedule for design; procurement of equipmentmaterial and construction of the project. The actual starting work will oe Ts acumen ob aod cnt ar at abe arte nv er party any meas vit te pr tan cae Pi adel Project Tet MACHINE #6 & 7 PHASE 2 Project No. KT2M = 3522-2107 INDAH KIAT KARAWANG aesamenrno PROJECTS eas Revision No. SCOPE OF WORK Page CONVERTING TIBBUE Issue Date October 20, 2022 be determined and adjusted based on actual site condition and project progress. 5.6 Technical Proposal The technical proposal shall be submitted to Indah Kiat Karawang, PT. Pindo Deli Pulp and Paper Mill - 2, Desa Kutamekar, Kerawang Timur, Karawang by hard copy (3 sets) and soft copy by email. The purchaser will arrange the technical clarification and sign off the document. The necessary document mentioned in this tender and other things to support the review and evaluation of bidder proposal include proposed design, bill of quantity and specification shall be submitted in the tender proposal. Contact persons: Mr. Wei Yen Chun, emi hun_Wei_@app.co.id Mr, Bayani Monzon, email: Bayani_M_Monzon@app.co.id 6.7 Commercial Proposal The commercial proposal shall be submitted to TBA Ms, Anastasia &.8 Guarantee of Lifetime and Performance The contractor supplied materials such as lamps, distribution panels, and cables etc. is approved and must be good quality including good workmanship. The contractor shall offer and provide list of guarantees of material's lifetime and construction performance in the technical proposal. The poor quality installation of equipment and materials quality issues within the guarantee period must be replaced or repaired by contractor no additional cost for purchaser and the solution plan shall be approved by purchaser. ‘The guarantee list offered by contractors will be evaluated by purchaser. 6. PROJECT MANAGEMENT The Contractor shall set up a qualified project team and assign a qualified project manager for this work. The project manager must be supported by enough quantity and quality team member to do the office and site work. The project team will communicate and coordinate all the works with the purchaser and cooperate with other party if needed, The project manager and organization chart shall be approved by purchaser. 6.1 Project Control ‘The contractor will closely monitor and strictly control the project and follow the milestone _ schedule. schedule must be ihtly controlled. ‘This dccurants tobe coneiderd conden, and cha note ropeduced awl on port by any means wie the pr writen consent fPrdocel rojct Team [ Project No. RT2M = 3622-2107 INDAH KIAT KARAWANG -pomamearNo- PROJECTS '\ APP Revision No, 0 ©, <4) sinarmas SCOPE OF WORK Page Worst CONVERTING TISSUE MACHINE #6 &7PHASE2| — ‘Sue Dale ssh eal 6.2 Report and Review The contractor shall submit monthly and weekly report of the works progress. The daily meeting may needed on site according to progress on site. The report will be review by purchaser team, and necessary meeting will be held to discuss and solve immediately if any problems, 6.3 Documentation Contractor shail provide documentation in editable version, PDF in CD and hard copy 4 sets as follow: Preliminary and construction design include materials specification and quantity (Panel outline and wiring diagram of distribution panels, connection to equipment and tag number) As built drawings QA/QC reports Final completion report 6.4 Manpower Contractor shall provide all direct man power including unskilled labour, skilled labour, and surveyor up to foreman needed to perform and complete the works as per plan. ‘The manpower mobilized by contractor shall have sufficient skill in accordance with his specification or job description. If in the purchaser’s opinion any manpower is deemed unqualified or no skill in accordance with the job description, contractor shall replace him/her with acceptable and capable manpower. Contractor shall provide their manpower with safety gear and working tool during project execution. 7. PROJECT EXECUTION All tools, equipment and any preparation works such as scaffolding needed for project execution shall be prepared by contractor. The construction equipment and work plan must be approved by purchaser before project execution. The operators of crane and excavator shall be qualified person to operate the assigned equipment in accordance with government regulation. Project execution on site shall be planned and approved at least one week before the execution time. The contractor shall coordinate with purchaser team and reconfirm one day earlier before the execution plan start to ensure no disturbance of the work execution, a ‘seme ane! vet tdi parva ettymvmer o earn Project No. KT2M = 3522-2107 INDAH KIAT KARAWANG PROJECTS Document No, [ZI APP Raviion No sinarmas ‘SCOPE OF WORK Page Waa CONVERTING TISSUE MACHINE #6 &7 PHASE? Issue Date: October 20, 2022 Al materials, tools, equipment and extra materials shall be kept properly in designated area not disturb any other party activities. All materials, equipment and extra materials belong to contractor shall be taken out by contractor from the project site after completion of project execution. The contractor shall always coordinate with purchaser for daily plan, progress and any issues and solution during execution. The competed works shall be inspected by purchaser qualified person and contractor's team. The overall test of system shalll be done by contractors and witness by purchaser. The contractor shall invite purchaser with one day earlier notice to join inspection and witness the testing. The following document will be in the attachment of this tender document Preliminary Drawing Layout LV Switchgear, FDP, DP, Tray & Cable route -Bill of Quantities and scope of works based on Preliminary/Sketch/Design 8, SCOPE OF SUPPLY The contractor supply materials, engineering, procurement and installation of the construction power package as mentioned in BOQ. The specification, design and quantities, and location are referred on attachment of this tender document. The contractor responsibilty is to deliver high quality materials for this package. Any defective or inferior materials due quality problems or instaltation issues shall be replaced or repaired by contractor on their own cost. The Contractor has responsibilities to maintain own and dedicated assigned tools, equipment, materials, until the project is completed, Stolen or broken materials, tools or equipment are not in purchaser's responsibility. The contractor responsibility for this package is too handed over the project on agreed time schedule, with quality workmanship, testicommission and approved by purchaser. The contractor shall repair or replace all damage and defective material until the project completion is handed over to purchaser and guarantee period is over. f a ‘This documents tobe considered confides), and shal nol bs rescoduced ln whl of part by any mesne vthout ho pir wrdon conan ‘of Pindodell Prject Teer Project No, KT2M — 3622-2107 INDAH KIAT KARAWANG- Sacament Na, PROJECTS APP Revision No, 4 sinarmas ‘SCOPE OF WORK Page ott CONVERTING TISSUE MACHINES Br PHase2| — '8sv0 Date October 20, 2022 ie Ttem/Deseription ‘SCOPE OF CONTRACTOR'S WORK | Remark Contractor Engineering | Material [installation | supply & Install 1 _| Main Distribution Panel (WDB) + Connecting NO NO ves Bus bar IP55 (400V, aP 4W, 1250A, 40kA) 2set 2 | Field Distribution Panel (FOP), IPSS (400v, 3P | NO No YES | 4w, 1200, 40kA,) 2s0t 3_| Auxiliary Distribution Panel, 1P54 for Cooling NO NO YES Tower Is0t 4 [Auxillary Distribution Panel, 1PS4 for WO no YES Compressor 1set 3 | All equipment and materials nat spectfied on | YES YES ves ves above Item 1-4 are provided by contractor &_| Cables and Termination + Raychem 3.3Kv Kit_| YES Yes YES ves 7_| Grounding, Fire seafant and bill Sealant YES: YES YES. YES @ | Tray /cable ladder Yes Yes ves. YES 9 | Dismantling and Re-installation of Existing YES YES YES YES Works 0” | Removal of existing Panel and cables Yes ves ves ves 9. CONSTRUCTION SCHEDULE The Plan as follow: Started: DD/MM/YYYY Duration: X Months TBA 10. ATTACHEMENT NOR ONS Location of Field Distrisution Board (FDB) Location of Main Distribution Board (MDB) Location of Compressor and Auxiliary Distribution Panel (DB) Location of Cooling Tower and Auxiliary Distribution Panel (DB Location of new cable ladder/tray steel support inside and outside building Location of existing cable ladderitray steel! support to be dismantle and re-install Location of existing Panel and cable to be remove and handover to PD warehouse a! ‘Tis documenta tobe contdered cordon, and shal not be reprocuced ln whole orn pat by any moans without the por wien consent (ot Pindodan Project Team 4 st (>) APP Project No, ‘KT2M — 3522-2101 INDAH KIAT KARAWANG | “pocamentNo- PROJECTS Revision No. ‘SCOPE OF WORK Page Toth CONVERTING TISSUE MACHINE #6 &7PHASE2| — 'Ss¥Date ‘Gotaleer 20, 2028 New Field Distribution Panel (FDP) 2set. Contractor to provide UNP for steel base frame support, anchor bolt as required. New Main Distribution Board 2sets and connecting bus bar ‘This documents to be conldord confide, ord aha not be rearo ‘rPincoae Preset Te caved bel orn psrtby any mans witht the per ren consent am are ‘sinarmas Project No, KTS — 3622-2107 INDAH KIAT KARAWANG = |~Document No.| RTMESOONASOWS000Z | PROJECTS Revision No. o SCOPE OF WORK Page ‘Atal CONVERTING TISSUE MACHINE#6 &7PHASE2| — [SSue Dele — New cable ladder and wall support from MDB sama New Cooling Tower + Auxiliary Panel and Compressor + Auxiliary Panel, Nia ‘This documents toe considered conden en hal not be roproduood in whole ora pet by any means without the poe wren const {fPinaoget Projet Team Project No. KT2M ~ 3622-2101 INDAH KIAT KARAWANG PROJECTS a APP Revision No. 0 <4 sinannas ‘SCOPE OF WORK Page Sof 24 onan ae oe | ssue Dato October 20, 2022 New cable ladder from LV Switchgear to Field Distribution Board Machine 6 and 7 attached at Column D, E at building structure. ‘Tis coeamert's tobe consgeredceeidental and shal not be reproduced n whe ox a perth any means wircur the pre wlan consent ‘oF Pinal Project Team Project No. KT2M = 3522-2101 INDAH KIAT KARAWANG || “SecamantNo: PROJECTS APP Revision No. ° <4 sinarmas SCOPE OF WORK Page 1 oF a1 CONVERTING TISSUE MACHINE #6 & 7 PHASE 2 Issue Date October 20, 2022 Location Field Distribution Board (FDB) #6 and cable ladder support attached at building ‘structure column D. “This documents tobe considered concer end stall not be raproducd in whole crn zany any Means witout the por writ conser ‘tPincoe0l Project Team Project No. KT2M — 3522-2104 INDAH KIAT KARAWANG | SocomentNo.| IRTAMESOOM"ISO WOON PROJECTS ie 7 GB APP jevision No <4 sinarmas SCOPE OF WORK Page T7 of at CONVERTING TISSUE MACHINE #6 & 7 PHASE 2 Issue Date October 20, 2022 Location Field Distribution Board (FDB) #7 and cable ladder support attached at bullding structure column E. “his documenta tebe cosdered content, and shal rot be produced n whol ora party any means wie the por wren consent Of Pinodet Proj Team Project No. KT2M — 3522-2101 INDAH KIAT KARAWANS | Decumant Wo | — ERTaMESEREDESSOWAnGOS PROJECTS Revision No. 0 | SCOPE OF WORK Page 18 of 21 CONVERTING TISSUE MACHINE #6 & 7 PHASE 2 Issue Date October 20, 2022 Existing Compressor Panel with spare mecb (3nos) and to be use for new compressor with capacity of 400Kw. If load is higher than 400Kw it is required to upgrade e "ic neti ed eB ed eee b7 ap eeu ancemaparom oe onan Project No. KT2M — 3522-2107 INDAH KIAT KARAWANG =| “Gacament Na: PROJECTS ‘Revision No. ‘SCOPE OF WORK Page 79 of 21 CONVERTING TISSUE MACHINE #6 &7PHASE2| — '58¥2 Date October 20, 2022 Existing cable ladder and support shall be dismantle and the same materials shall be re-install and to be lowered approax. 6meter. Contractor to provide additional stee! support and fittings. Pipes shall be lowered by Piping Contractor The cleared space shall be use for new overhead crane. Contractor shall remove all these materials and boxes before installing 2set of new machine 6 ud v “This documents tobe consdersd corona, and shall nctbe roprducd in whole orl pat by any meane without he por writen caneent ‘rFindocol Project Team APP <4 sinarmas INDAH KIAT KARAWANG: Project No. KT2M — 3522-2101 Document No.| ~~ ERTZMEROOORSOWE0002 | PROJECTS Revision No. o ‘SCOPE OF WORK Page worn Coren ie Tissue Issue Date October 20, 2022 MACHINE #6 & 7 PHASE 2 Contractor will disconnect cables both end cables (1c x 400mm2) approaximate 1500m, pull back , coiled and return to Pindo Deli warehouse. To remove existing panel (1set) and return to warehouse. Removal works can only started upon works installation is completed, testing/commission and trial running of machine 6 & 7 and auxillaries are in working condition. The cable ladder above panel will the same high for tnachine 6 & 7 at Column D and E al Ww ‘This dccumentis tobe considered condor, and shall rot be rare Inwhsle orn partby eny meene witout the prior wien consent ‘ol Pindoel Project Tear ape sinarmas Project No. ‘KT2M ~ 3622-2101 INDAH KIAT KARAWANG | |-posanoctio- PROJECTS Revision No. 0 SCOPE OF WORK Page 2 of at CONVERTING TISSUE MACHINE #6 &7PHASE2| — ‘Se Date Gerobet-20; 2028 Cable support outside building installation 1. New cable ladder from MDB to new compressor 2. New cable ladder support fram MGC-2 to new cooling tower qe “his cocumenti tobe considered confidential, and ena not be reproduced In whele ort pat by any means wut the per wen consent {tPindedet Praec Toor

You might also like