You are on page 1of 4
GEODETIC ENGINEERS OF THE PHILIPPINES, INC. PRC Accredited National Organization No. 013-1975 REGIONAL DIVISION Vill, Eastern Visayas Sto, Nifo 2xt,(DENR-R08 Comp), Tacloban City Tel. No. 832 5813 email add: geo. reqBQvahoo com YEAR 2019 PROFESSIONAL FEES Fees listed hereunder exclude, Titling, Applications, Documentation, miscellaneous and nntal expenses relative to Survey execution and Plan preparation. These fees are the minimum andard fees and subject {0 additional costs in relation to the distance and topography cf the land surveyed) Ra. susoivision survey: Residential Lots: v NO. OF LOTS costs /LOT TOTAL \ $$$ 15,001.00 30,000.00 30,000.00 plus P 5,500.00 per lt in excess of 2 lots 46,500.00 46,500.00 plus P 4,500.00 per lot in excess of 5 ots 88,000.00 £69,000,00 plus P 3,500.00 per it in excess of 10 lots 104,000.00 /-¥\\ 104,000.00 plus P 2,500.00 per lot in excess of 20 lots 184,000.00 | — \\ 154,000.00 plus P 1,800.00 per lot in excess of 30 lots 208,000.00 \ ) 208,000.00 plus P 1:50.00 per lot in excess of 50 lots 283,000.00 \ 283,000.00 plus P 1,000.00 per lot in excess of 100 lots 383,000.00 383,000.00 plus P 800.00 per lot in excess of 200 lots 483,000.00 463,000.00 plus P 750.00 per lot in excess of 300 jots 613,000.00 1,000= P 613,000.00 plus P 650.00 per lot in excess of 500 lots ‘938,000.00 Ml, Farm Lot (Agricultural): a) With areas ranging from 1,000 - 1,999 sq. m.= F 12,000.00/Lot b) With areas ranging fiom 2,000 - 3.499 sq. m.= P 13,000,00/Lot ‘¢) With areas ranging from 3,500 — 7.499 sq. m= P14,000.00/Lot ) From 7,500 1 hectare = P 15,000.00 @) Above 1 hectare = P 17,000.00 Ill Consolidation / Subdivision: The same rate for subdivision plus F 5,000.00 per lot to be consolidated, IV. Consolidation (without fieldwork): P 12,000.00 for 2 lots plus P 2,500.00 for every succeeding lot (Residential) and P 12,000.00 for 2 lots plus P 3,000.00 for every succeeding lot (Agricultural) for 1* hectare of every lot plus P 600.00 per hectare in ‘excess of 1 hectare of fraction thereof S Vi. Commercial / Industrial and Institutional Lots:Plus 50% of the above rates. o B. ORIGINAL SURVEY: (Costs of Survey Authority is not included): a) Residential: A charge of P 30,000.00 per parcel, b) Agricultural: A charge of P 40,000.00 for the 1" hectare plus P 5,000.00 per hectare OF fraction thereof in excess of 1 hectare up to 12 hectares, c) Fishpord, Foreshore lands / Sand and Gravel and Quarry Concessions. A charge of 25,000.00 per heciare or fraction thereof up to 20 hectares and P2,500,00 every hectare above 20 hectares, 4) Tie Line Connection ~ From standard Reference / Monument, the charge shall be P 10,000.00 / km. Perimeter distance, ie *. SKETCH PLANS: 8) Ordinary Sketch Plan (Reference use) - 2,000.00 for the 1" 4 comers plus. P 200.00 for every corner in excess 'b) Forloanwith Location/ Vicinity Map— 3,000.00 forthe 1""4 corners plus 200.00 per comer in excess of 4 comers, ©) Sketch Plan for approval with Location / Vicinity Map — 10,000.00 for the 1 lot 200,00 for every lot in excess of 1 lot. 4) Lot plan’ Vicinity Map with Satelite Image - P 3,000.00 for the 14 comers plus P 200.00 per comer in excess of 4 comers, \D. RELOCATION SURVEY: 8) Residential ~ 15,000.00 per lot plus P 500,00 per corner in excess of 4 comers, 'b) Commercial / Industrial A charge of P 20,000.00 per lot plus P 1,000.00 per comer in excess of 4 corners ©) Agricultural — A charge of 20,000.00 plus P 5,000.00 per hectare in excess of 1 hectare or fraction thereof. 4) Fishpond, Foreshore Lands / River Areas, Sand and Gravel and Quarry Concessions ~ A charge of P 25,000.00 for the 1* hectare or less plus P 4,500.00 per hectare of {fraction thereof in excess of 1 hectare up to 10 hectares; P 3,500.00 per hectare up to 20 hectares; P 2,500.00 per hectare up to 30 hectares; P 2,000.00 in excess of 30 hectares. CA ONO, Note: If for APPROVAL add 30% of the above costs. 2/4 E. ENGINEERING SURVEYS: —_ 1, Topographic Survey: P 40,000.00 for the 1* hectare or less plus P 10,500.00 per hectare for succeeding hectares up to 10 hectares; plus P 8,000.00 per hectare for Succeeding hectares up to 20 hectares; plus P 5,000.00 per hectare in excess of 20 hectares, a> 2. Structural / Facilities / Utilities Surve P 52,000.00 for the 1* hectare or less plus P 32,500.00 per hectare of succeeding hectares up to 10 hectares; plus P 26,000.00 per hectares for succeeding hectares uf to 20 hectares; plus P 20,000.00 per hectare in excess of 20 hectares, 3. Route Survey: ) Horizontal Control / Centerline Alignment (20 meter stationing): ‘A charge of P 45,000.00 for the 1" kilometre orless plus P 25,000.00 per kilometre for succeeding length up to 20 kiometers; plus P 13,000.00 per kilometer for the ‘succeeding length up to 50 kilometers plus P 10,000.00 per kilometre in excess of 50 kilometers. ») Vertical Control / Profile levelling (20 meter stationing): A.cha'ge of P45,000.00 for the 1*kilometer or ess plus 15,000.00 per kilometer for succeeding length up to 10 kilometers; plus P13,00000 per kilometer for ‘succeeding length up to 80 kilometers; plus 10,000.00 per kilometer in excess of 0 kilometers. ©) Cross-Section (15 meters on each side of the centreline, 20 meter interval): A charge of P 40,000.00 for the 1* kilometer or less plus P 26,000.00 per kilometer for succeeding length up to 10 kilometers: plus 20,000.00 per kilometer for succeeding length up to 50 kilometers, plus P 13,000.00 per kilometer in excess of 50 kilometers. 4) As-Stake Survey (20 meter stationing and layout of PC,PT& Pl): A charge of 30,000.00 for the 1" kilometer or less plus P 20,000.00 per kilometer for succeeding length up to 10 kilemeters: plus PP 15,000.00 per kilometer for succeeding length up to 50 kilometers; plus es 10,000.00 per kilometer in excess of 50 kilometers. tN ng \ 4. Sketch | Location of Structures and Roadside Improvement / Land Use Classification: A charge of P 8,000.00 to P 32,500.09 per kilometer depending on the density of the improvements, 5. Bridge Site / Water Crossing Survey (Area 1.2 hectares): P 52,000.00 for the 1* site plus 40,000.00 per site for succeeding sites up to 5 sites; plus P 32,500.00 per site up ' 0 20 sites; plis P 26,000.00 per site up to 20 sites. For river survey and new alignment ‘Such inside forest, the cost for cleaning shall be added. 6. As-Built Survey: Floor area of 200 Square meters or less an amount of 13,000.00 plus 'P 250,00 / per square meter in excess of 200 sq. m. F. HYDROGRAPHIC SURVEYS: ‘The P 45,500.00 for the 1* hectare of lass plus P 26,000.00 per hectare for succeeding hectares up to 10 hecteres; plus P 20,000.00 per hectare for succeeding hectares up to 20 hectares: plus P 13,000.00 per hectares for succeeding hectares up to $0 hectares; plus P- 10,500.00 per hectares in excess of 50 hectares, NOTE: When cross sections are required to be plotted and drawn in addition to the profiles needed for computations of volumes / estimates to cut / fil a charge of 1,000.00 per cross section shall be added to the fees above. G. MINERAL LAND SURVEYS: ‘A charge of P 130,000.00 per block (81-hectares) up to 5 blocks: plus P 110,000.00 per beck Lup 10 15 block up to 15 blocks; plus P 80,000.00 per block up to 30 blocks; for other mining survey fees, the MGE| approved rates shall apply. \,__H. MEMORIAL PARK SURVEY: \\ Accharge of P 2,000 per fot or 2% seling cost whichever is higher. ‘ |. Forest Lands and Protected AreasiNational Parks:(Not for Registration) ‘A minimum of 15,000.00 for the 1* hectare plus P 1,000.00 for the succeeding hectares. J. OTHER SERVICES: 1. As Court Commissioner, Barangay and other appearances: 8) A charge of P 3,000.00 per appearance, 'b) As an expert witness a minimum charge of P 4,500.00 per appearance. ©) 100% of the herein stated fees, of all kinds of surveys if appointed as court commission AS 2. Consultations: ‘Arminimum amount of P 1,000.00 plus costs of research work if necessary for every appointment plus P 200.00 per hour in excess of 2 hrs. EQUIPMENT RENTAL/ COSTS: Equipment Daily Rates (Php) Total Station w/ Accessories (standard package) | Php 2,500.00 ‘+ Extra prism /range pole with spirit bubble + Extra battery and charger + Tripod | Automatic Level — Digital or Analog Php 1,000.00 Php 6,000.00 GPS Single Frequency Pair GPSIRTK- Dual Frequency Pair [Php 10,000.00 Dron takeoff) with operator —— Php§00000 NOTE: Covers the data aquistiop nly, = i 2 3 LL. MISCELLANEOUS: Additional expenses for all kinds of surveys mentioned above shall be charged to the Survey claimant / Interested Party: 1. Transportation, accommodation and food of the survay party 2. Standard Cylindrical concrete monuments 15x50 cm., at P150.00/monument planted, 3. Research works / documents needed as per requirement in the approval of surveys. 4. Survey Authority APPROVED BY THE BOARD during the 2 Regular Board meeting held on August 10, 2019 at GEPI Office, Bray. 2 (DENR-08 Compound), Sto. Niflo Ext., Tacloban City. Ga fo-t¥ Gerad Francis . ilong GS Wanceslad . Nicolasov, Regional President CRP, GEP- CPP. GEP-8 arent Ma. Dioleta C. Vilas RET Ioay Exec, Secretary (Treasurer (is i —— \__ Venerafdo E Lubiano Sot at-Ams. Diana Christa G.Wilane Board of Director

You might also like