You are on page 1of 1

00 04 03of

WA- 0641437 RB417 P 19WN109 4400016679


NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

OW NER.
FOR NOTES, PLEASE REFER TO SHEET NO. #01.

TS
OF I
I G E C B A

5905 6265 4130 4624 3306

CONSENT
T.O.PARAPET
EL.+14.55

TTEN
THE W RI
T.O.PARAPET
EL.+11.15

1000
2% SLOPE

1800

2050
OD

THOUT
B.O.TT.
EL.+9.35 B.O.TT.
EL.+9.10
SINGLE GIRDER LEGEND

1600

1835
CRANE

WI
T.O.PARAPET
PANEL
FOR LEGEND, PLEASE REFER TO SHEET NO. #01.
EL.+7.75
5t

DOCUMENT
595

518
T.O.CORBEL

2825

GHT)
BEAM.
110 KV GIS

3850

CORBEL
EL.+6.46

HEI
ROOM

11150
B.O.TT.

6590
EL.+4.15

6460

10250
2% SLOPE

NG
FTI
9350
CRANE

9100

9100
LI
D01

(
B.O.TT.

S
THI
EL.+3.90

8350
OD

900MMX900MM OPENING
100 FOR GIB @ 2005MM
100 CONTROL ROOM

900

FROM
50 FROM FFL TO BOO
D3
D4L D4L

4150
50
3900

3700
D05 D05 D05

2300

2300

2205
1000

NED
F.F.L F.F.L F.F.L 1000
EL. EL. EL. F.F.L EL.

SHALL BE OBTAI
+/-0.00 WALKWAY +/-0.00 +/-0.00 WALKWAY +/-0.00

600

600
700
900
1200

1200
1180

1300

1420
1500

1500

1500
YARD L.
EL. -0.60
YARD L. KEY PLAN
EL. -0.60
{300mm PVC SLEEVES 1{50mm PVC SLEEVE FOR
T.O.C.
CABLE FOR GIS CONTROL CABLES CABLE OUTDOOR LIGHTING&SOCKET@-1.2m
T.O.C. EL. -1.20 T.O.C.
(2X2){160mm PVC PIPES FOR SST TRENCH TRENCH FROM BOS TO FFL AND
EL. -1.50 EL. -1.50
T301 & T302 LV CABLES @-1.18m 1{110mm PVC SLEEVE FOR NER-2
& -1.50FROM BOS TO FFL CONTROL CABLES @-1.42m FROM
(3X1){160mm PVC SLEEVES FOR
BOS TO FFL
LV & CONTROL CABLES BETWEEN
AD
RO
GIS & CONTROL ROOM @-0.9 FROM PH
AL
T
COR-2 US
E
AS HO
E=506225.4250
BOS TO FFL(TYP) COR-1
N=2525499.5990
E=506160.0600 GA
TE
CE
#1
SS
AC N
I

AD
MA
TO
AD
RO

N=2525474.5460 RO 00
CA
HV NK
BL
E
00
3{2 UCT
D
CA
HV NK
BA
BL
E

T
BA
3{2 UCT
D

AL
PH
AD
RO
IN
MA

AS
IDE
TS
OU Y SU
MP
MP
PU
E
BL

PART
CA
HV NK C
L
00 BA
3{2 UCT
D
E
BL
CA
HV NK
0 BA
20
3{ UCT 03
D T-6 EA)
T.
AD FU L AR
RO AV
E
TE GR
(
RE
NC -2
CO LM
DE
WI

E
M
00
4.

RENC
E
MP
SU

LN
MP

REFE I
PU

R-3
NE

C
L
L
C

02
T-6

MP
SU
#2
TE PU
MP
GA S TO
S
CE AD
AC RO R-2
IN NE
MA

C
L RSB

A SECTION
E
C

DE
WI
X
M
00
1. Y
LK
WA
E
WA
NC
T-6
01
RE
FE NE
RE LI

R-1
NE

RM
ING
FO
AD
RSB

AT
LO
PL
UN
C
L

S
GI )
kV 00
20
110 00X1
0
(29

-1 -2
LM SPF E
RSB
GL
TOG CH
T
SWI

-- SCALE
R
DE
UN ND
OU NK
GR TA CH
R EN
TE ES TR
WA LITR BL
E
CA
00 OL

1:100
60 TR
ON

CABLE
/C
LV

CA EVES
MP

ES
RA
/C TRENCH

E
NK
BL
DDC

SL
OF
ONTRO

BA
RO
OF

TO

C
PV
CT
RO

G
TO

O/

MM)
DU
V

FO {200
E
8K
BL
LV

MV 3.
CA
1
X
3)
R

8X
(
RSB

N
F
RSB R
EA
HG
TC
I
SW NT
8k
V ME
13. SE
BA 100)
WITH 11
0X
00
26
(

I
OM
RO
L )
RO 00
NT 20
CO 00X1
4
22
(

NT
ME
SE

RM
OM

ING
BA

FO
FR

AD
AT
LO
PL
UN
AS
P3
CA
V
M. )
EA -6
RE AR
FU
TU
AV
EL BSB 5
GR -
(
BSB RSB

AS

PH
RSB
3

DE
D.

Y
LM-

WI
CON

WA
T-2

LK
DE

M
PI WI

00
M

WA
00
1. Y

1.
WA
LK
WIND HER WA
TC

PH
CA
RSB

01
AL

MP
CU-

RA
RSB EA
-01 AR
SPU
T
AL
PH
-2 OO
M AS
BSB 1 .R 0)

AL
MM 00
- CO X3
00
BSB OP
SH 35)
120
(
RK
WO 0X40

T
0
23
(

FULL OR
T
EN

LL
AG OOM
N R
EA

WA
MP
CL NDER 0) SU
LI 1100 MP

RE
CY X DE PU
00 WI

FI
T 32 M
ILE ( 00
1. WA
Y
TO TO WA
LK

T
OF RSB
P2 RO
CA MP
03 SU
F3 R MP
VA PU

RO
7M
DN

OM NT
FR ME RSB
SE D.
BA
CON
ING T-1

CA EVES
AD PI
LO RM
UN

ES
RSB FO
AT

RO

DE
PL

E
NK
BL

Y
WI
RSB

SL

WA
BA

LK
M
C
AD

00
PV
CT
G

WA
O/

1.
MM)
DU
V
DDC

FO {200
E
8K
BL
MV 3.
CA
1
-3

X
3)
BSB

8X
NG

(
I
AD

AD
LO RM
UN FO
AT
PL

-4
BSB
MP
RA

H.H

CA EVES
H.
M. -4

ES
LM

E
NK
BL
SL
BA

8K )PVC
CT
G
O/
DU

MM
V

FO {200
E
BL
MV 3.
CA
1
X
3)
R

8X
(
P1
CA
01 IC
F3 R PT
7M
VA SE
NK
TA

T
AL
PH
AS

COR-3
EL NK
AV BA
GR CT
EA DU
AR BL
E
CA
MV
T
PI
E
AG
EP
SE

M.H 2
R
FO ER C. -0
E
AC HELT PE
SP TY

E=506246.4240
S
M
CO
LE
TE

AD
RO N=2525442.4340
R

T
AL
FO ER
TE HELT
GA S
M
CO
LE
TE

PH
AS
M.H
C.
-01
PE
TY

COR-4
E=506180.6630

N
N=2525418.4440

I ON
REPRODUCTI
REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.

DRAWING CONTROL SHEET WE-0641291

SCOPE OF WORK & TECHNICAL SPECIFICATION PTS-19WN109

NO
1 2 4 5 7 9 10 11 12
3 SUBSTATION GENERAL EQUIPMENT LAYOUT WA-0641419

d SA
-
2580 6968 4202 4895 6675 6665 4000 3475 3350
GALVANIZED CAGED
-

onalGri
STEEL LADDER FROM GIS ROOF
TO STAIR ROOF T.O.PARAPET
EL.+13.65
-

2500
GALVANIZED CAGED STEEL

OF Nati
LADDER FROM BUILDING
ROOF TO GIS ROOF
T.O.PARAPET
EL.+10.40 EL.+11.15
RIDGE
EL.+10.25

N ARE THE SOLE PROPERTY


3400
SAND TRAP LOUVER

T.O.PARAPET T.O.PARAPET
EL.+7.75 EL.+7.75

13650
2500

GRAPHIC SCALE:
3300

B.O.HC. 0 0.5 1 2 3 4 5 6 7 8 9 10m


(T.O.CAN)
EL.+4.68 EL.+5.667

B.O.HC. SCALE : 1 : 100


EL.+4.45
7750

7750
AS-BUILT BY CEPCO COMPANY DATE --
(T.O.CAN)
(3X1){160mm PVC SLEEVES FOR EL.+3.467 0
13.8kV SWITCHGEAR CONTROL ROOM LV & CONTROL CABLES BETWEEN 100
5 (T.O.CAN)
4680

EL.+2.867
4450

NED HEREI
100 50 GIS & CONTROL ROOM @-0.9
(5X2){160mm PVC SLEEVES FOR
4450

D4L D5L
SLAB LV & CONTROL CABLES BETWEEN FROM BOS TO FFL (TYP)
OPENING FOR SWGR & CONTROL ROOM @-0.88 REMOVABLE
D4 D3 D5
SWGR &-1.2m FROM BOS TO FFL(TYP) GALVANIZED
2300

2300
2220
RAISED FLOOR STEEL HANDRAIL
1200
2500 1000 3000
2000 (TYP.) F.F.L
F.F.L UNLOADING UNLOADING
1780 EL.+/-0.00 F.F.L
WALKWAY PLATFORM PLATFORM
EL. +0.00 1560 869 795 1120 1385 1650 1950 570 1680 2250 2735 1119 1195 1205 480 1615 1570 290 EL.+0.00
600

600

00 10.11.22 E.A ISSUED FOR APPROVAL EZZ EZZ M.F

600

ON CONTAI
880

900
1200
1200

1200

1200
N.

N.
2200

YARD L.
REV.
N.

YARD L.
2600

2600
MI

RC RAMP DATE BY DESCRIPTION CHKD. CERT. APPD.


13.8 KV SWGR BASEMENT
MI

1{110mm PVC PIPE FOR EL. -0.60


3000

3000

NO.
MI

EL. -0.60 10% SLOPE


3400

3400

FENCE DOOR INTERLOCKED


CABLES @-1.2m BOS TO FFL 220 T.O.C.
3600

3400

DRAWING COMPLETION CERTIFICATE (DCC):


3000

250MM THK. RC TYP 400 MM OPENING EL. -1.20


T.O.C VARIABLE
RETAINING WALL
FROM

NFORMATI
T.O.C EL.-3.60 0.50% 0.50%
EL.-3.60 TO SLOPE SLOPE

EL. -3.63 250MM THK. RC RETAINING


WALL
(8x3){200mm PVC SLEEVES FOR 0
OUTGOING FEEDERS RIDGE LINE
(8x3) {200mm PVS SLEEVES FOR 16
DRAINAGE COLLECTING OUTGOING FEEDERS @-3.4 & -3.00
4{110mm PVC PIPES
@-3.4 & -3.00 & -2.60m FROM CHANNEL WITH STEEL
3{160mm PVC SLEEVES FOR (EE) , (ODL), CCTV & &2.60m FROM BOS TO FFL
BOS TO FFL GRATING COVER
CAP. BANK 02 @-2.20m FROM

AND THE I
SPARE @-1.2m FROM 320 320
BOS TO FFL B.O.O TO FFL E.ADLY EZZ 1:100
DRAWN BY CHECKED BY SCALE:

ENLARGED VIEW
5946

DATE STARTED DATE COMPLETED


B SECTION
-- SCALE 1:100 OPR'G. DEPT. ENG. DEPT.

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

NG
CONSTRUCTION OR FOR ORDERING

S DRAW I
GROUND WATER LEVEL MATERIAL UNTIL CERTIFIED AND DATED BY DATE
EL.-9.996

WALL OPENING AND FLOOR CUTOUTS DETAILS


SECTIONS

THI
CONSTRUCTION OF RABIGH HOUSING (RBG-H) 110KV/13.8KV S/S
RABIGH SAUDI ARABIA
CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

4400016679 19WN109 P RB417 WA -0641437 03 of04 00


NG-A (2012/01)

DMS VECTOR NGA00

You might also like