You are on page 1of 1
os] ta) = |t5] 5] 2] <5] 0] |] fu = 33 2 2 Zz 2B 2 3 26 7 ra Fy 2 31 2 = ue % 35 6 37 PPM WORK ORDER QUARTERLY ANUALLY a COOLING TOWER. Checklist / stops ton team are aware of the PPM schedule. Ensure al PPE is worn and all safety measures are i ‘Ensure panels and switch off local lation switch forthe unit ut lock out and tag out zs ‘Mechanical ‘Check the cooling tower fan motor foundation Boks. ‘Check the V-belt condition and required _wbrcate the motor and; mech & beai ‘Check the oll level and condition replace if ‘Check the cooling tower motor any vibration. “Check for any abnormal bearing noise ‘Check the fan Blade condition ‘Check andi water Check al valves Ensure that no tools and debris are left inside the cooling tower. ‘Check the condition ofthe cooling tower fan assembly. ‘Gean the sump basin and nozzie, “Inspect the unit casing and accessories for chipping or corrosion, Clean the metal angle and pipes and repaint ‘Gean the cooling tower fils ‘Gean the drain system ofthe cooling tower ‘Gean the sump basin outline strainer. ‘Gean the MCE ai blower ‘Check for any abnormal noise and bursing smell repairs ‘Check and loose power cable connections inside the ‘Check for the motor terminal connections. ‘Check the isolator power cable connection and condition. Remove the locks andi “Switch ON the isolator forthe unit the MCC| ‘Check the Auto / Manual the unit “Check the condition of voltage and current meters. ‘Check the and current (A) are in ‘Check the selector switch ‘Check the of z ‘Check the of ‘Check the. of ‘Check for any alarms in the \ ‘Check and ensure CTs ‘Check the lo olalo pJoJolaJo}a}a/o]olalala 3 8}o]a}o}olalolalalalala| jalololals| pfolo] o B]o}o)oloJofolalafalololalalalalalala

You might also like