Job Safety Analysis
Company Name: 17/5 — [+51 PATELsy no: sna/cco/nse/ 19/01 Date
Powe: $6 00640735 rocakse: Conthy: 3 Lene Siena paobnretecr Bkaef
Scatoding, Shuterng, Wh POH. Br eaeshus at N7pe Care: a
Activity: Reinforcement & Concrete ‘Area / Work Location:
fatty Havarde isk Control Measures
[aac nant poten es saoy PE] Tae ae Pees gad bees ar aS eT
lacs cane [ler Panadol ne nea ‘ya a eta
scafold erection & csmanting Fal of person fram height 1 | Workers to wear fll body harness, anchorage
1 fwor 1 point be above shoulder height.
Fal of materials & tools rom
Ihiont [area tobe barcaded
[Scatfoldfature 3. ]100% tie off during erection/dismanting
4 [competent & dedicated workers tobe engaged
People bow or erection &nmanting fst
| Lowering /ascending materials/tools by the
oor bol bg, no thrown sowed
erste table pepe compactes pound Tar
round supported safle
[iene ec anne —[Proper lec connection Ba made
_ Scaffold parts not to obstruct Walkways.
3 fsatot to be mipeted porto se
by rant & shaterng we
shuttering, Reinforcement & handing, cutting, ending ee, Rebar cutting & bending aces tobe clearly
concrete Works demas
Trained and exponenced workers to Be
tana inivey employed fort
Proper housekeeping Yo be maintained at the
work pace
[al moving parts of machine to guarded
Proper elect supply cable, swith board pug
ton etc tobe used
ot shuttering aed rebar work material Should
be stacked property and should nat abstuct
the walkway
[no nos or protiuding element Yo be elton the
eround
Required Personal Protective Equipment [PPE].
eines, Safety shoes, Nose Mas, ec |
= y
SA checked By
TA Brepated By
ten
loesignation