Date forwarded to Date received from Date received by the
Control No. Description Remarks Consultant Consultant contractor API-MGR-RFI-ST-002 Structural Connection Details, PE-9 28-Sep-22 Waiting for Quadstruct Response
RFI STRUCTURAL
Date forwarded to Date received from Date received by the
Control No. Description Remarks Consultant Consultant contractor IEEI submitted shodprawing for PE-9 Manlift/passenger elevator shopdrawing from basement floor to for Approval API-MGR-RFI-ME-001 mezzanine floor at GL K-L/14-15. Veriication of required height of 26-Sep-22 API submitted RFI to QDST 09-28-22 encasement at P1 (API-MGR-RFI-ST-002)
RFA STRUCTURAL
Date forwarded to Date received from Date received by the
Control No. Description Remarks Consultant Consultant contractor API-MGR-RFA-ST-003 Proposed Structural Connection on Transformer Area 23-Sep-22 Waiting for Quadstruct Approval Proposed Methodology for Chipping of Retaining Wall at Basement API-MGR-RFA-ST-004 28-Sep-22 Waiting for Quadstruct Approval Floor for Main Collector of Sanitary Pipes API-MGR-RFA-ST-005 Bearing Pads with Steel Inserts 29-Sep-22 Waiting for Quadstruct Approval