You are on page 1of 3

1.

DEPLOYMENT STEPS:

1.1 Pre-installation:
NA

1.2 Installation Steps:


1.2.1 Manual

Note:
Please make sure you change the user info(login credentials and company-specific
code)in the correction.csv file before uploading the Correction.zip file in the pipeline and
deploying it.

1.2.2 Installation

1. Transfer the given save list TSR447709 into &SAVEDLISTS& folder through text mode
2. Transfer the given routine into LOCAL.BP folder through text mode and compile the routine
TSR447709.AL.SEL.CLOSE,
TSR447709.BAL.CLOSE
PACS.RAISE.ENTRY
3. Create a PGM.FILE record as shown below and authorise it.
PF,RAD I TSR447709.AL.SEL.CLOSE

Model Bank R18 PROGRAM FILE,RAD SEE

PROGRAM TSR447709.AL.SEL.CLOSE

----------------------------------------------------------

1 TYPE.............. M

2. 1 GB SCREEN.TITLE TSR447709.AL.SEL.CLOSE

5 PRODUCT........... AA

26 CURR.NO........... 1

27. 1 INPUTTER....... 20406_INPUTTER

28. 1 DATE.TIME...... 23 DEC 22 09:36

PF,RAD I TSR447709.BAL.CLOSE

Model Bank R18 PROGRAM FILE,RAD SEE

PROGRAM TSR447709.BAL.CLOSE

----------------------------------------------------------

1 TYPE.............. M

2. 1 GB SCREEN.TITLE TSR447709.BAL.CLOSE

5 PRODUCT........... AA

26 CURR.NO........... 1

27. 1 INPUTTER....... 20406_INPUTTER

28. 1 DATE.TIME...... 23 DEC 22 09:36

4. Take a new classic session and login into lead company H01 application prompt then run the mainline
routine TSR447709.BAL.CLOSE
5. Take a new classic session and login into lead company H01 application prompt then run the mainline
routine PACS.RAISE.ENTRY
6. Take a new classic session and login into lead company H01 application prompt then run the mainline
routine TSR447709.AL.SEL.CLOSE

1.3 Post - installation:

You might also like