HARGA BARANG JUMLAH HARGA

NO URAIAN PEKERJAAN VOL SAT


BAHAN BIAYA BAHAN
1 2 3 4 5 6
1.1 PIPA PVC 20 MM 3000 UJUNG RP,16.000 RP,
1.2 KABEL NYM 3X2,5 M RP,
1.3 KABEL NYM 2X2,5 M RP,
1.4 KABEL NYA 1X2,5 M RP,
1.5 FLEKSIBEL KABEL 20 ROL RP,
MM
1.6 INBOW DOS BH RP,
1.7 T DOS BH RP,
1.8 DORA DOS BH RP,
1.9 LAS DOP(ISOLASI BK RP,
KABEL)
1.10 TREIY KABEL ? ? ? RP,
1.11 LAMPU ? ? ? ? RP,
1.12 STOP KONTAK ? BH RP,
1.13 STOP KONTAK (SEFTY) ? BH RP,
1.14 SKLAR SERI ? BH RP,
1.15 SKLAR TUNGGAL ? BH RP,
1.16 EXSOS 3 BH RP,
1.17 RP,
1.18 RP,
1.19 RP,
1.20 RP,
1.21 RP,
1.22 RP,
1.23 RP,
1.24 RP,
1.25 RP,
RP,
JUMLAH RP,

PENAWARAN PROYEK PEKERJA PEMASANGAN INSTALASI LISTRIK


LANTAI 1

N HARGA
NAMA BARANG VOLUME HARGA
O SATUAN/TITIK
1 TITIK LAMPU 15 Titik RP,125.000 RP,1.875.000
2 STOP KONTAK 7 Titik RP, 125.000 RP,875.000
3 TITIK EXSOS 3 Buah RP, 125.000 RP, 375.000
JUMLAH RP,3.125.000

LANTAI 11

HARGA
NO NAMA BARANG VOLUME HARGA
SATUAN/TITIK
1 TITIK LAMPU 15 TITIK RP, 125.000 RP, 1.875.000
2 STOP KONTAK 15 TITIK RP, 125.000 RP, 1.875.000
3 PANEL 3 PHASE 1 BUAH RP,3.000,000 RP, 3.000.000
4 JUMLAH RP, 6.750.000