3.6
Pa #
Moving To The TEST Position, as follows:
a) Check that the breaker is in the "O" (Open). position. If it is in the
"I" (Closed) position, press the PUSH-TO-OPEN button (5) (Refer to Fig
9) to open the breaker.
b) If fixing blocks (4) (Refer to Fig 1) are fitted, loosen and free the left
and right hand screws.
c) Push the position stopper release lever (2) (Refer to Fig 9) down to
open the shutter of the draw-out handle insertion hole (7).
d) Engage the draw-out handle with the draw-out mechanism shaft (6)and
turn the handle, anti-clockwise to move the breaker body. As the
breaker body is drawn out, the position stopper release lever (2)
automatically returns to the up position. (Leave in this position.)
) Simultaneously, the main circuit is disconnected as the breaker body is
drawn out. The breaker body will be pushed forward slightly by the
spring action of the primary disconnect contacts.
Draw-out Handle
PROCEDURE FOR ISOLATED POSITION
FIGURE 9
1. Indicator 5. PUSH-TO-OPEN Button
2. Position Stopper Release Lever 6.Draw-Out Mechanism Shaft
3. Position Padlock Lever (Hex Socket)
4. Open-Closed Indicator 7. Draw-Out Handle Insertion
Hole