3.6 Pa # Moving To The TEST Position, as follows: a) Check that the breaker is in the "O" (Open). position. If it is in the "I" (Closed) position, press the PUSH-TO-OPEN button (5) (Refer to Fig 9) to open the breaker. b) If fixing blocks (4) (Refer to Fig 1) are fitted, loosen and free the left and right hand screws. c) Push the position stopper release lever (2) (Refer to Fig 9) down to open the shutter of the draw-out handle insertion hole (7). d) Engage the draw-out handle with the draw-out mechanism shaft (6)and turn the handle, anti-clockwise to move the breaker body. As the breaker body is drawn out, the position stopper release lever (2) automatically returns to the up position. (Leave in this position.) ) Simultaneously, the main circuit is disconnected as the breaker body is drawn out. The breaker body will be pushed forward slightly by the spring action of the primary disconnect contacts. Draw-out Handle PROCEDURE FOR ISOLATED POSITION FIGURE 9 1. Indicator 5. PUSH-TO-OPEN Button 2. Position Stopper Release Lever 6.Draw-Out Mechanism Shaft 3. Position Padlock Lever (Hex Socket) 4. Open-Closed Indicator 7. Draw-Out Handle Insertion Hole

You might also like