Republic of the Philippines
OFFICE OF THE PRESIDENT
PHILIPPINE RECLAMATION AUTHORITY
7* fee, Legaspi Towers 200 Bid. 107 Passo de Roxas St, Legaspi Vilage, 1226 Cty of Makat
TelNo.:(02) 8456-6000. Facsimile No: (02) 8815-2582
Website: wa pea vp . Emalinfodnea govphn
20 October 2022
MR. JULIETO G. VALMORIA
PRA FOI Tracking No.: #PRA-818761524919
.valmoria@mitsyi.com
Dear Mr. Valmoria:
In compliance with your request posted on our EFO! Portal dated 03 October 2022, please find
the attached list (Annex A) of approved, existing/on-going and planned reclamation projects in
the Visayas and Mindanao areas indicating the details such as the name of the reclamation
Projects, proponents, locations, size, land use, project status and project timeline,
In order to serve you better, we would like to get your feedback of our FO! service with a brief
FOI Feedback Survey form which is attached to this letter. You may send it back through our
official email address at info@pea.gov.ph or scan the QR Code to start right away.
For information and reference, Thank you.
Very truly yours,
PINTININE RECL aM sTiOs.
vw i nA
1S.t0.08LIST OF REGULAR RECLAMATION PROJECTS in Visayas and Mindanao
Approved Projects:
T Private JV Pariner | Stze | Proposed Project mae
pecan Prone lon _| Region | Proponent ‘or Developer. (has) Land Use Timeline Lasioeis
7. | oan aut Park Minjonto | 7 | Munkipany | Mor Delooment | 499 zed use years Ws Fal TP
Mandaue City Nonh Reclamation ‘GisbaCly Nandaus Com Wit NT and NTCARW
[a [Manaus Sm Wo wanda | 7 cy | oy 1 wed use year ies rs
| JMiactan North Reclamation ae 1
Seg Valley Engineering and eer
2, | Beamer Pec icin xb | Laplars | 7 om | Sasmentnmeregses | on Mined use The Detoted Engineering
Samar Province
+ ee Cattalogan | 8 | Province NA “ Mixed use yeas With ONT
5. | Maasin Reclamation Projet wasn | 8 iy NA 20 ined use shetyat | Detaled Engineering
| 6. | tabe Rectamation Projet woot | 8 | Muricpatty NA 13 moeduse | MOLL, | poprove rr MOA Sig
Projects Under Process:
; Private JV Parner | Si Proposed Project ma
Reolemation Prefect! oe of Developer (has) Land Use. Timeline ome
7. | Caticlan Airport Expansion CAAP Dery Are Holds | sottes | _Notvet submited and Application Stage
| Logan Reclamation anki NA veo | Notyetevbmitoa | _Netyet opicaton Sage
} mtd
|». [eordova-sm Rectanaton wurkipany | sMPrmeHategs.inc | 1200 | Notyetearitea | Nott, opiate Sage
| 1. mantawi Harbour Esplanade | Mandaue cy | 7 ay 20s | Notyetsutmeea | Notyet Appleaton tage
Consclacin, La ConslaconSeatont Notyet
11, | Consolaion Reclamation = 7 | muricpaity | ggCerecteconSeafort | “zas | Notyetsubmites | NOUS, Depiction Stage
[ 2. [Hem GebttlonatinatContiner”[ Coreascn, | bor NA 25 | _wotyetsupminea | _,NOtyet, Applicaton Stage
Capitan Wactan Bluewaters Notyet
| 19. | LapusLapu 203-Hectares ity 7 city Development Gongortum 203 ‘Not yet submited subriied ‘Application Stage
| 14 | mandaue Rectamaton Maraoue cry | 7 ty it Properties in 95 | notyetsunmisea | Notyet Appleaton Stage
15. [esbuProvince Reclamation [Cordove,Cebu| 7 | Province | Condoa Shore Devt Cor. | 254 | Notyetevbmites | NOUS, pppkcation Stage
one Seashore Protection and Notyet
16, | Bowie Sooshes Serie, tave | | Mnipaty NA 30 | Notyetsvemites | NSLS, Applicaton Stage
17, | We Lim Reclamation Dewocty | 11 | Piva | WMaianoMeAmadS. Lim "2 745 | wotyetsuomned | NOt, popkcatn Sage
18, | bavao city Reclamation Daveocty | 11 cy NA sraora | wotyetsutmitea | Nett, Applcaton Stage
48, | aap Bay Reclamation Bal Sue | ay | iy NA 100107] Notyetecbmitea | NOS ‘popkcaton Sage
Page tofOther Applications:
Privaie JV Pariner ‘Size
eclamatio ation | Region | Proponent omar
Reclamation Project, Location | Region | Propar eee = Remarks
20, | GBS Reclamation Project woiociy | 6 | Private | CBS Development Corporation | 501 ‘Applcaton Stage
21, | Maric Reclamation Project wwe | 6 cy mare ee [0 ovation Stage
22,|Polambato Port Expansion Prolet | ogo. Cobu | 7 iy ‘Appcaton Stage
‘Shipbuilding and Drydecking oecea i = =
23. | Component Project | ewcarciy | 7 Private Application Stage
ial Zone with Private Port | hoyawan,
24 pawn [7 | Pate Application Stage
25.| Globel Group Reclamation Project | Cebucty | 7 | Prvaie Application Stage
Cor oH 7 ‘Sugbu Prime
20, | Seger Cordove, cebu| 7 | Municipality aa 105 Notyet submited — | Application Stage
‘Naga Coastal Development Naga Civ, :
2z, | Nege Comsat Devel 22 7 cy NA 130, | Notyet submited Applicaton Stage
‘atoel Ramos Naval Base Tapu-taps
an | Patel es Si 7 Py NA 130 | Notyetsubmited | Applicaton Stage
20, | San Fernando Reclamation Project | ®°Fe72"4°| 7 | Municipality NA spe Not yet submited Application Stage
20 | Azza Reclamation Projet Taany [7 | mann | ABA apr Deiooment | a5 | notyetsbrited Appleton Sige
31.| Toledo city Reclamation Project | TREC. | 7 iy NA 1176 | Notyeteubmited Applicaton Stage
sz | Payee Coaetl Bypace Road Davee ty | tt ty NA 150 | _Notyetsubmitea Applicaton Stone
33.| caynman Reclamation | daveociy | 11 | Private Capnman cerorton’ — | 12 | Notyetsubmited Applicaton Stage
a4 | aul OF Feet Reclamation” | pwancy | 11 | Prate Inula 1 Corporation 3 | __notyetsuritea Apptcaton Stage
Page 2012NAME:
EMAIL:
DATE OF REQUEST:
REQUESTED INFORMATIOI
MobE oF REQUEST _|e-Fo! PoRTAL [_]sTANDARD PAPER | _|THRU INFO PEA EMAIL
Did you receive
your information
within 15 to 35
working days?
‘Are you satisfied
with the handling of
your FOl request?
Did you feel that we
are to communicate
with you
efffectively from
start to finish?
For successful
request, was the
response you
received easy to
understand?
For unsuccessful
request, are you
satisfied with the
reason provided?
IF DISSATISFIED, PLEASE TELL US BRIEFLY WHY:
IS THERE ANYTHING WE COULD DO TO IMPROVE OUR SERVICE IN THE FUTURE:
Scan this QR Code,
i you wish to fl up
through our online
form.