CONSULTANCY / TRANSACTION ADVISROY SERVICES
FOR DEVELOPMENT OF MALIR EXPRESSWAY
(From Motorway, M9 to KPT interchange)
FINAL REPORT
At the start point an interchange is being proposed fo provide direct access to Malir
Expressway to facilitate movement of vehicles without any conflict with traffic of
Korangi Road and Creek Avenue. From Start point to left bank of river, there will be a
bridge having about 1.5 km length. In this 1.5 km elevated portion, the alignment will
also overpass the existing Jam Sadig Bridge. From this point on, the alignment
remains on the lef" side of the river.
‘At a short distance from the start point, a four-lane dual carriageway, Creek Avenue
joins the Main Korangi Road and links it fo DHA via Khayaban-e-Httehad and further
ahead to Clifton Via Sea-view Road and thereafter to the SAPT / Shirin Jinnah
Colony, Keamari via Marine Prominade.
2.3 interchanges En-route
‘As per conceptual design of the proposed Malir Expressway, 5 Nos. interchanges
have been proposed at the following locations:
1. Jam Sadiq Interchange
2. EBM Causeway Interchange
Korangi- Shah Faisal Colony Interchange
4, Quaidabad Interchange on National Highway, N-5
o
. Interchange near Km 24+050 (Exact Location to be decided)
. Interchange near Km 28+750 (Exact Location to be decided)
10