CROSS SECTION

PAKET : PRESERVASI JALAN SERDANG - BOJONEGARA - Kontraktor : PT PUNDI VIWI PERDANA


MERAK MYC Konsultan : PT PURNAJASA BIMAPRATAMA (KSO)
PT WESITAN KONSULTASI PEMBANGUNAN
PERHITUNGAN EFEKTIF 1 (1+206-1+906)
PT ASTAKONA DUTASARANA DIMENSI
Jarak Pengukuran
No. Bacaan Tinggi Alat Elevation Keterangan
Kiri Kanan
Belakang Depan

1.175 101.011 99.836 BM 01

1 0 1.192 99.819 01+206


2 3.50 1.234 99.777
3 3.60 1.240 99.771
4 5.00 1.301 99.710
5 6.50 1.302 99.709

1 3.50 1.221 99.790


2 3.60 1.210 99.801
3 5.00 1.296 99.715
4 6.50 1.317 99.694

1 0 1.294 99.717 01+225


2 3.50 1.316 99.695
3 3.60 1.339 99.672
4 5.00 1.388 99.623
5 6.50 1.164 99.847

A 3.50 1.300 99.711


B 3.60 1.286 99.725
C 5.00 1.332 99.679
D 6.50 1.360 99.651

1 0 1.325 99.686 01+250


2 3.50 1.352 99.659
3 3.60 1.392 99.619
4 5.00 1.410 99.601
5 6.50 1.243 99.768

A 3.50 1.461 99.550


B 3.60 1.456 99.555
C 5.00 1.439 99.572
D 6.50 1.394 99.617

1 0 1.439 99.572 01+275


2 3.50 1.440 99.571
3 3.60 1.500 99.511
4 5.00 1.522 99.489
5 6.50 1.276 99.735

A 3.50 1.609 99.402


B 3.60 1.570 99.441
C 5.00 1.570 99.441
D 6.50 1.663 99.348

1 0 1.498 99.513 01+300


2 3.50 1.539 99.472
3 3.60 1.530 99.481
4 5.00 1.542 99.469
5 6.50 1.230 99.781

A 3.50 1.662 99.349


B 3.60 1.688 99.323
Jarak Pengukuran
No. Bacaan Tinggi Alat Elevation Keterangan
Kiri Kanan
Belakang Depan

C 5.00 1.760 99.251


D 6.50 1.760 99.251

0.914 1.248 100.677 99.763 TP.01

1 0 1.266 99.411 01+325


2 3.50 1.279 99.398
3 3.60 1.300 99.377
4 5.00 1.275 99.402
5 6.50 1.117 99.560

A 3.50 1.376 99.301


B 3.60 1.412 99.265
C 5.00 1.496 99.181
D 6.50 1.505 99.172

1 0 1.448 99.229 01+350


2 3.50 1.479 99.198
3 3.60 1.468 99.209
4 5.00 1.421 99.256
5 6.50 1.588 99.089

A 3.50 1.452 99.225


B 3.60 1.416 99.261
C 5.00 1.455 99.222
D 6.50 1.605 99.072

1 0 1.529 99.148 01+375


2 3.50 1.602 99.075
3 3.60 1.613 99.064
4 5.00 1.645 99.032
5 6.50 1.644 99.033

A 3.50 1.588 99.089


B 3.60 1.563 99.114
C 5.00 1.530 99.147
D 6.50 1.530 99.147

1 0 1.640 99.037 01+400


2 3.50 1.720 98.957
3 3.60 1.672 99.005
4 5.00 1.516 99.161
5 6.50 1.518 99.159

A 3.50 1.680 98.997


B 3.60 1.650 99.027
C 5.00 1.560 99.117
D 6.50 1.560 99.117

1 0 1.818 98.859 01+425


2 3.50 1.850 98.827
3 3.60 1.870 98.807
4 5.00 1.900 98.777
5 6.50 1.722 98.955

A 3.50 1.888 98.789


B 3.60 1.900 98.777
C 5.00 1.765 98.912
D 6.50 1.766 98.911
Jarak Pengukuran
No. Bacaan Tinggi Alat Elevation Keterangan
Kiri Kanan
Belakang Depan

1.252 1.855 100.074 98.822 TP.02

1 0 1.259 98.815 01+450


2 3.50 1.308 98.766
3 3.60 1.320 98.754
4 5.00 1.250 98.824
5 6.50 1.193 98.881

A 3.50 1.308 98.766


B 3.60 1.278 98.796
C 5.00 1.280 98.794
D 6.50 1.282 98.792

1 0 1.298 98.776 01+475


2 3.50 1.375 98.699
3 3.60 1.382 98.692
4 5.00 1.389 98.685
5 6.50 1.390 98.684

A 3.50 1.322 98.752


B 3.60 1.350 98.724
C 5.00 1.335 98.739
D 6.50 1.310 98.764

1 0 1.352 98.722 01+500


2 3.50 1.405 98.669
3 3.60 1.329 98.745
4 5.00 1.389 98.685
5 6.50 1.392 98.682

A 3.50 1.428 98.646


B 3.60 1.428 98.646
C 5.00 1.410 98.664
D 6.50 1.412 98.662

1.266 1.350 99.990 98.724 TP.03

1 0 1.281 98.709 01+525


2 3.50 1.372 98.618
3 3.60 1.378 98.612
4 5.00 1.411 98.579
5 6.50 1.413 98.577

A 3.50 1.317 98.673


B 3.60 1.260 98.730
C 5.00 1.289 98.701
D 6.50 1.292 98.698

1 0 1.315 98.675 01+550


2 3.50 1.420 98.570
3 3.60 1.510 98.480
4 5.00 1.515 98.475
5 6.50 1.592 98.398
Jarak Pengukuran
No. Bacaan Tinggi Alat Elevation Keterangan
Kiri Kanan
Belakang Depan

A 3.50 1.352 98.638


B 3.60 1.345 98.645
C 5.00 1.310 98.680
D 6.50 1.315 98.675

1 0 1.510 98.480 01+575


2 3.50 1.610 98.380
3 3.60 1.612 98.378
4 5.00 1.569 98.421
5 6.50 1.555 98.435

A 3.50 1.530 98.460


B 3.60 1.488 98.502
C 5.00 1.449 98.541
D 6.50 1.452 98.538

1 0 1.572 98.418 01+600


2 3.50 1.660 98.330
3 3.60 1.740 98.250
4 6.80 1.700 98.290
5 7.00 1.700 98.290

A 3.50 1.595 98.395


B 3.60 1.550 98.440
C 6.10 1.552 98.438
D 9.60 1.464 98.526

1 0 1.645 98.345 01+625


2 3.50 1.765 98.225
3 3.60 1.760 98.230
4 6.80 1.739 98.251
5 7.00 1.755 98.235

A 3.50 1.625 98.365


B 3.60 1.592 98.398
C 6.60 1.509 98.481
D 6.80 1.580 98.410

1.300 1.690 99.600 98.300 TP.04

1 0 1.380 98.22 01+650


2 3.50 1.432 98.168
3 3.60 1.370 98.23
4 6.80 1.380 98.22
5 7.00 1.300 98.3

A 3.50 1.300 98.3


B 3.60 1.235 98.365
C 6.60 1.225 98.375
D 6.80 1.225 98.375

1 0 1.267 98.333 01+675


2 3.50 1.378 98.222
3 3.60 1.359 98.241
4 6.80 1.370 98.23
Jarak Pengukuran
No. Bacaan Tinggi Alat Elevation Keterangan
Kiri Kanan
Belakang Depan

5 7.00 1.393 98.207

A 3.50 1.254 98.346


B 3.60 1.211 98.389
C 6.60 1.300 98.3
D 6.80 1.311 98.289

1 0 1.292 98.308 01+700


2 3.50 1.298 98.302
3 3.60 1.292 98.308
4 6.80 1.280 98.320

A 3.50 1.349 98.251


B 3.60 1.340 98.260
C 6.60 1.385 98.215
D 6.80 1.422 98.178

1 0 1.299 98.301 01+725


2 3.50 1.318 98.282
3 3.60 1.315 98.285
4 6.80 1.405 98.195
5 7.00 1.430 98.170

A 3.50 1.304 98.296


B 3.60 1.275 98.325
C 6.60 1.270 98.330
D 6.80 1.149 98.451

1 0 1.358 98.242 01+750


2 3.50 1.420 98.180
3 3.60 1.421 98.179
4 6.80 1.369 98.231
5 7.00 1.265 98.335

A 3.50 1.401 98.199


B 3.60 1.402 98.198
C 6.60 1.372 98.228
D 6.80 1.370 98.230

1 0 1.501 98.099 01+775


2 3.50 1.528 98.072
3 3.60 1.510 98.090
4 6.80 1.549 98.051
5 7.00 1.549 98.051

A 3.50 1.548 98.052


B 3.60 1.548 98.052
C 6.60 1.530 98.070
D 6.80 1.335 98.265

1.479 1.532 99.547 98.068 TP.05

1 0 1.452 98.095 01+800


2 3.50 1.452 98.095
3 3.60 1.440 98.107
4 6.80 1.421 98.126
5 7.00 1.395 98.152

A 3.50 1.459 98.088


Jarak Pengukuran
No. Bacaan Tinggi Alat Elevation Keterangan
Kiri Kanan
Belakang Depan

B 3.60 1.458 98.089


C 6.60 1.456 98.091
D 6.80 1.389 98.158

1 0 1.418 98.129 01+825


2 3.50 1.394 98.153
3 3.60 1.402 98.145
4 6.80 1.400 98.147
5 7.00 1.399 98.148

A 3.50 1.438 98.109


B 3.60 1.437 98.110
C 6.60 1.449 98.098
D 6.80 1.580 97.967

1 0 1.396 98.151 01+850


2 3.50 1.324 98.223
3 3.60 1.226 98.321
4 6.80 1.334 98.213
5 7.00 1.289 98.258

A 3.50 1.449 98.098


B 3.60 1.448 98.099
C 6.60 1.512 98.035
D 6.80 1.569 97.978

1 0 1.062 98.485 01+875


2 3.50 0.940 98.607
3 3.60 0.969 98.578
4 6.80 0.945 98.602
5 7.00 1.045 98.502

A 3.50 1.059 98.488


B 3.60 1.058 98.489
C 6.60 1.019 98.528
D 6.80 1.005 98.542

1.736 0.200 101.083 99.347 TP.06

1 0 1.081 100.002 01+900


2 3.50 1.063 100.020
3 3.60 1.112 99.971
4 6.80 1.155 99.928
5 7.00 1.168 99.915

A 3.50 1.213 99.870


B 3.60 1.340 99.743
C 6.60 1.580 99.503
D 6.80 1.575 99.508

1 0 0.626 100.457 01+906


2 3.50 0.682 100.401
3 3.60 0.735 100.348
4 6.80 0.756 100.327
5 7.00 0.786 100.297

A 3.50 0.699 100.384


B 3.60 0.783 100.300
C 6.60 0.883 100.200
D 6.80 1.066 100.017
Jarak Pengukuran
No. Bacaan Tinggi Alat Elevation Keterangan
Kiri Kanan
Belakang Depan
CROSS SECTION
PAKET : PRESERVASI JALAN SERDANG - BOJONEGARA - Kontraktor : PT PUNDI VIWI PERDANA
MERAK MYC Konsultan : PT PURNAJASA BIMAPRATAMA (KSO)
PT WESITAN KONSULTASI PEMBANGUNAN
PERHITUNGAN EFEKTIF 1 (1+206-1+906)
PT ASTAKONA DUTASARANA DIMENSI
Jarak Pengukuran
No. Bacaan Tinggi Alat Elevation Keterangan
Kiri Kanan
Belakang Depan

1.175 101.011 99.836 BM 01

2 3.50 1.234 99.777 01+206


3 3.60 1.384 99.627
4 5.00 1.374 99.637

A 3.50 1.221 99.790


B 3.60 1.371 99.640
C 5.00 1.361 99.650

2 3.50 1.316 99.695 01+225


3 3.60 1.456 99.555
4 5.00 1.476 99.535

A 3.50 1.300 99.711


B 3.60 1.460 99.551
C 5.00 1.450 99.561

2 3.50 1.352 99.659 01+250


3 3.60 1.492 99.519
4 5.00 1.522 99.489

A 3.50 1.461 99.550


B 3.60 1.616 99.395
C 5.00 1.621 99.390

2 3.50 1.440 99.571 01+275


3 3.60 1.605 99.406
4 5.00 1.585 99.426

A 3.50 1.609 99.402


B 3.60 1.779 99.232
C 5.00 1.754 99.257

2 3.50 1.539 99.472 01+300


3 3.60 1.689 99.322
4 5.00 1.709 99.302

A 3.50 1.662 99.349


B 3.60 1.827 99.184
C 5.00 1.791 99.220

0.914 1.248 100.677 99.763 TP.01

2 3.50 1.279 99.398 01+325


3 3.60 1.429 99.248
4 5.00 1.419 99.258

A 3.50 1.376 99.301


B 3.60 1.541 99.136
C 5.00 1.561 99.116
Jarak Pengukuran
No. Bacaan Tinggi Alat Elevation Keterangan
Kiri Kanan
Belakang Depan

2 3.50 1.479 99.198 01+350


3 3.60 1.649 99.028
4 5.00 1.634 99.043

A 3.50 1.452 99.225


B 3.60 1.617 99.060
C 5.00 1.602 99.075

2 3.50 1.602 99.075 01+375


3 3.60 1.742 98.935
4 5.00 1.747 98.930

A 3.50 1.588 99.089


B 3.60 1.723 98.954
C 5.00 1.743 98.934

2 3.50 1.720 98.957 01+400


3 3.60 1.890 98.787
4 5.00 1.885 98.792

A 3.50 1.680 98.997


B 3.60 1.840 98.837
C 5.00 1.820 98.857

2 3.50 1.850 98.827 01+425


3 3.60 2.020 98.657
4 5.00 2.000 98.677

A 3.50 1.888 98.789


B 3.60 2.048 98.629
C 5.00 2.043 98.634

1.252 1.855 100.074 98.822 TP.02

2 3.50 1.308 98.766 01+450


3 3.60 1.443 98.631
4 5.00 1.468 98.606

A 3.50 1.308 98.766


B 3.60 1.443 98.631
C 5.00 1.468 98.606

2 3.50 1.375 98.699 01+475


3 3.60 1.530 98.544
4 5.00 1.545 98.529

A 3.50 1.322 98.752


B 3.60 1.487 98.587
C 5.00 1.477 98.597

2 3.50 1.405 98.669 01+500


3 3.60 1.565 98.509
4 5.00 1.580 98.494

A 3.50 1.428 98.646


B 3.60 1.593 98.481
C 5.00 1.583 98.491
Jarak Pengukuran
No. Bacaan Tinggi Alat Elevation Keterangan
Kiri Kanan
Belakang Depan

1.266 1.350 99.990 98.724 TP.03

2 3.50 1.372 98.618 01+525


3 3.60 1.532 98.458
4 5.00 1.512 98.478

A 3.50 1.317 98.673


B 3.60 1.467 98.523
C 5.00 1.487 98.503

2 3.50 1.420 98.570 01+550


3 3.60 1.590 98.400
4 5.00 1.580 98.410

A 3.50 1.352 98.638


B 3.60 1.497 98.493
C 5.00 1.507 98.483

2 3.50 1.610 98.380 01+575


3 3.60 1.765 98.225
4 5.00 1.770 98.220

A 3.50 1.530 98.460


B 3.60 1.690 98.300
C 5.00 1.670 98.320

2 3.50 1.660 98.330 01+600


3 3.60 1.820 98.170
4 5.00 1.795 98.195

A 3.50 1.595 98.395


B 3.60 1.740 98.250
C 5.00 1.760 98.230

2 3.50 1.765 98.225 01+625


3 3.60 1.930 98.060
4 5.00 1.905 98.085

A 3.50 1.625 98.365


B 3.60 1.795 98.195
C 5.00 1.785 98.205

1.300 1.690 99.600 98.300 TP.04

2 3.50 1.432 98.168 01+650


3 3.60 1.607 97.993
4 5.00 1.594 98.006

A 3.50 1.300 98.3


B 3.60 1.454 98.146
C 5.00 1.448 98.152

2 3.50 1.378 98.222 01+675


3 3.60 1.527 98.073
4 5.00 1.536 98.064
Jarak Pengukuran
No. Bacaan Tinggi Alat Elevation Keterangan
Kiri Kanan
Belakang Depan

A 3.50 1.254 98.346


B 3.60 1.417 98.183
C 5.00 1.410 98.19

2 3.50 1.298 98.302 01+700


3 3.60 1.462 98.138
4 5.00 1.447 98.153

A 3.50 1.349 98.251


B 3.60 1.522 98.078
C 5.00 1.506 98.094

2 3.50 1.318 98.282 01+725


3 3.60 1.476 98.124
4 5.00 1.475 98.125

A 3.50 1.304 98.296


B 3.60 1.458 98.142
C 5.00 1.452 98.148

2 3.50 1.420 98.180 01+750


3 3.60 1.572 98.028
4 5.00 1.567 98.033

A 3.50 1.401 98.199


B 3.60 1.546 98.054
C 5.00 1.564 98.036

2 3.50 1.548 98.052 01+775


3 3.60 1.687 97.913
4 5.00 1.682 97.918

A 3.50 1.548 98.052


B 3.60 1.718 97.882
C 5.00 1.705 97.895

1.479 1.532 99.547 98.068 TP.05

2 3.50 1.452 98.095 01+800


3 3.60 1.619 97.928
4 5.00 1.617 97.930

A 3.50 1.459 98.088


B 3.60 1.606 97.941
C 5.00 1.612 97.935

2 3.50 1.394 98.153 01+825


3 3.60 1.542 98.005
4 5.00 1.545 98.002

A 3.50 1.438 98.109


B 3.60 1.584 97.963
C 5.00 1.592 97.955

2 3.50 0.000 99.547 01+850


Jarak Pengukuran
No. Bacaan Tinggi Alat Elevation Keterangan
Kiri Kanan
Belakang Depan

3 3.60 0.000 99.547


4 5.00 0.000 99.547

A 3.50 1.449 98.098


B 3.60 1.622 97.925
C 5.00 1.613 97.934

2 3.50 0.000 99.547 01+875


3 3.60 0.000 99.547
4 5.00 0.000 99.547

A 3.50 1.059 98.488


B 3.60 1.220 98.327
C 5.00 1.213 98.334

1.736 0.200 101.083 99.347 TP.06

2 3.50 0.000 101.083 01+900


3 3.60 0.000 101.083
4 5.00 0.000 101.083

A 3.50 0.000 101.083


B 3.60 0.000 101.083
C 5.00 0.000 101.083

2 3.50 0.000 101.083 01+906


3 3.60 0.000 101.083
4 5.00 0.000 101.083

A 3.50 0.000 101.083


B 3.60 0.000 101.083
C 5.00 0.000 101.083
Jarak Pengukuran
No. Bacaan Tinggi Alat Elevation Keterangan
Kiri Kanan
Belakang Depan
REKAPITULASI
DATA OPNEME LAPANGAN

KONTRAKTOR : PT. Pundi Viwi Perdana


NO. KONTRAK : PB.0201/KTR-SBM/Bb27PJNWI-BTN/PPK.1.2/V/97
TGL. KONTRAK : 21 Mei 2021 No. Item : 3.1.(1)
KONSULTAN : PT. Purnajasa Bimapratama Pekerjaan : Galian Biasa

: PT. Wesitan Konsultasi Pembangunan (KSO)


: PT. Astakona Dutasarana Dimensi (KSO)

QUANTITY
NO URAIAN KIRI / KANAN SAT KET
(M3)

1 STA 01+206 s/d STA 01+865 KANAN M3 160.971 Segmen 1

2 STA 001+206 s/d STA 01 + 456 KIRI M3


130.788 Segmen 1
3 STA 01 + 492 s/d STA 01+826.4 KIRI M3

JUMLAH TOTAL VOLUME M³ 291.759

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


Koordinator Lapangan Konsultan Supervisi Penyedia Jasa
PT. Purnajasa Bimapratama (KSO) PT. Pundi Viwi Perdana

Heri Sutana, ST Michael Rajagukguk, ST Sunandar, ST


Koordinator Lapangan Chief Inspector Quantity Engineer
CROSS SECTION
PAKET : PRESERVASI JALAN SERDANG - BOJONEGARA - Kontraktor : PT PUNDI VIWI PERDANA
MERAK MYC Konsultan : PT PURNAJASA BIMAPRATAMA (KSO)
PT WESITAN KONSULTASI PEMBANGUNAN
PERHITUNGAN EFEKTIF 1 (1+206-1+906)
PT ASTAKONA DUTASARANA DIMENSI
Jarak Pengukuran
No. Bacaan Tinggi Alat Elevation Keterangan
Kiri Kanan
Belakang Depan

1.461 101.297 99.836 BM 01

1 0.00 1.385 99.912 01+206


2 3.60 1.429 99.868
3 5.00 1.473 99.824

A 3.50 1.391 99.906


B 5.00 1.379 99.918

1 0.00 1.432 99.865 01+225


2 3.60 1.475 99.822
3 5.00 1.498 99.799

A 3.50 1.493 99.804


B 5.00 1.515 99.782

1 0.00 1.502 99.795 01+250


2 3.60 1.537 99.760
3 5.00 1.504 99.793

A 3.50 1.598 99.699


B 5.00 1.673 99.624

1 0.00 1.535 99.762 01+275


2 3.60 1.658 99.639
3 5.00 1.722 99.575

A 3.50 1.583 99.714


B 5.00 1.576 99.721

1 0.00 1.692 99.605 01+300


2 3.60 1.685 99.612
3 5.00 1.664 99.633

A 3.50 1.769 99.528


B 5.00 1.800 99.497

0.739 1.323 100.713 99.974 TP.01

1 0.00 1.283 99.430 01+325


2 3.60 1.291 99.422
3 5.00 1.280 99.433

A 3.50 1.293 99.420


B 5.00 1.288 99.425

1 0.00 1.340 99.373 01+350


2 3.60 1.385 99.328
3 5.00 1.440 99.273

A 3.50 1.382 99.331


B 5.00 1.350 99.363
Jarak Pengukuran
No. Bacaan Tinggi Alat Elevation Keterangan
Kiri Kanan
Belakang Depan

1 0.00 1.404 99.309 01+375


2 3.60 1.494 99.219
3 5.00 1.498 99.215

A 3.50 1.446 99.267


B 5.00 1.418 99.295

1 0.00 1.543 99.170 01+400


2 3.60 1.585 99.128
3 5.00 1.603 99.110

A 3.50 1.600 99.113


B 5.00 1.544 99.169

1 0.00 1.610 99.103 01+425


2 3.60 1.620 99.093
3 5.00 1.634 99.079

A 3.50 1.670 99.043


B 5.00 1.653 99.060

1.090 1.305 100.498 99.408 TP.02

1 0.00 1.440 99.058 01+450


2 3.60 1.482 99.016
3 5.00 1.500 98.998

A 3.50 1.445 99.053


B 5.00 1.418 99.080

1 0.00 1.420 99.078 01+475


2 3.60 1.503 98.995
3 5.00 1.461 99.037

A 3.50 1.502 98.996


B 5.00 1.493 99.005

1 0.00 1.458 99.040 01+500


2 3.60 1.550 98.948
3 5.00 1.585 98.913

A 3.50 1.487 99.011


B 5.00 1.457 99.041

1 0.00 1.678 98.820 01+525


2 3.60 1.632 98.866
3 5.00 1.488 99.010

A 3.50 1.533 98.965


B 5.00 1.510 98.988

1 0.00 1.690 98.808 01+550


Jarak Pengukuran
No. Bacaan Tinggi Alat Elevation Keterangan
Kiri Kanan
Belakang Depan

2 3.60 1.765 98.733


3 5.00 1.767 98.731

A 3.50 1.711 98.787


B 5.00 1.699 98.799

0.953 1.370 100.081 99.128 TP.03

1 0.00 1.350 98.731 01+575


2 3.60 1.404 98.677
3 5.00 1.450 98.631

A 3.50 1.351 98.730


B 5.00 1.323 98.758

1 0.00 1.347 98.734 01+600


2 3.60 1.429 98.652
3 5.00 1.413 98.668

A 3.50 1.373 98.708


B 5.00 1.365 98.716

1 0.00 1.380 98.701 01+625


2 3.60 1.503 98.578
3 5.00 1.478 98.603

A 3.50 1.375 98.706


B 5.00 1.390 98.691

1 0.00 1.416 98.665 01+650


2 3.60 1.552 98.529
3 5.00 1.541 98.540

A 3.50 1.423 98.658


B 5.00 1.439 98.642

1 0.00 1.398 98.683 01+675


2 3.60 1.545 98.536
3 5.00 1.540 98.541

A 3.50 1.414 98.667


B 5.00 1.422 98.659

1 0.00 1.468 98.613 01+700


2 3.60 1.540 98.541
3 5.00 1.543 98.538

A 3.50 1.483 98.598


B 5.00 1.480 98.601

1.021 1.169 99.933 98.912 TP.04

1 0.00 1.354 98.579 01+725


2 3.60 1.430 98.503
3 5.00 1.442 98.491
Jarak Pengukuran
No. Bacaan Tinggi Alat Elevation Keterangan
Kiri Kanan
Belakang Depan

A 3.50 1.344 98.589


B 5.00 1.351 98.582

1 0.00 1.343 98.59 01+750


2 3.60 1.470 98.463
3 5.00 1.438 98.495

A 3.50 1.384 98.549


B 5.00 1.398 98.535

1 0.00 1.500 98.433 01+775


2 3.60 1.522 98.411
3 5.00 1.508 98.425

A 3.50 1.535 98.398


B 5.00 1.608 98.325

1 0.00 1.538 98.395 01+800


2 3.60 1.521 98.412
3 5.00 1.510 98.423

A 3.50 1.560 98.373


B 5.00 1.532 98.401

1 0.00 1.520 98.413 01+825


2 3.60 1.498 98.435
3 5.00 1.480 98.453

A 3.50 1.549 98.384


B 5.00 1.587 98.346

1 0.00 1.504 98.429 01+850


2 3.60 1.448 98.485
3 5.00 1.391 98.542

A 3.50 1.575 98.358


B 5.00 1.520 98.413

1 0.00 1.209 98.724 01+875


2 3.60 1.129 98.804
3 5.00 1.175 98.758

A 3.50 1.222 98.711


B 5.00 1.283 98.650
Jarak Pengukuran
No. Bacaan Tinggi Alat Elevation Keterangan
Kiri Kanan
Belakang Depan
REKAPITULASI
DATA OPNEME LAPANGAN

KONTRAKTOR: PT. Pundi Viwi Perdana


NO. KONTRAK: PB.0201/KTR-SBM/Bb27PJNWI-BTN/PPK.1.2/V/97
TGL. KONTRA: 21 Mei 2021 No. Item : 5.1.1.
KONSULTAN : PT. Purnajasa Bimapratama Pekerjaan : Lapis Pondasi Agregat Kelas A

: PT. Wesitan Konsultasi Pembangunan (KSO)


: PT. Astakona Dutasarana Dimensi (KSO)

QUANTITY
NO LOKASI ( STA ) KIRI / KANAN SAT KET
(M3)

1 1 + 206 s/d 1 + 865 KANAN M3 168.905 Segmen 1

2 1 + 206 s/d 1 + 700 KIRI M3


149.950 Segmen 1
3 1 + 700 s/d 1 + 826 KIRI M3

JUMLAH TOTAL VOLUME M³ 318.855

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


Koordinator Lapangan Konsultan Supervisi Penyedia Jasa
PT. Purnajasa Bimapratama (KSO) PT. Pundi Viwi Perdana

Heri Sutana, ST Michael Rajagukguk, ST Sunandar, ST


Koordinator Lapangan Chief Inspector Quantity Engineer