You are on page 1of 48
Ministry of Electricity, Water & Renewable Energy Booch AbUbally stbly sy 65H Byhyy Power Stations and Water Distillation Plants OAL platy gS opal clas glad Tender for er eevee PU ey dns addy Sy sayy : adie of Equipment for Reverse Osmosis Project at | ty yxy gS ey lglg dane 1 Shuwaikh Power and Water Distillation Station Document No. Description Page No. 3-0 Introduction 3-1-1 31 Scope of Work 3-1-2 to 3-1-7 3-2 Special Specifications 3-2-0 to 3-2-28 | 3-3 Price Schedules 3-3-0 to 3-3-6 (3-1-0) He tboighly by 351 (3 ) gy tab 2022-2021 66 | p55: gi tabla Ministry of Electricity, Water & Renewable Energy Sodeyahl Bly clkly oy, 45I yyy Power Stations and Water Distillation Plants bh laity Sah gS sl) Colas ead Tender for : Supply, Installation and Modification wl Bag Olas psy Sy yg: Lad of Equipment for Reverse Osmosis Project at 7 Fi OLN lady AS 4S spill Ag Aaptll dares pKa Shuvwallds Power and Water Dstilation Staton | °C! MAH S245) esi yl Gerth 3.0 Supply, Installation and Modification of Equipment for RO Project 3.0.1 Introduction ‘The Reverse Osmosis Plant at Shuwaikh Power and Water Distillation Station (SHPS) consists of Doosan designed RO plant units with capacity of thirty (30) million gallons per day. (MIGPD). ‘The objective of this tender is for the supply, installation of new seawater debris filter system, by-pass line, inlet, outlet and by-pass motorized butterfly isolation valves, modification of existing seawater recycle line, including all mechanical, electrical, instrument and control, and civil excavation and construction works, MEW requires a reputable engineering company to carry out the mechanical, instrument and control, and civil works for the supply, installation, and modification of equipment for the Reverse Osmosis (RO) plant and shall be treated as a Turnkey Project. The works shall be in accordance with and shall meet the original design criteria. This Tender Document also covers all required site investigations, engineering, material procurement, supply, manufacturing, shop inspection, packing, shipping, site acceptance tests (SAT), dismantling, erection, ‘commissioning, and all other activities. 3.0.2 Scope of Supply 3.0.2.1 by MEW 1. Site facility utilities, electricity, water and location for site offices and storage areas. 2. Laydown areas for temporary scrap material disposal 3. Available drawings for RO plant systems 4. Alll relevant permits to work. 3.0.2.2. by Contractor ‘The Contractors Scope of Supply shall be applicable to all sections under this Tender and shall include, but not be limited to the following: - 1. All bidder(s) must visit Shuwaikh Plant before submitting bid offers to familiarize themselves of the extent of works required in this tender document. All bidder(s) must perform site surveys and inspections of existing plant infrastructure, identify areas requiring excavations, and trench stabilizations to prevent collapses and damage to existing plant. The site visits will enable bidder(s) to prepare bid offers with full understanding of actual site and operational conditions, and for preparation of manufacturing, supply, delivery, construction programs and procedures that will have minimal interruptions to existing plant operations and availability, ete. 2. The necessary specialist manpower, skilled and unskilled manpower resources, for the execution of the mechanical, electrical, instrument and control replacement works. 3. The necessary tools, equipment, scaffold materials, consumables, vehicles, trailers, mobile cranes, lifting appliances etc., and any necessary materials for the execution of the tender specification works. 4. The necessary vehicles, trailers, mobile cranes, lifting appliances, etc., for removals, transportation, and disposal of all scrap materials from the temporary site scrap laydown areas to MEW Subhan Stores after completion of the tender specification works. (341-1) El lbstly by, (3) 2022-2021 / 66 [ps : 5, Labial Ministry of Electricity, Water & Renewable Energy Power Stations and Water Distillation Plants ‘Tender for : Supply, Inst tion and Modification of Equipment for Reverse Osmosis Project at Shuwaikh Power and Water Distillation Station Bodmah Albay clbly sy gS! Syhiy OLLI platy Any gS) oyill collet glad LEW Bee Ole Jotaly Sy yy: Ladle OAL lay AY GSN Syl dy Gyptlt Maras pn Sall Document No. (3.1) (Scope of Work) (1.3) qoally diaianil | Shes! gua (3-1-2) Hdl Obbeighly byt) (3) by deed 2022-2021 | 66 | oS 5: 9; dadiall Ministry of Electricity, Water & Renewable Energy Soden! Willy ely cg! hy Power Stations and Water Distillation Plants Ah play Ry gS dl cle gad | rent eatenaroaman | gost anmamesees | of Equipment for Reverse Osmosis Project at z : 2 Ll adiy Zs gS spill LS fay dans pS ‘Shuwaikh Power and Water Distillation Station ° a TABLES OF CONTENTS | Document Description Page No. | 3.L1 Mechanical Scope of Work 3-1-4 3.1.2 Electrical Scope of Work 3-1-6 3.1.3 Instrument & Control Scope of Work (3-1-3) At Adsigiy by (3) dy aah 2022-2021 (66 / 65 5: by Ladtal Ministry of Electricity, Water & Renewable Energy Bodoralt ally ellly ch 450 B,h39 Power Sti eh lady Hash gS sgl lat glad aI Beg Older aly S79 yg adie OL edly Sly gS yi ed Gap tl Hers pS ions and Water Distillation Plants : Supply, Installation and Modification of Equipment for Reverse Osmosis Project at Shuwaikh Power and Water Di ‘Tender for lation Station Bl Mechanical Scope of Work 3 . 1. New Debris Filter System Due to operational requirements a new debris filter with backwash, by-pass line, inlet, outlet, and by-pass motorized butterfly isolation valves are required to be installed in the existing underground GRP seawater supply pipeline with filter elements to handle mussel shells, algae, seaweed, seagrass, jelly fish, and all other particulate matter coming from the sea. The new debris system cooling seawater minimum operating pressure ‘must be maintained. The existing hypochlorite dosing is only undertaken once a day. 3.1.1.2 Scope of Supply The Contractor's scope is for one (1) new debris filter system and shall include but not be limited to the following: - 1. Supply, detiver, instal, test and commission new debris filter with backwash facility and by-pass line, inlet, outlet and by-pass motorized butterfly valves, actuators, gaskets, bolting, supports, etc., and including all mechanical, electrical, instrument and control equipment and components, local control panels, power and control cables, conduits, etc. The debris filter controls must be integrated into existing DCS system in the RO plant control room. 2. Supply, deliver, modify, install new GRP by-pass pipe, tee-piece, 90° elbows, reducers, mating flanges, ete 3. Supply and deliver all necessary materials, concrete, aggregate, sand, reinforcing bars, backfilling soil, bedding sand, pit ladder, pit drain system, steel cover plates, etc. 4. Supply and deliver recommended spare parts, consumables, and contractual spare parts. 3.1.13 Scope of Work ‘The Contractor's scope is for one (1) new debris filter system with by-pass line and shall include but not be limited to the following: - 1, Excavate area around existing GRP seawater underground pipeline at required location, excavate area around existing GRP seawater recycle line. Construct new debris filter concrete pits and any other pits, if required, install pit ladders and steel covers, ete. 2. Cut existing GRP seawater pipeline, install new debris filter into existing GRP line, install new GRP by- pass pipe, install new inlet, outlet, drain lines and vent lines for each modified lines, by-pass isolation butterfly valves, install new GRP backwash discharge line to sea, modify existing GRP recycle line, install new tee-piece, 90° elbows, reducers, flanges, etc. Install new local control panels, electrical power, instrument cables, field instruments, etc, test, commission, and handover system to MEW. 3.1.1.4 Technical Specifications (Debris Filter) Seawater Supply Flow 9,000 mh (Minimum) Seawater Supply Flow 18,000 m’h (Normal) Seawater Supply Flow 21,000 m'/h (Maximum) Seawater Supply Operating Pressure 24 bar Differential Pressure at Normal Flow 60 mbar Differential Pressure at Minitnum Flow 30 mbar Differential Pressure at Maximum Flow 90 mbar Filter Screen Size 24.0 mm or less Operating Pressure Seawater Supply Header 1.5 Bar (Minimum)

You might also like