You are on page 1of 1

000.

00
376.00

BP: 0+
374.00

0
0+000 372.0

S89° 06' 36.21"E

00
0.
298.67m

37
00
0+100 6.
368.00 36
N 370.00

298.67
BEG. OF PROJECT @ STA. 0+000

PC: 0+
0+200
W
E
ELEV.=369.854M

368.00
N=311311.74
E=371041.05

0+300
S

MAT
LINE CH
PLAN

: STA
SCALE: HOR.: 1:1000
ROAD CENTERLINE PROFILE

+340 .0
375m
GRADE BREAK STA = 0+000.00
374m PVI STA:0+341.40
ELEV = 369.854
PVI ELEV:364.45
373m PVI STA:0+062.07
LVC:147.04
PVI ELEV:371.84
372m
LVC:60.06

BVCS: 0+267.88
BVCE: 366.40
371m
ELEVATION

370m 3.19%
EVCS: 0+092.10
EVCE: 371.04
BVCS: 0+032.04
BVCE: 370.88

369m
-2.64%
368m

367m

366m

365m
364m

363m

STATION 0+100 0+200 0+300


369.511

367.661

366.341
370.173

370.493

370.812

371.100

371.293

371.390

371.389

371.290

371.095

370.569

370.304

370.040

369.776

369.247

368.983

368.719

368.454

367.926

367.397

367.133

366.868

366.604

366.103

365.903

365.615

365.528

365.478
370.833

368.190

365.740
370.51

371.21

365.61
370.18

370.83

371.15

371.28

371.24

371.17

371.13

371.05

370.80

370.52

370.23

369.95

369.67

369.29

368.96

368.63

368.30

367.97

367.65

367.23

367.09

366.95

366.82

366.68

366.55

366.32

366.14

365.97

365.79

365.43
E.G.E & F.G.E

HORIZONTAL GEOMETRY L=298.67m LC=182.01m, R=300.00m


I=34° 45' 41"

L=32.04m LVC=60.06m L=175.77m LVC=147.04m


VERTICAL GEOMETRY g=+3.19% 0+062.07 g=--2.64% 0+341.40

ENS0+268.85

BFS0+307.00
11.84m

RC0+295.16
LC0+282.00
13.16m
SUPERELEVATION 13.16m
11.84m

PREPARED BY: PROJECT TITLE: SHEET CONTENTS: SUBMITTED TO: SHEET NO.

PLAN AND PROFILE ENGR. BERNADETH VENZON-DAPUN, M.


PROPOSED LOCAL ROAD AT BRGY. BASAK, LEBAK, SULTAN KUDARAT
3
REPUBLIC OF THE PHILIPPINE
UNIVERSITY OF SOUTHERN MINDANAO MARL JOHN F. PINEDA
COLLEGE OF ENGINEERING AND COMPUTING
KABACAN, NORTH COTABATO
(STA. 0+000, STA. 1+220) FROM STA.0+000-STA.0+340
LOCATION:
YEAR/COURSE/SECTION:
4/BSCE/B BRGY. BASAK, LEBAK, SULTAN KUDARAT DATE: DECEMBER 17, 2018