Mumbai Metro Rail Corporation
DOCUMENT SUBMISSION REPORT (DSR) - STATUS SHEET
conract no: MB-CBS-PST-001/2015 encode (SG6-PSS5UB-000743-ROO
IM. Larsen & Toubro Limited, Rallway Discipline: (GC ply System (PSS)
Gina esta nereec mes vaetes vpply Sen 5S)
Contractor Name & byindscape Building, TOWET-A, 8th Floor, Assesor K Singh Dy
2/3, Dethi-mathurs Road Near Sarai Metro | Dscptne fry singn =
tation, Faridabad - 121003, Haryana, India _| Coordinator a wel}
Attention: Mr. Satish Naik ta Piotr Pawius ¢
faforonce of Transmittal PSS-GCC- SUB-000T4S-ROO
Tranaital received on 5-06-2019
TTAGHMMQP for DTS Monitoring system
\List of documents submitted: __|
Wo. Déctieot Rteaice reson | oe
ss-ccc-poc-000142
a |(MQP for DTS Monitoring System) mod) 06-2018)
-efation ofNoaton
Cheon Acamplete essbmisonsequred
inven wtheanment
EndularNeiyenee
Area of Deficiency
Please find attached DSR Comment Sheet (page 1). Comment Items
No, of Total Comments —
No. of New Comments
No, of Repeat Comments :
Engineer -
Printed Name: Position: Date Signature:
Daniel Ledouget —_—_| Deputy Project Manager (System) |20-06-2019
Enel: DSR Comment Sheet
CC: "Mr. Praphull Wagh, Goneral Manager (Electrical), MMRC
lle
~The commentsare given fo ensure the submission conforma othe Contract provsians
+ Theissue of ONO shall not in any way relieve the Contactar of is obligations under Contract, noe doestt many way mpl any change to te Contract
rice or Time for Completion
1Contract No:
Reference of Letter/Transmittal
Reception date of Letter/Transmittal
Mumbai Metro Rail Corporation
DOCUMENT SUBMISSION REPORT (DSR) - COMMENT SHEET
MIM3-C8S-PST-003/2015
DEFINITIONS
PSS-GCC-SUB-000143-ROO
* Area of Deficiency (1)
05-Jun-19
4: Design not complying with functions; 2: Detail incomplete;
3: Detail not submitted; 4: Undesirable design feature;
(GCC PSS-SUB-000143-ROO
5: Conflicting dato; 6: Other (Specify)
PSs '* Status of Comments (2)
‘Assessor:|D K Singh a te revised documents. (NS);
Discipline Coor HB Singh eR resubmission (PR); C. Notice of No Objection
Discipline TL: [Piotr Pawlus Bg Status (3)
fPeting t= On Hol C=Csed
Subject MOP for DTS Monitoring System
ee
ESSERE es Co
Fund] of [status] Contractors/Suppliers Closure
coments na
Ne] aarseowe |e] sagen ee orm anen|oeel (2 Bae b|2" | coe] tue
i ny
1) rssceznoconosa [ro vaya
ur apa esnpecmee
farses Yer