You are on page 1of 20
® CERTIFIED TEST, ADJUST, AND BALANCE REPORT DATE JUNE 2022 PROJECT: NAME UNM AL QURA UNIVERSITY ADDRESS MAKKAH, SAUDI ARABIA ARCHITECT: NAME ADDRESS PHONE = - FAX = DESIGN ENGINEER: NAME - ADDRESS - PHONE = - FAX = HVAC CONTRACTOR: NAME — ABDULRAHMAN O.M. AL OTHMAN & PARTNERS CO. ADDRESS AR RAHMANIYAH, AT TAKHASSUSI BR. UNIT 4, RIYADH 12342 KINGDOM OF SAUDI ARABIA _ PHONE + FAX + NEBB TAB FIRM: NAME ABDULLAH AL HAMOUD AL SHUWAYER CO. (seme ADDRESS P.0,BOX5115,DAMMAM 31422 cenmenMmeNTA KINGDOM OF SAUDI ARABIA 2, PHONE (9663) 848-9999 FAX (9663) 848-411 TAB CERTIFICATION NUMBER: 2659 National Environmental Balancing Bureau CERTIFICATION o PROJECT UMM AL QURA UNIVERSITY ADDRESS MAKKAH, SAUDI ARABIA ‘THE DATA PRESENTED IN-THIS REPORT IS A RECORD OF SYSTEM MEASUREMENTS AND FINAL ADJUSTMENT THAT HAS {BEEN OBTAINED IN ACCORDANCE WITH THE CURRENT EDITION OF THE NEBB PROCEDURAL STANDARDS FOR TESTING, [ADIUSTING, AND BALANCING OF ENVIRONMENTAL SYSTEMS ANY VARIANCES FROM DESIGN QUANTITIES, WHICH EXCEED NEBB TOLERANCES, ARE NOTED IN THE TEST - ADJUST - BALANCE REPORT PROJECT SUMMARY. ‘SUBMITTED & CERTIFIED BY: NEBB CERTIFIED TAB FIRM NAME ABDULLAH H. AL-SHUWAYER SONS COMPANY. CERTIFICATION NO, _2689_ CERTIFICATION EXPIRATION DATE MARCH 31, 2024 REPORT DATE JUNE 2022 | oennis a. Pavnenra a\ orn 2659 Exp. argvee NEBE QUALIFIED TAB SUPERVISOR NAME NEBB QUALIFIED TAB SUPERVISOR SIGNATURE but Binet raa208 Nation! Enviromental Slancing Bureau cons Neve 08 eo evar Staeat A.H. AL-SHUWAYER CO. VAC TESTING DIVISION [NERD CERTIFICATE NO.7639 @ PROJECT UMM ALQURA UNIVERSITY LOCATION MAKKAH, SAUDI ARABIA PROJECT SUMMARY SYSTEM “ALL: (CHILLED WATER SYSTEM ‘THIS REPORT REFLECT THE ACTUAL MEASUREMENT FOR THE CHILLED WATER FLOW OF HVAC EQUIPMENT 'AS WELL AS THE FLOW FROM THE MAIN CHILLED WATER PIPES, (CHILLED WATER DESIGN FLOW SUMMARY [sn_| Buc. BUILDING NAME DESIGN GPM af 4 Goneral Administration 917.72 2|3 Media / Conference Center 1,647.64 3| 4 Computer Center 599.13 a|is Central Library 4,357.82 sl 6 Mosque 4 100.91 | 6a Mosque 2 100.94 7| 68 Central Mosque 499,28, a| 12 Allied Deansip Bullding 374.58 | 13 College of Shariah 1,978.08 so| 14 College of Dawa 41,503.90 a1| 45 College of Arabic Language 4,200.11 12| 16 College of Education 1,598.74 a3|_ a7 College of Social Scionce 4,281.21 14| 180, College of Applied Science 4517.25 15| 188, College of Engineering 4273.68 16| 20 ‘Men's Indoor Sports 698.99 47|_36 Clinic A 49.93 48| 37 Inst. Scientific Research 928.55 49| 380 ‘Student Activities Center 599.13 20| 388 | inst. Arabic LanguagelEnglish 728.04 ai] 41a Retail Shops Not 53.09 22| 416 Retail Shops No.2 53.89 23| atc Retail Shops No.3 78.99 24| 41D Retail Shops No.4 73.99 25| ae Retail Shops No.6 78.99 orcs ej Notable Stange wath Nets cereston Sos |A. H. AL-SHUWAYER CO. HVAC TESTING DIVISION [NERD CERTIFICATE NO.2589 PROJECT SUMMARY ® Provo UMMALQURAUNVERSTY _ system AL LOCATION MAKKAH, SAUDI ARABIA _ _ fen [aupe BUILDING NAME DESIGN GPM 25| 4tF Reta Shops Nos 7399 zr| opt Chile Plant 4 395.46 za| op2 rier Plant 2| 386.48 2s avs Guest Vila Type 3 729.56 ao[ mc Mosque 64,05, 68,67 403.5 st] DH Men's Dining Hal 959.07 a2] sH Mon's Social Hall 238.98 sa| RS Reta Shops 9-12 107.78 aa] sca Social Genter Type A $6.00 as| sce Social enter Type b e404 36] sat | Student Housing Type A 1,496.28 a7| saz | student Housing Type A 5,996.68 26| $3 Student Housing Type B 2316.21 39] oR ‘Classroom 1 604.18 40] cR2 Classroom 2 604.15 a1] oRs Classroom 3 604.15 wa|_cra classroom 4 604.18 TOTAL DESIGN GPM] —__40923.24 ca — RT Gi, | marron | aman [TST cmueneawt | 6 zoe | 4 208 cwLERPLaNT2 | 6 2082 | 4 2208 TOTAL OLLER GAPACTVINOPERATION| 16416 vesoncauercarerrsTomueesen | 41% ope Wa ad rae Stop wih EBB Certeton Sea DENNIS RPAMIENTA ‘CERTIFICATION PROUECT LOCATION AHH AL-SHUWAVER CO. HVAC TESTING DIVISION PROJECT SUMMARY NEBB CERTIFICATE NO.2689 e UMM AL QURA UNIVERSITY system ALL: MAKKAH, SAUDI ARABIA REMARKS: 4. The total chilled water flow requirement is basod on the Primary Chilled Water Distribution drawing that has been provided. 2s por normal operation with 4 pumps in each Plant, the chilled water capacity can provide only 41% of the design requirement which is excessively low. 2. Chiller Plant 2 during testing is operating with four (4) pumps and 2 chillers in 100% cooling and the other two (2) were off with no demand, the leaving water temperature of two (2) chiller is 5°C which mixed with the other 2 off chillers with 11.67 °C and will now have at least 8.7 °C which is not ideal as entering water temperature of the building. Take note that the actual entering water temperature is reaching 10 °C which means that Chiller Plant ‘has a possibility of much higher leaving water temperatu RECOMMENDATION With the actual condition of insufficient water flow to the building with high entering water temperature, the possibility of cooling inadequacy Is possible. Proper assessment of design requirement shall be made with the correct sequence of HVAC equipment from Chiller Plant shall be establish to Improve the current ct 1d wator system operation. Furthermore, as per the test result for the AHU's in the building itis suggested that the ure free of dirt or foreign debris. strainer of the unit shall be check to er (GENERAL COMMENTS. Data is not always specified . This is indicated throughout the report by "N.S." pat Net abs Us A. AL-SHUWAYER CO. HVAC'TESTING DIVISION NEB CERTIFICATE NO. 2589 e PROJECT UMM AL QURA UNIVERSITY LOCATION MAKKAH, SAUDI ARABIA DESCRIPTIONS 4. COVERPAGE CERTIFICATE, ‘PROJECT SUMMARY INDEX 2 CHILLED WATER SYSTEM ULTRASONIC FLOW METER TEST REPORT BALANCING VALVEIFLOW METER TEST REPORT vane aon Environmental Balancing Bure comets eso ht aid Uless Soro PAGE No. Ht 19 1046 syiS RPAMIENTA 5° EERTIFICATION 659 A. H. AL-SHUWAYER CO, HIVAC TESTING DIVISION ULTRASONIC FLOW = [BBB CERTIFICATE NO. 2659 METER TEST REPORT PROJECT __UMM AL QURA UNIVERSITY ‘SYSTEMUNTT CHILLED WATER LOCATION MAKKAH, SAUDI ARABIA vesin ] pre seacins | ACTUAL service |vocanon] ‘rcow | Sze | Pe, | TRansoucer | cranes | “ow | Wah teem | fmm na ‘om | (com wane | pranr2 | atieny | ose | sreeceareon| goosvean | aera | aro | 1800 % REMARKS: CHILLER PLANT FOUR} PUMPS IN OPERATION CRCULATING THROUGH THE FOUR it CHILLERS (PUNP CAPACITY. 2052 GPM = TEST DATE ‘APRIL 2022 READINGS BY C.CAPUNTANE [gm PRMENTA ‘CERTIFICATION atonal Environmental Balarlng Bure geese Report vata ies Str ih ° A. H. AL-SHUWAYER CO, HVAC TESTING DIVISION ULTRASONIC FLOW = [NEBB CERTIFICATE NO. 2659 METER TEST REPORT PROJECT UMM AL QURA UNIVERSITY SYSTEMIUNIT CHILLED WATER LOCATION MAKKAH, SAUDI ARABIA vesion | rire sercns | actus semvce |rocanon| ‘row | Sue | 2S, | Tmsoucer | Serance | “ston | Wale ‘oom | Gem tom | ce waveve | ovrsoe | zn72 | ozo | svec.carson] —taosvean | ane | wo | a1 w REMARKS: MAIN PIPE OF GENERAL ADMIN, CENTRAL MOSQUE, ALLIED DEANSHIP & COMPUTER CENTER (BLOG. #1, 4, 6B & 12, = Test DATE APRIL 2022 READINGS BY .CAPUNTTAH soy RAMIENTA CERTIFICATION ore apr ot al es Soe wh A. H. AL-SHUWAYER CO. eT, ULTRASONIC FLOW ® METER TEST REPORT LOCATION MAKKAH, SAUDI ARABIA DESIGN PIPE spacing | ACTUAL PIPE ‘TRANSDUCER WaLL service |Locarion| FLOW Sue oistance | FLOW | ou = MATERIAL SIZE fa con | om WAINPIE | BLOG.15 | 120011 | on20 | STEEL CARBON | #20 SHEAR. 201.88 ‘192 818 REMARKS: COLLEGE OF ARABIC LANGUAGE DENNIS A PAN TEST DATE READINGS BY - CAPUNI ENTA ST ‘APRIL 2022 v «, ‘CERTIFICATION rome Navona! Envronmentl Balancing Bureau Sonos Repot Na Vl nis Stamped wth A.H, AL-SHUWAYER CO. HVAC TESTING DIVISION [EBB CERTIFICATE NO. 2659 ULTRASONIC FLOW METER TEST REPORT CHILLED WATER e PROJECT _UMMALGURA UNIVERSITY sysrewunrr LOCATION — MAKKAH, SAUDI ARABIA oesion | re seasons | Actua. serves |tocinon| ‘row | Se | ME] TRANSDUCER 7 Seance | “Rom | WALL corm | em may | (oom WANE | eibasr| szass | onan | svecrcarcon] ssosvean | ange [a | en8 112% TEST DATE APRIL 2022 REMARKS: INSTITUTE SCIENTIFIC RESEARCH “TWO (2) PUMPS IN OPERATION DURING MEASUREMENT (PUMP CAPACITY -920 GPM EACH) READINGS BY Report Not Vb Unless Striped wit NeB® Cerfeaton Sea c.capunray | vewus a o659 Pagep Bios A. H. AL-SHUWAYER CO. tivacrestine vision ULTRASONIC FLOW NEU CECTINGATE NO 2s) METER TEST REPORT e PROJECT UMM AL QURA UNIVERSITY sysTewunrt CHILLED WATER LOCATION — MAKKAH, SAUDI ARABIA vesen | Pie spacnie | Actua. serves |tocanon| ‘now | Sze | ehe, | Trawsoucer | Seaver | “rom | WALL (oom | tom mm) | (oom wawwe | eta ir| ata | onan |sveercanson| —vaosnean | mise | am | are 18 REMARKS: COLLEGE OF SOCIAL SCIENCE (ONE (1) PUMP IN OPERATION DURING MEASUREMENT [PUMP CAPACITY - 1288 GPM) DENNIS R. PAMIENTA ‘CERTIFICATION 2659 TEST DATE APRIL 2022 READINGS BY ©. CAPUNITAN| seen Report Not Vad ress Stamped wih NEBO Carfeaton Sea Biacastmepvsion. ULTRASONIC FLOW Neds Cerna NO 359 METER TEST REPORT ° PROJECT _ UMM AL QURA UNIVERSITY ‘SYSTEMIUNIT LOCATION MAKKAH, SAUDI ARABIA CHILLED WATER seacine | acTuaL | wap vesien | ire senvice |tocanon| ‘row | size | PRE, | Teansoucer | omance | “row | Walt oom | Gam) mn) | (GoM mame | exe 1 | rwere | ona |svecrcarson| esosmean | ases | a | 927 a REMARKS: COLLEGE OF EDUCATION shu ‘TWO (2) PUNPSIN OPERATION DURING MEASUREMENT (PUMP CAPACITY -800 GPMEACH) er, DENNIS A. PAMIENTA CERTIFICATION Test DATE APRIL 2022 READINGS BY ©. CAPUNITRNE Nona EnvtronmentlGlareing Bureau por Not Va Use Stampa with S NEBR Carfeston Sea £0 bya S A. H. ALSHUWAYER CO, fvac Vestine o1siow ULTRASONIC FLOW eS CERTIMCATE NO 359 METER TEST REPORT ° PROJECT _ UI AL QUA UNWERSITY SYSTEWUNT __ CHILLED WATER LOCATION MAKKAH, SAUDI ARABIA vesion | rire seacine | aca. service |tocanon| ‘riow | Sie | PE |TRansoucer | Sretance | “Fuom | WALL (com | gam ‘om | on wanpre | eioe.15 | swrece | onzw |svec.carcow| ewsmean | ane | co | ane ox REMARKS: COLLEGE OF SHARIAH DENNIS R PAMIENTA TEST DATE ‘APRIL 2022 READINGS BY ©. CAPUNITS NS FON anes Nona Environmental Balancing Bureas pte Resor Not Vata Urls Sapa wh NEB Carfcaton Sea A. H. AL-SHUWAYER CO. IY STI ION ULTRASONIC FLOW " METER TEST REPORT e PROWECT _UNMALGURAUNIVERSIY sysrewunrr CHILLED WATER LOCATION — MAKKAH, SAUDI ARABIA service |tocanon| ‘rxom | sae | 4 PRE, | Transoucer | oetance | “row | Wale oom | tom vom | (om mur | ens | ws | ove |svetcanoon] ose | me | m2 | 50 awa | ca | ns_| on |sresccanoon| #ansuear | os | ass | 00 | awa | ore | ns. | ono |sreercanoow| zosvean | mse | or | 500 wus | ora | ns. | onso |sreercangow| tsosuear | mse | x7 | 5a nus | cma | xs. | ovo _|sreercanoow| asoswean | mse | no | 500 aws | cr _|_ns | ons |steercaroon| —aansuear | os | oro | sa ‘uz | ora onso |secrcarcon| azosnear | se | ms | sa ws | ora over | stesvcareon| aansiear | ose | m3 | sw ora, | sos sa | m REMARKS: CLASSROOM 3 TEST DATE APRIL 2022 READINGS BY ©. caPUNTANS) BS Soret sce oot Vte Use Sard wo A.H. AL-SHUWAYER CO. HVAC TESTING DIVISION [NEBB CERTIFICATE NO. 2659 PROJECT _ UNM AL QURA UNIVERSITY LOCATION MAKKAH, SAUDI ARABIA SYSTEMUNIT ULTRASONIC FLOW METER TEST REPORT __GHILLED WATER. vesion | Pe exons | actua. sence fLocanon| ‘now | sme | MRE, | Transoucer | Serance | “Fuow | WALL ccom | (nm ‘omy | (om mwi | on | wa | one | sres.canoow| — sa0svean at | se awa | or _|_ms._| ons | stesrcaroow| 20 sean ws | 0 aws | cre | ns_| ov» | stesicanoow| ea0snean ar | so awa | cre | ns. | over —|-sres.canoow| — #20svean ai | so saws | or | ms. | ower | stesvcaroou| —#snsiean s_| sao nws | cre | ms | ovr | srestcangow | e20shean st | se aw7 | ort | ms. | ome | stecrcarson| #20 sHean er | se | om | ns. | owen | sresrcanon | sa0snen ar_| se ora. | cuss wan | REMARKS. CLASSROOM # DENNIS R.PAMENTA CoRTIFIGATION TEST DATE eR. 2002 READINGS BY ©. CAPUN a top Eten Bang Be por No vale Unies Samet wih ‘Nebo Gettin Sea! A. H. ALSHUWAYER CO. HVAC TESTING DIVISION, BALANCING VALVE/FLOW METER TEST REPORT ® PROJECT _ UMM AL QURA UNIVERSITY. SYSTEMUNIT ___GHILLED WATER LOCATION MAKKAH, SAUDI ARABIA ‘ACTUAL, ‘ACTUAL, SERVICE DESIGN VALVE valve | ACTUAL orvesicnation | SE | MODEL GPM SETPOINT PD. ce | NOTES (DEGREE) KPA WAIN PIE/BLDG.12 | DN4150 | CRANEDASs! ] 374.69 80 530 3sa7_ | 103% REMARKS: ALLIED DEANSHIP BUILDING = | penwis A. PAWIENTA S\"cermicarion 2659 ‘TEST DATE APRIL 2022 READINGS BY ©. CAPUNITAI vane atonal Environment! Balancing Bureau ores Report Not ved Unies Stree wh NeBe Cartoaton Se! A. H. ALSHUWAYER CO, hACTHSTING BION BALANCING VALVE/FLOW - BATHGATE NO METER TEST REPORT PROJECT _ UMM AL QURAUNVERSITY __systewunrt CHILLED WATER. LOCATION MAKKAH, SAUDI ARABIA ‘ACTUAL "ACTUAL SERVICE DESIGN VALVE VALVE | ACTUAL orvesicnarion | SZ | MODEL crn ‘SETPOINT com {NOTES (DEGREE) MAIN PPE/@LDG.14 ] DN200 | HATTERSLY797 | 150890 120 100 11m | 73% REMARKS: COLLEGE OF DAWA suis B, PAMMENTA S\** cermicarion TEST DATE ‘APRIL 2022 READINGS BY ©. CAPUNIKATE, 1659 B® rane Nationa Environmental Slancng Bureau enn nes oper tt Vad ress Stamp wi TNeDe Cartaston Soa AH. AL-SHUWAYER CO. fuachestncovsion BALANCING VALVE/FLOW . Nespessncnre no METER TEST REPORT PROJECT UMMAL QURA UNIVERSITY sysTeMUNIT —__GHILLEDWATER__ LOCATION MAKKAH, SAUDI ARABIA “ACTUAL, ‘ACTUAL SERVICE DESIGN VALVE VALVE | ACTUAL orvesicnation | SIZE | MODEL Pit SETPOINT PD, cpm | NOTES (DEGREE) KPA MAINPIPE/BLDG.38A | DN150 | CRANEOASSt | 599.19, 80 11.00 555 | 93% REMARKS: STUDENT ACTIVITIES CENTER DENNIS R. PAMIENTA ‘CERTIFICATION TEST DATE ‘APRIL 2022 READINGS BY . CAPUNI a Nations Environmental Balancing Bureau ers "por Not Vid Unies Strped wih NeBe Ceres Set A.H. AL-SHUWAYER CO. VAC TESTING DIVISION BALANCING VALVE/FLOW EBA CERTIFICATE NO. 2659 METER TEST REPORT e PROJECT __UMM AL QURA UNIVERSITY ‘SYSTEMUNIT (CHILLED WATER LOCATION MAKKAH, SAUDI ARABIA eS onan | ae | moon | oeagh | me, | ME | ACA [aor REMARKS: GENERAL ADMINISTRATION | venus A. pawenra CERTIFICATION TEST DATE ‘APRIL 2022 READINGS BY c. CAPUNITAR)\ 2659 Ep. 3031/24 wa sonal Envronmental Balancing Buen corset ep nt vats Uses Stamped WO ‘Neba Cettcsion Sen ‘Ac He AL-SHUWAYER CO. fhactestiN ONION BALANCING VALVE/FLOW —— METER TEST REPORT ® PROJECT UMM AL QURA UNIVERSITY SYSTEMIUNIT CHILLED WATER LOCATION MAKKAH, SAUDI ARABIA as nS | oe | moo | Oem | QUA, | MASE | ASU [ures REMARKS; INSTITUTE SCIENTIFIC RESEARCH [AAU TO AHU-A NEEDS TO CHECK THEY STRAINER AS POSSIGLE OIRT ACCUMULATION RESULTS TEST DATE ‘APRIL 2022 READINGS BY C. CAPUNIT/ DENNIS R. PAMIENTA CERTIFICATION ed Nona Environment! Balancing Bureau mina pot NotVa Unies Sted wit

You might also like