You are on page 1of 1

MARK

NOTES
d b TOP BOTTOM TOP BOTTOM TOP BOTTOM TOP BOTTOM

2G-1 500 300 3-20∅ 2-20∅ 3-20∅ 2-20∅ 3-20∅ 2-20∅

2G-2 400 300 3-16∅ 2-16∅ 2-16∅ 2-16∅ 3-16∅ 2-16∅


16 16 16 16 16 16
2B-1 300 250 2-12∅ 2-12∅ 2-12∅ 2-12∅ 2-12∅ 2-12∅

3G-1 500 300 3-20∅ 2-20∅ 3-20∅ 2-20∅ 3-20∅ 2-20∅ STIRRUPS A: 10∅
4@0.05, 6@0.10
4@0.15, REST@

FROM 2F TO ROOF
3G-2 400 300 3-16∅ 2-16∅ 2-16∅ 2-16∅ 3-16∅ 2-16∅ 0.20 TO C.L.

16 16 16 16 16 16
3B-1 300 250 2-12∅ 2-12∅ 2-12∅ 2-12∅ 2-12∅ 2-12∅
16 16 16 16 16 16 8
RG-1 350 250 2-12∅ 2-12∅ 2-12∅ 2-12∅ 2-12∅ 2-12∅
6-16∅ VERTICAL
16 16 16 16 16 16 BARS WITH 10∅
RG-2 300 250 2-12∅ 2-12∅ 2-12∅ 2-12∅ 2-12∅ 2-12∅ TIES 200mm O.C.
1@50,5@100, REST@150
COLUMN
SIZE 400mmx400mm

SCHEDULE OF FOOTINGS

FROM FOOTING TO 2F
FOOTING SIZE (mm) EXCAVATION BOTTOM REINFORCEMENTS
MARK REMARKS
DEPTH (mm)
LENGTH (mm) WIDTH (mm) THICKNESS (mm) ALONG 'L' ALONG 'W'
8
6-20∅ VERTICAL
F1 1000 1000 300 2000 6-20∅ 6-20∅ SPREAD BARS WITH 10∅
TIES 200mm O.C.
15630 1900 350 11-12 54-12 COMBINED 1@50,9@100, REST@150
TOP REINFORCEMENTS COLUMN
500mmx500mm
SIZE

SCHEDULE OF SLAB 9-16 51-16 COMBINED


MARK C1

REBARS SPACING ALONG SHORT SPAN REBARS SPACING ALONG LONG SPAN
SLAB
MARK THICKNESS REBAR COLUMN STRIP MIDDLE STRIP REBAR COLUMN STRIP MIDDLE STRIP REMARKS
DIAMETER DIAMETER
(mm)
(mm) @SUPPORT @MIDSPAN @SUPPORT @MIDSPAN (mm) @SUPPORT @MIDSPAN @SUPPORT @MIDSPAN 1 COLUMN SCHEDULE
2S-1 &
S4 N T S
120 10 150 150 150 150 10 200 200 200 200 2 1-WAY
3S-1
RD-S1 100 10 150 150 150 150 10 200 200 200 200 2 1-WAY

1 BEAM, FOOTING AND SLAB SCHEDULE


S4 N T S

SHEET CONTENT: STRUCTURAL PLAN

OWNER: CIVIL ENGINEER: PROJECT NAME: REVISED BY: DATE: SHT. NO:
DRAWN BY: - -
PROPOSED
DATE: - -
MA. ELLEINE A. HERNANDEZ et al
#1 Zamora St. Poblacion IV, Alfonso, Cavite 4 UNITS APARTMENT CHECKED BY: - - S-2
DATE: - -

You might also like