You are on page 1of 17
lt | Ga atat vest pyemisan == = Arab Engineering Bureau Controlled Copy Requirements for uploading Civil Defense inspection request Undertaking letter from the Consultant config the completon of all works, Ut of all equipment and Companies invohed in the Projet Copies ofall Municipality Permits Copies of commercial registration for Consultants / Main contractor / Fire and Life safety Specialists Copies of QCDD approved Fire and Life safety Specialists and Engineers. ID Copy of the project owner and Consultant representative. Cause and Effect Matrix Chart COD approved certificates with valid dates for all Fire Safety material. + Fire Fighting instalation - copies of approved Inspection reports. + Fie fighting Pipes — copies of approved Hydro-test reports + Fite fighting pipes — copies of approved flushing reports. ‘Testing and Commissioning reports forthe followin licabl) + Fie Pumps Field aoceptance test report as per NEPA 20 format. pumps sequential change over + Fite pumps shaft Alignment report. + Fite Pump room Ventiaton systems. * Sprinkler and FHR systems. + Basement Car-park Ventilation systems. + Pressurizaton ‘Stainwell, Smoke + Smoke evacuation system — occupied spa * Clean agent: Fit + Ener Cena Opesi ale ator Room Ventilation system. + Functional test for Generator - ATS. + Fire Command center Ventilation system. * Fite Alarm system ~ Interfacing with various Fire fighting systems, + Fite Alarm system ~ Functonal test (Under Battery power, FCC interfacing and CAMS ready tobe connected with MO, Ste measurements for rated decibel -Audo alarm ) + Voice evacuation system. + Emergency ighting — intensity levels report + Central Battery system (Battery calculation - FM 200 and Fite alarm ). + LPG detection! Alarm and interfacing with FCC. + Kitenen Hood Fire Suppression system, + Public Address, Cental security and Access Control systems. + Safely equipment in swimming poo (life jacket, buoy) + Aulomatic escape routetior— Interface with fre alarm. + Fire engine - hard standing ~ 40 Tons load bearing certificate, + Fite lis / Passenger Lis commissioning and shaft ventlaton detail. + Complete Fire Soenarios - Simulation tests Fire and Life Safety Guide - CSD Revision 0 ‘Arab Engineering Bureau Lr. E TI tuatan gets yen atsen Controlled Copy Requirements for QCDD inspection ~ Stage one ( On arrival of QCDD) As least Following personnel must b with their respect + Consuitant Engineers + Contractor Engineers, + Specialist Engineers. + Fire Pumps specials + Clean agent system specialist. + Fite Pro (Aerosol system) specialist + Fie Alarm Specialist + Ventilation Specialist + Lifts Specialist + Emergency Generator Specialist, + LPG system specials. NCA Fegan 19 and Fire Alarm, erator Load & Emergency lighting, al, MCAV, Fie Fight + Seto at ee Acchitectu rgency Power by Ge Water requirements + Hydraulic calculations for Sprinkler system. + Gas extinguishing system — Cyinder capacity + Emergency Power - Batory Calculations. + Tunnel Carpark Ventilation fans capacity calculations + CFD analysis report for Tunnel! Car-park Ventilation system and Smoke Control of Arum. culations. Follow made ava + All Specialist personnel representing on that day. + All Speciaist companies. +All Fie safety equipment and materials used. + A.compete set of Testing and Commissioning Reports witnessed and approved by Project Supenising Consutant, relevant specialist and Contracting Engineer. + A complete set of Fire Safely Material submittals approved by the Supervision consultant. + Instruments tobe arranged by Verious Specialists: Mult-Meter, Anemometer, Manometer, Tachometer, Smoke Generators, Decibel Meter, Detector actuators, Flash Lights, Ladders. + Calibration Certificates with vad dates forall Equipment and Instruments from QCDD approved Labs in Qatar. Fire and Life Safety Guide - csD Revision 0 2) [Quasar copii ype atsgi | _ W AE = Arab Engineering Bureau Sener Requirements for QCDD inspection ~ Stage Two (Site Visi In General, what QCDD will look for during Site Inspection? * Physical slate ofthe proect ike Cleantiness, completeness etc. * Check and verily the implementation of Life Safely and Loss prevention as per NFPA Codes considering worst case scenarios. * Check and ensure that COD approved plans are being flowed, + Ensure that the project comply with COD approved documents and practically vey the submited Testing / Commissioning reports by asking for demonstrations + Operating the Emergency Generalr set on Fullload capacity to take care of essential loads required (including Fire Pumps, extract Fans, Jet Fans, Emergency Lighting, its, Fire Alam Panel, Fite Command Center, Central Secuty Center et). rated walls / Compartments have Fire dampers + Fire rated cables used for equipment con ‘of sufficient thrust blocks and pipes and FCC requirements + Swimming Pool life safety requirements as, Fire and Life Safety Guide - sD Revision 0 8 aia oni gyetases trotted Copy] LP J=|S, restprceipben init Systems / Installations which will be witnessed by QCDD sheet sor + Installation of Fire Protection pipes / Risers, valves and acessories. (Separate for each Floor / area and Risers). + Pressure Testing of Pipes @ 16 Bars in general and 20 Bars inside the Fee Pump Room. + Instalation of Fire Pumps, piping and accessories in Fire Pump Room. + Installation of Sprinklers, Fire Hose Ree's, Breaching inlets, Hydrants, Landing Valves, Fire Extinguishers et. + Instat of Fire Dampers and duct Smoke detectors. + Instalation of Heat / Smoke / CO detectors + Installation of FM - 200 system ( Pipes, cyinders, FACP and accessories), + Alarm Gong actuation on single sprinkler discharge + Fire Pump Room Ventilation system, + Interfacing of Fire Alarm with Smoke / Heat sensors, Fire Pumps, Vale lemper switches, Sprinklers Zone contol stations, Pressutization Fans, Basement vent Fans (un + Lifts Homing in case of Fie Alarm, + Firemen Lift operation (As per FSS 6.83). hut-down interlocking with duct smoke fon of 32 mm Dia, Flushing connections onthe branch main at farthest pir of Breaching inlets and Alarm check Ve + Testing of Fire Hose Reels end Landing Valves. + Fire Blankets are fixed at al required locaton + Kitchen Hoods Fire protection system and interfacing with Fie Alarm, + Use of Fire Rate Cabls for all equipment supplied by emergency Power. + Testing of Emergency Lighting- Lux measurement, + Electric Power funcional and change over test of ATS, + Security & Acoess Contol system - Must unlock in case of Fire Alarm. + Application of Passive Fire Sealants on Fire Rated wals / Partitions / slabs. + Shaft access panels are 2 hour Fite rated and smoke resistant. + Instalation of Pressurizaton fans and Fir rated ducting. + Installation of Celing access panes for Fre Dampers & Flushing valves. + Provision of updated "Cause and effect Matix chart + Installation and Testing of Fire Fighting Over-Ridng panel, Fire and Life Safety Guide ~ CSD Revision 0 Arab Engineering Bureau lf ES Suda nb yo Controlled Copy Systems / Installations which be witnessed by QCDD (sheet 2 of 2) * Evacuation message - Sound Measurement inspection, + Instaiaton of Mimic pane's and Zone Charts on each Floor. “+ Instalation and testing of emergency phone dales on staircases to FCC. + rovsion of Ant-slip sips on starcases til Ground Floor + Installation and testing of Fie -Pll boxes with Fire Alarm, + Monitoring of Emergency diesel generator, ue tank loves of Fie pumps and Generators Fire pumps operation at FCC. + Ventilation system testing of FCC Room, + Provision of sprinklers and spares atc stock box. + Emergency exit doors to have push Lock-opaning provisions. + Waming / Signage / Tagging on -FM-200 Rooms, Manual release switch of FM-. 200, Emergency Exit signs with Fire and Life Safety Guide - CSD 5 Revision 0 = rs, esl etl guntiitiok Controlled copy Arab Engineering Bureau List of QCDD Approved Certificates required Important: + The copy of relevant UL / FM / LPCB /KiteMark etc as mentioned in the QCDD approved certificate must be available during inspection, ‘+ The model Serial numbers of Major Equipment as mentioned in the UL / FM/LPCB / KiteMark certificates shall be cross ‘checked with that mentioned on the equipment + The country of Origin must be the same as mentioned in the approved QCD certificates, + Only certified / QCDD approved weather proof devices must be used for autdoor installations. Following QCDD approved certificates with valid dates and samples of electronic devices must be made avai during inspection: * Fire Pumps and Controllers (including all accessories). + FM 200//Inergen system /Other Clean Agent systoms (including all accessories). + Fire pro system (including all accessories) + Fire and Smoke Dampers. + Fire Rated Doors. + Sprinklers. + All valves and accessories used for Water based Fire Protection System. + Landing Valves, ZCVs, Breeching Inlets, NRVs, FHRs and accessories. + Fire Extinguishers. + Smoke evacuation Fans (300 Deg @ 2 Hours). + Fire Rated ventilation fans for various Ptant Rooms. + Tunnel Car-park Ventiaton Fans (300 Deg @ 2 Hours). + Pressurization Fans, (300 Deg @ 2 Hours if instaled inside the building) + Fire Stop Sealants. + Equipment and devices used in Fire Alarm System. + Fire Rated Access Panels on Service Shafts + Duct smoke detectors. + Fite rated Cables. * Fire Rated Doors, Hinges and Push Bers. Fire and Life Safety Guide ~CsD Revision 0 [ofl uate yess us uso = Oe ce eeiiehe eee Controlled Copy Fire Pump Room — Installations Check list (sheet oF2) |s.No| Check Points Yes/ No 1 [als Dampers, fans and Door are 2 hous Fire Rated 2_ [At wall openings! gaps are sealed wit passive Fie sealants / aerial ini [Room is adequately lluminated and provided for access bridges / pathway with inkmum cleared working widh cf wm 8 meters space, Room has @ 1.5 Hr Fite Rated Door and has a se closure 3 4_[lastatation of Emergency Lighting 5 6 [bcor has the label "Fre Pump Room visible from ouside, 7_[Provision ofa Floor drain inside the room. Al sensing erin nes tobe connected with main ain, [Provision of Main Pumps Bloding Drain 9_[2hours Fire Rated Room veniltion systom connected with Emergency Powers installed 10 [Fresh [Ar Ductis 2hours Fire Rated 1a eatin on Cot Paar arco 2 13 [Reon Fah Frepucier sented ee Fre Soke dleton sae snl SL a4 [Insta cont Ei desl Pars ro en Ged Finks 15. [Provision Tachometer use and seas marking on sats SS 26 [instalation of PN. 17_PPresbure Gau a 0 [ii ol Fi sion ha Calirson scars Caren i: ‘Blocking on 90° Pipe Bends, The nearest distance of pump suction fl pb dan 13 [ins omatc Pressure e lo ary elbow / Teo shal be 20 Red 21_[ldenication Tagging of Valves and accessories 22_[Tampet Supenisory suites on 0,SRY Vaves with Breakable Latch locks 23 [Insta iaton of Contol Panels wih reference markings 24 |Use of Copper St ste! pias connecting to Contes 25, [System field doves connections tothe Control Panale 26 [Placement of Laminated System Pressure Seting Chart on Contller Panes 27_ [Placement f Field Acceptance Test por copy onthe Main Door. 28 [Provision of Pump casing release valve eccentric and concentcrecuoer, Ar release valves. 29 [Every purp, including the jockey pure, has its own controllers connected with individual pressure sensing lines tapped [rom fscharge side between Check Valve and contol valve. [The pressure sensing ines shal be brass, copper ox series 300 staness steppe and the ting shall be Yeinch (15mm) nominal size En There should be two check valves installed in he pressure sensing neat east 511.52 m) apart witha nominal (2.8 in) hole riled in clzper to serve as dampening, Pressure Sensing lines tobe poleced for possible damage. 32 _[Ensure thatthe diesel tank outlets higher te tenoohedten suo pou etep onatgiongine '33_ [Batteries piaoed on wood | Racks. Dot keep the batteries Mdoesion O A) Muianyesiin yyotitson Controlled Copy Maes ‘rab Engineering Bureau Fire Pump Room — Installations Check list (sheet 2 0f2 'S.No| Check Points Yes/ No '34_|s the fow meter instaled corectiy? (20 ~ 50 Gita) 35_[Forbatery charger connection use 6 mm square wie and for ther connection use 2.3 mm square wire, 36,_[Are the conta incoming (120 (240) volt power and ground connected tothe cenrller incoming ine teninals? [oiesel Day tanks UL sted and has overfiling prevention dovce, Capacily marking and Level gauge, Fuel Supply spe is Jeauipped wit Lock-stiel valve (Normaly open poston) return ie is without any valve, non galvanized (SS or Copper) nett and painted brown color & marked wih dreconal arrows end labeled, Vent Pipe cults terminaled cusice he buiaing lest 1.5m away fom any building opening and 3.6 meters above Ground leva, has a bund wall of 120% of 37_|tenk capacity [rater tenk has 2 equal compartments connected with a balancing vale, has supol pipe of size same as Kahraama| Jpinetine and fow suficient to fl rom empty to Flin 8 hows max. Overton pipe is ce size higher then the inlet pipe & train pipe size is min 60 mm, Effective capacity is permanently marked onthe tank mith mim. 100 mm sized leters| hcang craton hash ater conus pipe A IRV Alam ce | oes down to 25% ois ul capcty, open oes have inset cen, Prov of Vl alr el ctor 38_[romnoncombustive material wer oss, csconned, al si of phase, Low rales connected ta altemat for monitor 39_|manval switch st co eleven coi pats upg rennet Grd Ear a [aan is insted ened located athe extemal seo the bling I 42 _ [Dies aut Pipes insilalith aoe sist 23 [Fie Pump shaft alignment report is avalabie [Fe Puro am sod wih 2ay muri geen comand @FOE [At contcl valves / OSRY Vaives ae either provided with supervisory swiches OR Strapped and Palocked in Open| 45 [positon to avoid tempering Fire and Life Safety Guide ~ CSD Revision 0 S| aensianetian yyarnases == ao Engineering Bureau Aerosol System — Installation Check list Controlled Copy ‘S.No Check Points Yes/ No Pyrogen based Aerosol system isnot aceplable by QCD. Verity an confi 2__[xioguisher caries efcoretcapacty and quanites erent 2 anioes have sites nstalaton & Expy dato visible tom down [Abr switchis insta ns the eam win 1.5 meter ditnce fom et door [Abert swich has ‘push-ao reles"for Delay function ery and ot to bo‘ push ok pe 6 Max distance botvon two Abo svichos is 32 mots fr each protected area |A‘Dis-connect Swit’ is frovided to interrupt the releasing crc. Max. distance considered between each detector is 9 meters coverage strove Lights, Only MICC or Fite Rated cables ar usod. Ilnoraced th Mah Pe [AILAC units shuts down in the event of first, erm actuation 17_ [Remote LED indicators 2 insialed with Trench! above cong installations sx _|Contol panel and other davies installed inthe open to sky areas are weatherproof type. 12 _|Lsbeting for al nstalaions ke Conte panes, Alarm bel, strobe hts. Switches, onthe doots ete is provided. 20 | The centralized Control panel is connected to he building FAC? for indications of Alam, Fault & Gas Discharge, zoning labeled chats provided inside the Contol Panels, [A compete soquence of Operation dlaling all Alam devices, shuldown funelons Remote signaling, damper operation, time delay and agontaischarge for each zone / system's availa. Fire and Life Safety Guide — CSD Revision 0 2 [| tuatanysstyyancitos Controlled Copy LF s[ES cctatnceragtiens Clean Agent System — Installation Check list S.No Check Points Yes/No [Clean agent Cylinders of correct capacity and quanitios are installed 2 [Clean agent Cyinders have stickers of Insalaion & Exply dates, Capactes ec [Abort switch sisted inside the rom wihin 1.5 meter distance near exit doar -«__|Abcrt swich has ‘push-ato release’ buton and not push lock type bution, [Max cistance between two Abort sitches i 32 meters for each rotated area, «¢ __|Max. stance considered betwoon each doloctor is 9 meters coverage [Manual Discharge switch is insted ouside the protected room near each ext door and labeled as ‘Manual Gas 1 [release Staion * 12 | rote Lights, lam sounders are installed and ae functional 2 [Only MIC or Fire Rated cables are used. | 1 [Corr Panels ere provided wih Bator batkup installed within, nurinated wang Sgrage te sated ing an buts of he room "DO NOT i, ) 1 estat 2d” EVACUATENOW- GAS p concrete 22__|Azoning labeled chat of he connected /servd are i provided inside the Contil Panels ‘2 [Manual Mechanism means of discharging the agent is provided on the storage container. :2__ | Peak pressure calculation report pertaining to Max. pressure the room walls can wihstandis avaiable, | Alow level Gas indicator and Alam in Clean-agon systom shal be provided, 24 _ [Testing and Commissioning report and Room inegtty test repos ae avaiable 25__[Batery Celeuations and Hyérauic Celoulatons forthe Ping as per the sometic onan approved software are done [A completo soquonce of Operation detling al Alarm devices, shuldown funcions Remote signaling, damper = _[operation, time delay and agent discharge for each zone /systemis aval, 2 _|A ‘Disconnect Swit is provided to interup the releasing circu, Fire and Life Safety Guide — CSD Revision 0 10 SUC fmlSem UI NOUN STASI @aye) neaing Suseuisug qeay POST ISS rregoN nerearéyp = | — “AlopD1OqHy pajsi| Ne SEX eer tat eee ase NES e Cette Etta SN St OCC ais so yes mel Renee vy OLeleyrerte fi mn Pees oe mT ny Lhe) hod eheeModdl oko) Lee AELNESO CoM oh UF KeY BCMA DIF M LokeH] X=) EES Foe CoM Colley] [oye aN SH RE Se) Biel MOY BEY oN NS Le MeL INS So SPENT Cle) COWS ST as TLL Ree Rn nrc Meee aun Seat hy cal Of WW S101 P2}D30] 92!A9p Bul dojun jpnUDW YIM paddinba aq ||DYys sioog JyDUWOInY Te) SUS ne un ey po OM eon RMSE C. Wes SoX IS) MACE DoE -PIEB Co UC MTT MID: Foxe) UWA Losey tol Cod LM RSTeXeYa Rey Tole A Nia oeSed er ney) SS ot Sl kes aa ese CLT ett wey: Cate Kelsey nse eR Msn) ¢ oye SIE MUM ASSdSE BoM Col STII TMUI ETE Yo lo EYTTURS (oY 3 ll as (GUE Pasi eyo] pub pedoiddd up Jo sjaqn| uoyDyWUap! pud B>2!Aep Bulsoj> jjas YIM A[quiasso LVS} Ts) STN SEA SoC CL IT Nt) eve Bt one v SOC vette hi gee a = ie ETO PN ee eT eer UP CS SC i sere ar O} SJOUILUID} JSNU SPUD UJIM SEpIs Yjog UO siIbIpUDY YIM PaplAcid aq OJ sasDoIIDIS ~ WAIT ERCP Ko uso) eee ei mon SEM WA nt ciel CVT mie Pou Lor eon ect Senet i tocc selene sh DS aS E OST ISTO ryTHON jeremy = | rs] Le T MU TOC LOO Me Lol CSM LtT| [LSM S31 oF MUMS E-U] Xe Mt SokoloME=Yo tT 1oYq Be] Fm Ron Sonor nyn Gee reC rnin Lesbo MCE OMY P AleLodt Les) COMP ID uNtod To CULSUO NOL Holt EMS [UIT eI oF ELe UT ote BYTE mS SS TEM ee) CUTTS TITo (oleic) oll kJ Lo LULTE-)[o opi leks Ce Le Toll IMC UM elakeyltTisse eo roye) EAULTOSIE mas Bs To ial SPCR ELT BLES eC w ori Premera Rt naalt) eet MLC ToL ES MoM aM ox) ol Node aXe BULTEO MS foXeNI Malou UT EFS CRYSIIT oo Tae HK aN Prey SUL TMP CCR MMe rene FOR a occ Mare erie Boe aN oR Rt aot att RC else ete eect tm oie Poe eee oe a ek ethene mn BITE Tele uleuies [eLeLa =) (al¥ eo MeL eu Uo o)o1° [oY > wa | SUCHE NS=iUiNoun penny) MSN Gore) neaing Sujeeuisuy qery POST pest UOMO SLs ON ATOM Eerste eh st otc nen eet: Rae / TENCE Sey COTE MUL Me Gn ee SES Ten ital seers eet home Per ry Ae on Sas UNA Eee etm Tey, WTI leit eo tel tees UN Ml ox NesTe lel Meleroro MT iniW ox) INN IYe Modis XoXo] Tesi ahd “uoyD50} SS TONY MU EER ue TAS ets ert ESNet Cane PT nyt Seer eer ky ROY TUES =ST- BE) To ESOL Too Bolle e-Le KS EYL oY MU ToS a} [oleloM XMS To) bor-Te Lit] BEIT bey ST ete NCSU Le eR LM Lyme. CueIN IT: aT Re eT CTe 2q jsnu ZW |g Bulpaa xe swioo! pup Wajsks UOHD249qG-O;NY YPM paplAoid aq ysnw ACE Moll SS Foo Ml Cost MUNCoLod [oko TELE MAA CoLoy BW ULoND MME) oH] ope) SUCCES oy oS Toyde) ihre neoing Suusauidug gery — [REE EST To BM MOS PR nN Per) Tell Talay CEM e el Ullal ae oe TEC MUL Mol LSC KAM aero Ty ae | SEEEEESSUDDnnnIrnennreemmmmrr=rry=esey—oe-ererceereree ore rae | RISE eee OSC EN eMC cesT iy] eee ke een ele es ecemaNde MSE Mes Jolt Mod odanae OE RIT MU CNTY CesT Sty el mg ELT Ore eRe y te ee seen ese eEEe NT EMC ois iT man “Gd58 ©} payiwuqns pub poindaid oj oda: juswiubyp yous dung any Bo eSB ont T ya Byes e) O} SOSIASP UJI POH! 9g ||DYS UD} Sy Oju! sBuIUSdo Jayjo pup sadid yuatudinba CToINEUC oN Dot W ox Xelel lok Molo Lola Vel MU Teelele IVT EYE) SH JO %SZ payopal UM ehofs lok yu AEM e RIT MUt DAML sad TESTA oho} Teli LeU EMUU Le) ha DAC) BAe) Ih AS Sere SUP oy Mist een CN ietisen lls) Ty Bee TST MeL Kes BU Teed tLe MALOU (LoS RSE ECUTMCOYE-IU MSI UIT Peon Tol ToS he N SS RT eee STINT ede) Lele by oY LMT TM ot) TNSTs Bee Rod LTT MC CoNT Tatas TTT x = = TSE eM No B oR Te Mol eer USOT ToT tela aPC NCS ee on Ise FT ee POU Ty este Toit st Se Su Rye Tey a qq AES eR Ae Lod McLeod Lod AUS UOLE CoM STaT Coy eUTEYU SLU ot: BN eS ee poser ACOA ee nl seer at Rey SEMA y et Pitney) Siete] SSCP aoa RUE CCE Eurail eal aT Gye M toe erect Soh mnN Suenmoen UMOUD) SIV) 7 UNS) alexe) neeing Suuseusug qeay OSTA rete Bee orate mtr st rem neh ee et Ber et eee OPEL SU too WAN tt koe torte lame WT oet tin Tico it ty nN _——— oO ea rae ron atin eal et enone mae ee BLT NS tis | omic pee m ats CSTV eS [od bordel TLC ML MM em Loy BTS Cm MCR OMT Tse em tote ite aaa ses Poo Ese airy sr ise Ie ern atts ee eu Sun hoe Per oie hl st Cuno Eres Toye smn ——————————— BS APSR METRES EY CMY LCe) oT LULA EY LoS IEOLO) EMCO LUNI MSU LoL tN IN CRSP CCP eC NTN TEIN CENT MCN: a Ed COUT EO ROT MOC inches cane tne cnt DLO ret Ena Lee eee es aE aaa Famer ese Sytem try CINE INT EST So AW STN INodTo ll MA Ce Ley LAC ok] tLe 9) BAS oLol oN be P=NI TW Codey 9 Fell osT UL) Seg RUAN aT ate ela ee retin srt ttsr tia ma | SUOTD MISE UNSURE TIT VeN mame: neeing Suneeulsuq qeay aa | OST rstS prrgeN ipercaréy = | Pike noceck cr nonecha a one eee = SS SUES SESE Ne Pee es Syn be REE Ys [elo eI hese eM] ood oK-Le BILL EU Tec oll oso LULU CoM NUIT EST OS z = PREM om geri Ment Neon bieetbiceate beth Liste EA AMR LOOSE Coo Ue) LAL Cea -Le Ml Lest eT RYE CM TSE Le (OM ( TULUM os Ese LIEN Lox] MUM oT ICS CC MLe Tel EST eYoy] TUT bolo} IB Cod Toe MN — ————_._— ———Ee ees ESeDrno oer NNT ue RUM Cn oT LYM YN Loe MO eM Leb itt Sedig “10J019U95 Auebiewy pud sduind auly 105 syuD} App jasaig - sa TRO Se aR oy} UCR NL SCALAN UC ERS Ra ACC netCn Sa TCO Ie Ren LYN sete eis La. Re eS ene Caney pean ey rl MET Ce ECL rte ib pothw etcetera ey ean SET ESN ee bo een eM Ene Poe Erne ESreren) Lice i cated ial a eee Oe OEM [LoL od eS aE LUI Lew CoM Coll oYACSIEMT RC Volt Lol Ete Neh Aa Eee nein nce h cy 40 UOHD|NWNDSD OY} jUSAaId PUD AldyDq ayy Woy pay!Us saspd Jo UOYDIUSA eI ely RAM Ly SEY Lok: WAR LoS M tT RLe ROM CaLIbe) Miele Tey, Seles aa Bn ue ees) STUN ELD CoSTO MDE Mod el Tare Bios MC AUTINL SLUT e VIE IE-YTo [Cob TOMA PoloL ode) TTT ATVUT LTT | SuCHainoSn UMOU SI, MON Gao neaing Supsaurguq ges as ae Soe Picky ier) PSEC CoP emo serene STE) bike ate to Leo IA eee TUAW STC Le [loll SAE eI CT LU peo Me TOT oT] SS) (e ls Re EN eT oe SPU eel Sec Moe w ers Iey Tey |} Lee IIT) fe Merced Stoll [oli kel oder MALo BEY NL TTT] Se ITU ITE Bods fod] EN EUCCLSE CRITE BREST ACLU EM LULL PMT BEET MONT] P2}D50] Bq jou pjnoys siojoajoq ,~ PEERS Se Sew ESS eae Tec Oe pe wm ene Ce Ia FE ec a ese ena aT Ieee lel rental rece eat a Coot Se aoe eect cake ma ESP Senn ss oer Seco RLS I Lele Lo] eels Be [ode Mok sL ole MIT] oT NE Loa y WA Se TT ETE a UM een OM el aoe Koen an Cae ZT EUR RP ORO sich SB Celol Eel Ie RT tode) | LU) RoE BSC MOEN ROME el ots] ju ayy 4 = EU tice ae eae KboloRON SC ne Retin Sete) OLS Te Rte on cree Perey ete petits et iesictae RSG an mE nre Scuc er TENT] CoS oe GLY Ble LoM sol (er CM ait iri seen ot tie et ae team BUSCH ASE RTT I ELIE MLR Ie Lon Nol oe Tg ao lon ReLe Revie A Coral aceeyy

You might also like