You are on page 1of 5
a OIL AND NATURAL GAS CORPORATION LTD ‘Mehsana Asset, Elites KOM Bhawan, Palevasana Mehsana-384003, Gujarat, India Fax No,0094 27% 25705, File Ref,_NO. MHWHSE/EG-Drig/ Daie: 08-05-2010, To: “The Chief Conservator of Forests (Wester Zone), Ministy of Environment & Forests, Regional Offics, E-5, Arera Colony, Link Road -3, Bhopal 462016, MP. ‘Sub: Six monthly compliance to Environmental clearance (EC) for Development driling f 157 Nos. of development wells in Mehsana Assets. Ref : EG No, F. No, J-11011/106212007-1A I (I), dated 01/04/2009 (Copy enclosed) Sic Reference is invited to the above Environment Clearance (EC) for Development ailing ‘of 157 Nos. of wells to he dilled / already dilled from 2007- 2011 al Mi area. Environment clearance has been given by Ministy of Environment and Forest to the above project under provisions of EIA notification, 2006, ‘Accordingly item wise compliance report has been listed below for the period ending 30" Maret 2040. |, SPECIFIC CONDITIONS: “st EC Conditions [Ration & compliance No. ‘stateme | [1 [ie company “sar ‘paycompensaien fr | ONGC pays compensation fr | acquisition of private land as par the Central | acquisition of prnvate land as per Governmentstate Government’ norms. The | central state Government ‘compensation to be psd tothe land loser shall net | norms. The compensation as por be less than the nosmlpackage a por the Policy | the policy on National | [on “National Resettiment and” Rehabitation | Resettlement and Rehabiltation | Rutes, 2007 Rules, 2007 is not applicable to i | | once + 7 ony ¥ hy lsposal of sold waste, dil culting and dling | provided fr collecting cil ‘lds for onshore ding operation notified vide | culings & waste water. _| GSR546 (E} dated 30° August, 2005. | cde W | The surface facities shall bo in ‘Siirface faites prepared as per Dpplienble codes. and standards, intemational | appleable Coda! Standara | practices ad applcabe local regulations. jms “The top col removed shal bo stacked separately for reuse during restoration process, ‘ofthe land. The restoration shall | toed as per the guido line_ | Monitoring of HC concentration | cand pon | fs | Ne. | data subnitied to te » “EE Conditions (Control Board | Diling waste water including di cutings wash | water shall be callacted In dsposal pit lined with HDPE ting evaporated or treated and shal comply with the lied standards for onshore ‘disposal. The merrbership of common TSDF shal be oblained for th disposal of dil cultngs and hazardous waste. Otherwise secured land fit shal be created atthe ae with the Authorization ofthe State Poluion Conttol Board, The design of the secured shall be approved by the State Polation (Control Board. Ration & compliance — nt finiy and State Polttion | methanatea HC cared out and paramaters are within permissible mits Diiling waste water including at cuttings wash water is collecied In disposal pit tned with | impervious lining, The waste water is. tesled! analyzed to fecertain the qually and ‘cordingly action is taken for disposal ie. evaporation! treatment Wi “The recyelable waele (oly sage) and spark ol hall be disposed tthe authorized recycler. ‘Spent alle bolng sent authorized recyeers through MSTC Baroda, vi Only water based dling mud shal be used, The dling mud shal 96 racycied; In case of use of synthetic of based mud due fo any problem due to {eological formation for dling, tow toxicity, Ol Based Mud (OBM) naving aromatie content <1 % shall be used. Iii intended to use such OBMSEM to. mitigate specie hole problem, it ‘Should be intimated o Minstry of Environment and Forest Stats Poluion Control Boar. ‘Guianities ofstoraye and chemicals and adalives ‘required for dling mul preparaton shall be below the. speciied threshold for spectied storage permitted under the MSIHC Rules. ‘Only water based ud system is being used for driling