Hasil Kegiatan PT. Laman Mining

The document presents results from activities at PT. Laman Mining in three tables: Table 1 shows cycle time data for loading equipment at Work Post 1. Table 2 shows transport time data for dump trucks between the mining front and washing plant. Table 3 shows unwashed bauxite material throughput rates and tons for March at Washing Plant 5.

Uploaded by

Mega wati
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views4 pages

Hasil Kegiatan PT. Laman Mining

The document presents results from activities at PT. Laman Mining in three tables: Table 1 shows cycle time data for loading equipment at Work Post 1. Table 2 shows transport time data for dump trucks between the mining front and washing plant. Table 3 shows unwashed bauxite material throughput rates and tons for March at Washing Plant 5.

Uploaded by

Mega wati
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

BAB IV

4.2 Hasil kegiatan

Adapun hasil kegiatan di PT. Laman Mining adalah sebagai berikut, lihat Tabel
4.1, Tabel 4.2, Tabel 4.3
Tabel 4.1 Data Pengamatan Cycle Time Alat Loading di WP 1 dengan Dump
Truck PT. PKM pada front
ExcavatorDoosan DX 200A
Digging Loaded Swing Dumping Empty Swing
No
(detik) (detik) (detik) (detik)
1 5,66 3,96 2,76 4,9
2 3,6 3,74 2,93 4,92
3 4,13 4,19 2,45 3,89
4 3,33 3,5 1,98 4,72
5 5,9 3,51 2,35 5,51
6 3,78 4,37 2,9 4,32
7 4,02 3,,95 2,70 4,34
8 6,06 4,27 2,28 13,48
9 3,57 3,09 2,20 12,47
10 4,63 3,61 2,64 4,51
11 3,53 3,75 1,71 2,69
12 4,59 3,14 2,14 2,23
13 6,65 3,88 4,57 5,97
14 2,28 2,63 2,85 2,5
15 3,93 2,9 2,69 4,23
(Sumber: pengamatan lapangan)

Tabel 4.2 Data Pengamatan Waktu Edar Alat Angkut dari Front penambangan ke
washing plant
Dump Truck
Hauling Isi Dumping Hauling Kosong Manuver
No
(detik) (detik) (detik) (detik)
1 487,5 30,6 452,81 31,47
2 478,7 29,4 473,17 33,21
3 475,61 29,8 440,2 34,73
4 479,73 29,7 459,2 36,72
5 484,64 28,7 477,66 36,42

38
6 484,37 28,14 475,96 39,86
7 517,71 30 539,69 38,52
8 527,77 25,2 490,94 39,84
9 571,29 25,7 513,17 37,12
10 587,27 28,81 510,12 35,42
11 574,17 25,66 520,08 37,63
12 578,99 27,82 554,41 31,81
13 593,51 27,05 532,66 35,28
14 572,73 29,3 477,82 34,2
15 510,2 29,39 529,12 37,32
16 519,12 32,51 488,87 39,9
17 515,38 29,38 559,71 37,83
18 551,61 34,43 513,12 38,51
19 582,63 32,61 510,19 39,85
20 512,82 33,72 520,01 37,11
21 419,11 36,12 554,45 35,41
22 511,21 26,54 532,61 37,67
23 512,41 34,11 477,83 31,84
24 481,52 35,41 529,18 35,21
25 512,24 29,86 488,88 34,24
26 498,81 31,31 559,72 38,55
27 521,44 32,95 513,11 39,83
28 491,72 34,1 510,13 37,13
29 522,81 33,22 520,01 35,43
30 521,30 33,1 522,03 37,12
(Sumber: pengamatan lapangan)

Tabel 4.3 Data Ritase Material Bauksit Belum Tercuci Bulan Maret pada Washing
Plant 5
CBX
DATE SHIFT RITASE
(Ton)
1 STANDBY
01-Mar-17
2 STANDBY
1 STANDBY
02-Mar-17
2 41 820,00
03-Mar-17 1 87 1.836,00

39
2 117 2.340,00
1 133 2.660,00
04-Mar-17
2 170 3.400,00
1 111 2.228,00
05-Mar-17
2 STANDBY
1 112 2.248,00
06-Mar-17
2 STANDBY
1 STANDBY
07-Mar-17
2 STANDBY
1 129 2.580,00
08-Mar-17
2 205 4.420,00
1 165 3.452,00
09-Mar-17
2 121 2.676,00
1 18 360,00
10-Mar-17
2 141 3.244,00
1 133 3.148,00
11-Mar-17
2 149 3.436,00
1 124 2.872,00
12-Mar-17
2 STANDBY
1 126 2.880,00
13-Mar-17
2 182 3.664,00
1 214 4.280,00
14-Mar-17
2 153 3.060,00
1 2 40,00
15-Mar-17
2 STANDBY
1 STANDBY
16-Mar-17
2 155 3.100,00
1 178 3.560,00
17-Mar-17
2 142 2.840,00
1 161 3.220,00
18-Mar-17
2 212 4.240,00
1 237 4.740,00
19-Mar-17
2 STANDBY
1 68 1.360,00
20-Mar-17
2 172 3.440,00
1 16 320,00
21-Mar-17
2 STANDBY
1 46 920,00
22-Mar-17
2 STANDBY
1 64 1.280,00
23-Mar-17
2 STANDBY
1 STANDBY
24-Mar-17
2 STANDBY
25-Mar-17 1 47 1.188,00

40
2 STANDBY
1 STANDBY
26-Mar-17
2 STANDBY
1 74 2.072,00
27-Mar-17
2 109 2.356,00
1 75 1.836,00
28-Mar-17
2 112 2.904,00
1 89 2.332,00
29-Mar-17
2 49 980,00
1 STANDBY
30-Mar-17
2 61 1.220,00
1 48 1.232,00
31-Mar-17
2 103 2.060,00
(Sumber: PT. Hasta Panca Mandiri Utama)