weancas Prmveriagatons Fen PPM. Ps (16). Prt Manageme. Forum Or
Project Management
Project Management Home Posts(1169) __Comments(3740) Search this Forum
Primavera integration to Fusion PPM
“Topi posted February 19,2019 by Re) Mananvals tagged Capital Projects, Project ling and Revenue Projet Costing, Project Management Project,
Panning and Scheduling, Project Planning, Budgeting and Forecasting
AViews 9 Comments
Primavera integration to Fusion PPM
Has anyone implemented Primavera integration to Fusion PPM using Orace Fusion Project Integration Gateway,
What's your experience? I this rea time or batch process? Have you encountered any spect issues during design and deployment?
Tm keen to know integration around project creation andl updates, tasks creation and updates, budgets creation and updates, forecasts creation and
Updates. Is it also possible to update EVM [earned value management] result to,
Reply to his Post
Average Rating deirdre sel ating | Rate
psicbutertenerconectrack comps Tatweancas Praveen Fun PPM. Pate (68) Poe Managua. Far Ore
Comment
Posted uly 3, 2019 by Mancietts Morales
‘Actions Permalink Show/Hide Replies
H
‘ia you getan answer for ths post” Is this integration with Fusion PPM Cloud, and could you share some documentation related to this
Integration?
“Thanks
Reply o this Comment
Average Rating ieee ieFe rating | Rate
Posted uy 31,2019 by Raj Momarcain Q
‘Actions Permalink
No, Lhave ot received any responses.
‘Curent we use the fie import [20] process using seeded templates.
‘There are REST AP's but we have not explored thie option as yet.
Regards
Raj
Reply o this Comment
pscbudeteneconectrack compasses TatsrainegnsontoFusten PPM. Pts (8). Pos anager. Fan rade Ca aoner Comet
Average Rating efi fei rating | Rate
Posted September 8,2019by Andy May-Coates
‘ctions Permalink
-HARoi long tie no see. believe that Oracle Fusion Project ntgraton Gateway has been deprecated by Oracle andhas baen fr ong in). eb
sericosil loaders are theory way lam aware of
Reply to this Comment
Average Rating fee ie rating | Ratelt
Posted November 6, 2019 by Ryan Waller
‘tions Permalink Show/Hide Replies
‘We would be interestec in how others have integrated Primavera P6 with Cloud Project Portoio Mangement. We have» PAAS envm place and
‘currently utlize SOA CS for any custom integration needs. Would we actually need SOR C5 or ae others abet utlize an export rom Pinto an
FDI template format?
Reply tothis Comment
Bethe rst toate this | Rate:
pe cutconaconsecarach composts ParaimayntontoFusen PPM. Po (16). Pr
Posted November, 2019 by Andy May-Coates Wh
‘tions Permalink
Wie ae integrating PS using Oracle Integration Cloud Service (OIC) vie REST services. We are integrating nt the FancllProlect
Planin PPM (as opposed tothe Execution Projet Plan in PEM), We have common resources between PS and aur PRES, an plan
by accounting perad, We rol up lower level WBS teks in Pt lowest evel facil tasks (chargeable tasks) With respect to
progress integration, race are lacking inthis space. The only webservice avaable (REST or SOAP) only allows Financial Proleet
Bian progress to be updated fran existing draft progress enty. So, we have to havea manual step to create the progress entry
fist, the P6 sends the physical percent complete. Sore related leas that we could do with being upvoted-
fSecSbasec ADFéi Excel loader for Financial Project Plan Resource Assignments
{9248890948 REST services for managing Financia Project Plan Progress
‘S485 REST services for managing Finncial Project Pans eg, Set Baseline,
FDI isuniely to work fr you 3 ts realy intended for data migration and as such any support insets iting when
considering updates tothe Financial Project Plan.
Reply to this Comment
Average Rating oer PrSratings | Ratel
Posted Jena 25,2020by Wes Urquhart &
‘Actions "Permalink
Hi andy,
Hope ais wall We're curently investigating how an interface between Ps ane PPM could work for us. In
conversations, weve outlined something incredibly similar to what you described above witha few minor
erences (¢. dterent middleware solution, leveraging @ master WBS with a project template Instead of bringing.
‘over unique tasks from P& each time ec) Just curious - do you have ay leeons leaned or advice for sameone
stil atthe beginning oftheir requirements gathering integration design? Anything you wish you wouldve done
liferenly or known from the ouset?
Thanks
Wes
psicbudeteneconecirack compose Tet araimegntonsFusen PPM. Po (16).
Reply to this Comment
Be the first toratethis | Rate ts
ptcbuderteneconectrack comps Tet
Poste Jnusty 25,2020 by Andy May-Costes Wf
‘Actions Permalink
Hives, we had 2 few constraints that made things tricky; Pé was migrated to Azure ather than
Oracle laaS/PaaS which mace the plumbing abit more complicated and our Fusion project scope /
‘duration did not induce 2 ful eview of how Pb isbeing used alongside EBS today and whether there
‘sa btter“eference architecture" / way of doing things with Fusion/P6 going forward In summary,
‘our scope was migration and nt transformation.
(One ofthe trckest things for uss that P6 isnot only being used as a project scheduling tol, but
‘also as a nancial planning tok In effet, periodic budgets an forecasts (by aecountng peieg) ate
‘reated in P6 and the perioccty needed tobe preserved in the integration (rather than eying on
Fusion to spread the assignments for us). For customers who are not interested in Eamee Value
Management, the simple solution would probably be to load straight into Fusion project budgets and
forecast, bypassing tne fnancl project plan (FPP). However, to take advantage of Fusions EVM
“capable, we need to maintain the FPP, so that hat be the integration endpoint. The APlfor the
FPP s aly base, and the application does not alow FPP assignments to be deleted othe loge to
hance thie all hac to be buitnt the mile ayer,
“The peracc nature of our source plans sso ruled out ary integration with Fusion Project Execution
Management, which was another option ie integrate with PEM and then push the PEM plan othe
Financial Project Plan within Fusion; the big advantage here i that progress sso included. On the
topic of PEM, Im also frm believer in using the mast aporoprite tel forthe ob for atleast some
‘of or projects Poi probably overland MSP woule perhaps be more suitable (and comes with
Fusion integration out of the box).
*We als send physical percent complete trom Pé to Fusion (Fusion progress reports underpinning
EVM) The current API’s basic to say the lest; it rles ona dat progress report having already been
‘created, and that can currently only be done manually!
In summary, withthe deprecation ofthe Oracle Fusion Project Integration Gateway (not tat lever
{ota chance to use it) customers are eft wth alot of head scratching and custom bull todo topticbuteteneconecirack comps
raimegntonsFusen PPM. Po (16).
make this work and each usecase wl be slightly cferent so there isno “right” answer. Jus allow
plenty of time fr dsign/buil/test/redesign/rebul.
Good luck
Andy
Please ate my response i useful
Reply this Comment
verge Rating detrei ye4 ratings | Rate
Poste November 25,2020 by abossaharkat
‘Actions Permalink
Hives,
‘We are ooking for integration between P6 and PPM,
Did you try to use Project execution and/or Resource management?
thanks anc regards
abassia
Reply this Comment
Be thefistiorateths | Rate tsraingnsontoFusten PPM. Pts 8). Pos Manager. Fan rade Cau aver Comet
Posted November 26,2020 by Andy May-Coates
‘tions Permalink
"im not sure 1 recommend ths approach. Oracle have designed PEM and integration
‘ith PFM ane Microsoft Project to only have one project scheduling too For examale,
it Preis used with MSP, MSP isthe scheduling ool. PEM and PFM are
implemented, MSP an ony be used o downoad plans create intial projet plan any
Hoving two projet scheduling tools (PEM ane PB) means there is lt of dupcate
‘capably, 0 whieh would become the master? How would you synehronise/entral
updates in both systems?’ not saying itis impossible, butt certainly add alt of
complexity.
‘Whats the alone for integrating P6 with PEM?
Cheers,
‘Andy.
Reply this Comment
Average Rating errr ie2ratings | Rate
psicbutertenerconectrack comps Tatweancas PrmaveraigntonsFuen PPM. Ps (6). Projet Manageme. Fon rie Clas CuomerConra
Post a new Comment
psicbutertenerconecirack comps Tat