You are on page 1of 4
ASCEND PLUS ELEVATOR & ESCALATOR CORPORATION Ref. No, APEEC/2016 -001, August 17, 2016 ANIDA POWER CORPORATION TECO INDUSTRIAL PARK, Ninoy Aquino Hi-way, Bo. Bundagul, Mabalacat Pampanga ATTENTION : MR. LUIS TAN SUBJECT = YUNGTAY PASSENGER ELEVATOR REPLACEMENT OF MAIN CONTROLLER TO LIWIN ELEVATOR Dear Mr. Tan, We are pleased to informed you that we have completed the replacement of main controller, testing ‘and commissioning of the above mentioned subject elevator(Refer attached checklist) dated AUG [2p 2AL 6 \n this regard, we are turning over the said equipment with the following. keys: 1, Control Panel key 2 Car operating panel 3. Card reader key for Car operating panel 4. Parking key at GF HOP The parts/equipment supllied are warranted against factory defects under normal condition of service for a period of 24 Months and preventive maintenance for Twenty Four(24) Months starting from the date of completion of workjturn over. Our free maintenance covers a once a month periodic maintenance check — up. If you have any queries/clarfication , please feel free to contact us. Thank you for kind attention and cooperation d the said works. Very Truly yours, zi Conforme By: opera E Batara Dete___ ANG. BE Bal General Manager 308 Dansalan St., Barangka Haya, Mandaluyong City Tel. No.: (02) 669-1937 (02) 984-1005 * Telefax: (02) 6560591 E-mail: Add. apeec308@yahoo.com/apeec30R@ gmail.com REPLACEMENT OF YUNGTAY ELEVATOR TO LIWIN ELEVATOR CONTROLLER LOCATION Exiting | repncea | FHRETORSTERTIMENT as [aching room [Fraction Machine with Mi SD ivemeeyener = S ok 2 [Main Controller with pare! |e 3. [eovernor/switeh — ok 4 intercom unit - ok 5 [Hoisting rope — K ‘ie HOISTWAY =| 1 |Terminal slowdown Switches 2 = ok [Bottom

You might also like