ASCEND PLUS
ELEVATOR & ESCALATOR CORPORATION
Ref. No, APEEC/2016 -001,
August 17, 2016
ANIDA POWER CORPORATION
TECO INDUSTRIAL PARK, Ninoy Aquino Hi-way,
Bo. Bundagul, Mabalacat Pampanga
ATTENTION : MR. LUIS TAN
SUBJECT = YUNGTAY PASSENGER ELEVATOR REPLACEMENT OF MAIN CONTROLLER TO LIWIN
ELEVATOR
Dear Mr. Tan,
We are pleased to informed you that we have completed the replacement of main controller, testing
‘and commissioning of the above mentioned subject elevator(Refer attached checklist) dated
AUG [2p 2AL 6 \n this regard, we are turning over the said equipment with the following. keys:
1, Control Panel key
2 Car operating panel
3. Card reader key for Car operating panel
4. Parking key at GF HOP
The parts/equipment supllied are warranted against factory defects under normal condition of service
for a period of 24 Months and preventive maintenance for Twenty Four(24) Months starting from the
date of completion of workjturn over.
Our free maintenance covers a once a month periodic maintenance check — up.
If you have any queries/clarfication , please feel free to contact us.
Thank you for kind attention and cooperation d
the said works.
Very Truly yours, zi
Conforme By: opera
E Batara Dete___ ANG. BE Bal
General Manager
308 Dansalan St., Barangka Haya, Mandaluyong City Tel. No.: (02) 669-1937 (02) 984-1005 * Telefax: (02) 6560591
E-mail: Add. apeec308@yahoo.com/apeec30R@ gmail.comREPLACEMENT OF YUNGTAY ELEVATOR TO LIWIN ELEVATOR CONTROLLER
LOCATION Exiting | repncea | FHRETORSTERTIMENT as
[aching room
[Fraction Machine with Mi
SD ivemeeyener = S ok
2 [Main Controller with pare! |e
3. [eovernor/switeh — ok
4 intercom unit - ok
5 [Hoisting rope — K ‘ie
HOISTWAY =|
1 |Terminal slowdown Switches 2 = ok
[Bottom