You are on page 1of 1
MV DAREEN PANAMA GRT: 12059 NRT: 4013 Safety & Quality Management Manual Document : CL:A7, CLAS _ Page: 1/1 _| Date: 30/09/2008 ‘Title: -Arrival / Departure Port Preparation Issue: 1/3 Dai Tests ‘CLiA? Arrival / Departure Port Preparation ‘THE FOLLOWING SHALL BE COMPLIED WITH AND MADE AVAILABLE BY WATCH KEEPER. + ETNETS SENT TO PILOT STATION AT APPROPRIATE TIME WITH ALL RELEVANT INFORMATION REQUIRED. + PORT INFORMATION, SAILING DIRECTIONS AND OTHER NAVIGATION INFORMATION, INCLUDING RESTRICTION ON DRAFT, SPEED ENTRY TIME etc + ALLAPPROPRIATE FLAG / LIGHT SIGNALS DISPLAYED. MINIMUM AND MAXIMUM DEPTHS OF WATER IN PORT APPROACHES, CHANNELS AND ‘AT BERTH CALCULATION. LARGE -SCALE CHARTS FOR PORT'S PILOTAGE WATER PREPARED. LATEST NAVIGATIONAL MESSAGES AND WEATHER REPORT. ‘ALL HYDROGRAPHIC PUBLICATION FULLY CORRECTED UP-TO-DATE. RADIO CHECK FOR PILOT / TUGS /BERTHING INSTRUCTION. ‘VHF CHANNELS FOR VARIOUS SERVICES NOTED. PILOT LADDAR ON CORRECT SIDE, MASTER / PILOT INFORMATION EXCHANGE FORM PREPARED ENGINES TESTED FOR SATISFACTORY OPERATION AHEAD AND ASTEARN, ‘STEERING GEAR TESTED IN PRIMARY AND SECONDARY SYSTEMS. MOORING ROPES PREPARED MOORING WINCHES TESTED, RAT GUARDS - FIRE WIRE PREPARED. HEAVING LINES OF SUFFICIENT LENGTH AVAILABLE AT EACH STATION. ‘ALL PORTABLE VHF BATTERIES CHECK FULLY CHARGED. PUBLIC ADDRESS SYSTEM (IF FITTED) TESTED AND READY FOR USE. ‘CL: AB Dally Safety Tests, ‘THE FOLLOWING SHALL BE CHECKED DAILY AT NOON BY WATCH KEEPER: WHISTLE (BUT NOT IN POOR VISIBILITY OR WHEN OTHER VESSELS ARE NEAR BY). + ALARM SIGNAL * BRIDGE TELEPHONES. * CLOCKS AND CHRONOMETERS. * BRIDGE AND ENGINE ROOM TELEGRAPHS AND REVOLUTION INDICATORS (ALSO BEFORE CANAL ‘+ STEERING SYSTEM CHANGE -OVER PROCEDURE.

You might also like