This document contains a schedule for 10 motorized fire and smoke dampers for the Ramp Sump South Portal area. It lists the tag, space served, airflow, type, and size for each damper, with most serving the Ramp Sump at 468 cubic meters per hour and 200mm in size, and two larger ones serving the MCC Room/Foam Room at 1800 cubic meters per hour and 400mm in size.
This document contains a schedule for 10 motorized fire and smoke dampers for the Ramp Sump South Portal area. It lists the tag, space served, airflow, type, and size for each damper, with most serving the Ramp Sump at 468 cubic meters per hour and 200mm in size, and two larger ones serving the MCC Room/Foam Room at 1800 cubic meters per hour and 400mm in size.
This document contains a schedule for 10 motorized fire and smoke dampers for the Ramp Sump South Portal area. It lists the tag, space served, airflow, type, and size for each damper, with most serving the Ramp Sump at 468 cubic meters per hour and 200mm in size, and two larger ones serving the MCC Room/Foam Room at 1800 cubic meters per hour and 400mm in size.