ESTIMASI BIAYA OPERASIONAL PRODUKSI ORE NICKEL ( NI : 1.

8 UP ) FOB PORT TARGET PRODUKSI 20,000 MT


MINIMUM CARGO 15,000 METRICK TON
EQUIPMENT PENDUKUNG OPERASIONAL PRODUKSI A TARGET PRODUKSI 20.000 MT
NO JENIS ALAT TYPE UNIT TAHUN JML UNIT CHARGE(RP) JAM KERJA HARI KERJA/BLN BBM/JAM BBM/BLN HRG BBM/LTR JML HARGA BBM/BLN SEWA UNIT/BLN TOTAL TOTAL US
1 BULDOZER D 85 ESS 2017 0 Rp 475,000 8 26 25 0 11,500.00 - - Rp - $ -
2 EXAVATOR PC.200 2018 4 Rp 275,000 8 26 18 14976 11,500.00 172,224,000.00 228,800,000.00 Rp 401,024,000 $ 0.93
3 DOUBLE CABIN LV.4 X 4 2018 1 Rp 20,000,000 8 26 5 1040 11,500.00 11,960,000.00 20,000,000.00 Rp 31,960,000 $ 0.07
4 DUMP TRUCK HINO 500 ti 2017 0 Rp 52,000,000 8 26 12 0 11,500.00 - - Rp - $ -
16016
JUMLAH 184,184,000 0
JUMLAH 248,800,000.00 1
TOTAL JUMLAH 432,984,000.00 $ 1.01
ANALISA BIAYA PENDUKUNG B
1 BASSE CAMP 1 Rp 7,000,000 7,000,000.00 Rp 7,000,000 0.02
2 ATK PC.LAPTOP DLL 1 Rp 25,000,000 Rp 25,000,000 0.06
3 APD 1 Rp 25,000,000 Rp 25,000,000 0.06
4 PREPARASI SKOP JIS 1 Rp 25,000,000 Rp 25,000,000 $ 0.06
JUMLAH 7,000,000.00
TOTAL JUMLAH 82,000,000.00 0.13
ANALISA EMFLOYMENT C
NO POSISI/JABATAN JUMLAH SALLARY/ BULAN TOTAL SALLARY TOTAL US ( $ )
1 SITE MANAGER 0 Rp 25,000,000.00 Rp - $ -
2 KEPALA PRODUKSI 1 Rp 15,000,000.00 Rp 15,000,000 $ 0.03
3 GEOLOGI 1 Rp 10,000,000.00 Rp 10,000,000 $ 0.02
4 HRD/ADMINISTRASI 1 Rp 6,000,000.00 Rp 6,000,000 $ 0.01
5 HEAD PREPARATION 1 Rp 8,000,000.00 Rp 8,000,000 $ 0.02
6 MINE ENGINER 0 Rp 6,500,000.00 Rp - $ -
7 HUMAS 1 Rp 7,000,000.00 Rp 7,000,000 $ 0.02
8 DRIVER LV 4 X 4 1 Rp 4,500,000.00 Rp 4,500,000 $ 0.01
9 CREW SAMPLER 2 Rp 4,000,000.00 Rp 8,000,000 $ 0.02
10 CREW BBM 2 Rp 4,000,000.00 Rp 8,000,000 $ 0.02
11 CREW PREPARATION 4 Rp 4,000,000.00 Rp 16,000,000 $ 0.04
12 SECURITY 2 Rp 3,000,000.00 Rp 6,000,000 $ 0.01
13 STOCKER 2 Rp 4,000,000.00 Rp 8,000,000 $ 0.02
JUMLAH 18
JUMLAH SALLARY / BULAN Rp 96,500,000 $ 0.22
ANALISA BIAYA KONSUMSI D
NO JENIS MAKANAN SATUAN HARI KERJA HARGA SATUAN / KOTAK JUMLAH HARGA TOTAL US ( $ )
1 NASI KOTAK 25 30 20,000.00 Rp 30,000,000.00 $ 0.07
2 AIR GALON 5 30 5,000.00 Rp 750,000.00 $ 0.00
3 KOPI + THE 25 30 5,000.00 Rp 7,500,000.00 $ 0.02
JUMLAH 30,000.00
TOTAL JUMLAH Rp 38,250,000 $ 0.09

REKAPITULASI ESTIMASI ANALISA BIAYA OPERASIONAL PRODUKSI


NO ITEM ESTIMASI BIAYA ( RP ) ESTIMASI BIAYA ( US )
1 EQUIPMENT OPERASIONAL PRODUKSI ( A ) Rp 432,984,000 $ 1.01
2 ANALISA BIAYA PENDUKUNG ( B ) Rp 82,000,000 $ 0.13
3 ANALISA EMFLOYMENT ( C ) Rp 96,500,000 $ 0.22
4 ANALISA BIAYA KONSUMSI ( D ) Rp 38,250,000 $ 0.09
5 ANALISA BIAYA TAK TERDUGA/DANA TAKTIS ( E ) Rp 50,000,000 $ 0.12
JUMLAH ESTIMASI BIAYA ( RP ) Rp 699,734,000
JUMLAH ESTIMASI BIAYA ( US ) $ 1.63

BIAYA BERBANDING PRODUKSI ORE NICKEL ( 20.000 MT ) FOB PORT AA


NO TARGET PRODUKSI ORE NICKEL PER BULAN BIAYA OPERASIONAL PRODUKSI PER BULAN METRICK TON ( MIN ) US ( $ ) / MT

1 20.000 METRICK TON 699,734,000 15,000 $ 3.33


DI BULATKAN $ 4.00