Professional Documents
Culture Documents
1
GALIAN : 0.00 m²
EXCAVATION
TIMBUNAN 1429
: 0.00 m²
EMBANKMENT
KUPASAN 1425
: 0.00 m²
STRIPING
G. RUMPUT 1420
: 0.00 m
SOD FACING
1415
Bidang Persamaan
Reference Level1410
1407.00
1419.849
1420.536
1421.521
1421.121
1422.452
1421.758
1419.886
1418.549
1418.797
1416.677
1412.442
1411.110
1411.236
1412.490
1417.218
1420.089
1420.989
1420.820
1424.392
1426.111
1428.807
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
2.96
2.24
4.56
4.58
4.03
53.54 46.98 18.51 7.05 17.33 14.55 15.84 11.44 5.58 9.04 8.90 25.83 57.74 24.79 26.85
DISTANCE (m)