You are on page 1of 1
Saud Aramco te dezan Ray Projets Dopaiment Fa (0863) 8457272 (088 17)318:3100 &agoul 940) ie Tekeram Bsen i RPM Ste On Bayh saudi aramco ‘Saul Abia. April 2, 2018 NTED.N-L-on00rt8 DOCUMENTS REVIEW RESULT Ret Ns IP RTEPSAL SITE SAPUT TTT Mr. A. Saad, Contractor Representative Petrofac Saudi Arabia Limited Tol 810-1222 Fax 814-6017 “The results of our review for the document received under the referenced transmittal dated January 30, 2018 are as folows: tem | DocumentNo. | Rev. Document Title/Description Result Remark Please note this is a repetitive issue with AVK, and this may lead to incompatibility ‘concems in future supplies. For this project, the corrective actions taken by AVK to Insure ‘compatibiliy with ASME flanges can be accepted. Nonetheless, Vendor needs to confirm that these flanges are in full compliance with all other MSAERs. Moreover, AVK needs to send a compliance letter for a preventive action to insure prevention of re-occurrence of this type of deficiency. Thea “AE epi ih ae ieaaed ‘Company comments do not relieve Contractor from ful compllance with Company Standards and Project Specifications. Regards, Ww SS GHA, Copan Ra Seeeonesh nator Suen en. cnr rmometmine Ye] mE) Si Aras: Company Genel Ue

You might also like