NTED.N-L-on00rt8
DOCUMENTS REVIEW RESULT
Ret Ns IP RTEPSAL SITE SAPUT TTT
Mr. A. Saad, Contractor Representative
Petrofac Saudi Arabia Limited
Tol 810-1222
Fax 814-6017
“The results of our review for the document received under the referenced transmittal dated January 30,
2018 are as folows:
tem | DocumentNo. | Rev. Document Title/Description Result
Remark
Please note this is a repetitive issue with AVK, and this may lead to incompatibility
‘concems in future supplies. For this project, the corrective actions taken by AVK to Insure
‘compatibiliy with ASME flanges can be accepted. Nonetheless, Vendor needs to confirm
that these flanges are in full compliance with all other MSAERs. Moreover, AVK needs to
send a compliance letter for a preventive action to insure prevention of re-occurrence of
this type of deficiency.
Thea “AE epi ih ae ieaaed
‘Company comments do not relieve Contractor from ful compllance with Company Standards and Project
Specifications.