This document is a bill for pile breaking work done at the Puneet Edifice building. It provides details of 126 piles that were broken on one side, including the pile number, height from road level to pile top, and chipping depth. It also details 26 piles that were broken on both sides, with the same information. The total chipping measured is 168.151 cubic meters for the one sided piles and 38.37 cubic meters for the two sided piles. The contractor, site location and date are provided at the top.
This document is a bill for pile breaking work done at the Puneet Edifice building. It provides details of 126 piles that were broken on one side, including the pile number, height from road level to pile top, and chipping depth. It also details 26 piles that were broken on both sides, with the same information. The total chipping measured is 168.151 cubic meters for the one sided piles and 38.37 cubic meters for the two sided piles. The contractor, site location and date are provided at the top.
This document is a bill for pile breaking work done at the Puneet Edifice building. It provides details of 126 piles that were broken on one side, including the pile number, height from road level to pile top, and chipping depth. It also details 26 piles that were broken on both sides, with the same information. The total chipping measured is 168.151 cubic meters for the one sided piles and 38.37 cubic meters for the two sided piles. The contractor, site location and date are provided at the top.