Software Engineering

Online bits (Unit- 5)


Q. Level Question A B C D E Answer
NO
1 What does RAD stand for? B
Rapid Rapid Relative Rapid
Application Application Applicatio Applica
Document Development n Design tion
Design

2 Which of the following Potential Technical Analysi B


threatens the quality and Business risks Risks s Risks
timeliness of the produced risks
software?

3 Which of the following is COCOMO FP-based Both Process C


used to predict the effort as estimation COCOMO -based
a function of LOC or FP? and FP- estimati
based on
estimation
4 Which of the following is an Change System Internship Version C
incorrect activity for the management management manageme manage
configuration management nt ment
of a software system?
5 This set of Software  Keeping Delivering Maintainin Avoidi D
Engineering Multiple overall costs the software g a happy ng
Choice Questions & within budget to the and well- custom
Answers (MCQs) focuses customer at functionin er
on “Project Management”. the agreed g complai
time developme nts
nt team
6 Which of the following is Specification Product Testing Staff C
not considered as a risk in delays competition turnove
project management? r
The process each manager Project Manager life Project Process C
follows during the life of a Management cycle Managem Manage
project is known as ent Life ment
Cycle Life
7 Cycle
8 A 66.6% risk is considered very low low moderate high D
as
9 Which of the following travel and hardware and effort all of D
is/are main parameters that training costs software costs (the the
you should use when costs costs of mentio
computing the costs of a paying ned
software development software
Software Engineering
Online bits (Unit- 5)
project? engineers
and
manager)
10 Quality planning is the team project customers project B
process of developing a manage
quality plan for r
11 Which of the following is an Project size Planning Project Degree A
important factor that can process complexit of
affect the accuracy and y structur
efficacy of estimates? al
uncertai
nty
12 A number of independent JAD CLASS FAST None C
investigators have of the
developed a team-oriented mentio
approach to requirements ned
gathering that can be
applied to establish the
scope of a project called
a) JAD
b) CLASS
c) FAST
d) None of the mentioned
13 Which of the following are Hardware Effort costs Travel and All D
parameters involved in and software training
computing the total cost of a costs costs
software development
project?
14 Which of the following  Costs of Costs of Costs of Costs C
costs is not part of the total networking providing lunch time of
effort cost? and heating and food support
communicati lighting staff
ons office space

15 What is related to the Function- Product- Size- None A


overall functionality of the related related related of the
delivered software? metrics metrics metrics mentio
mentioned ned
16 A _________ is developed Algorithmic Expert Estimation Parkins A
using historical cost cost judgment by analogy on’s
information that relates modelling Law
some software metric to the
project cost.
17 What all has to be identified Threats Vulnerabilitie Conseque All of D
as per risk identification? s nces the
mentio
Software Engineering
Online bits (Unit- 5)
ned
18 Which technique is Algorithmic Expert Estimation Parkins C
applicable when other cost judgement by analogy on’s
projects in the same analogy modelling Law
application domain have
been completed?
19 Which one is not a risk Risk Risk Risk Risk B
management activity? assessment generation control Manage

20 What is the product of the Risk Risk Risk All of A


probability of incurring a exposure prioritization analysis the
loss due to the risk and the mentio
potential magnitude of that ned
loss?

21 What threatens the quality Known risks Business Project Technic D


and timeliness of the risks risks al risks
software to be produced?

What threatens the viability Known risks Business Project Technic B


22 of the software to be built? risks risks al risks

23 Which risks are associated Business Process Product Develo C


with the overall size of the impact risks definition size risks pment
software to be built or risks environ
modified? ment
risks
24 Which of the following term Staff Technology Managem Product C
is best defined by the turnover change ent change competi
statement: “There will be a tion
change of organizational
management with different
priorities.”?

25 Which of the following risks Managerial Technology Estimation Organiz B


are derived from the risks risks risks ational
software or hardware risks
technologies that are used to
develop the system?

26 Which of the following Change Version System Release A


process is concerned with management management building manage
analyzing the costs and ment
Software Engineering
Online bits (Unit- 5)
benefits of proposed
changes?

27 Which of the following is a Version Code line Baseline None B


collection of component of the
versions that make up a mentio
system? ned

28 PM-CMM stands for people process product project A


management management manageme manage
capability capability nt ment
maturity maturity capability capabili
model model maturity ty
model maturit
y
model
29 A software ________ people product process none of C
provides the framework the
from which a mentio
comprehensive plan for ned
software development can
be established.
Who delivers the technical Practitioners Project Senior All A
skills that are necessary to managers managers
engineer a product or an
application?
30
31  Which of the following is Keeping Delivering  Maintaini Avoidi D
not project management overall costs the software ng a ng
goal? within to the happy and custom
budget customer at well- er
the agreed functionin compla
time g ints
developm
ent team
32  Project managers have to True False Neither None B
assess the risks that may True nor of
affect a project. False These

33  Which of the following is Specification Product Testing Staff C


not considered as a risk in delays competition turnove
project management? r
Software Engineering
Online bits (Unit- 5)
34 The process each manager Project Manager life Project All of C
follows during the life of a Management cycle Managem the
project is known as ent Life mentio
Cycle ned
35  A 66.6% risk is very low low moderate high D
considered as

36 Quality planning is the  team project customers project B


process of developing a manag
quality plan for er

37 Identify the sub-process of Process Process De- Process B


process improvement introduction analysis processifi distribu
cation tion
38  The intent of project minimizatio for strategic assessing minimi D
metrics is: n of purposes project zation
development quality on of
schedule ongoing develo
basis pment
basis
39 Which of the following is Efficiency Cost Effort All of A
not a direct measure of SE Applied the
process? mentio
ned
40  Which of the following is Quality Complexity Reliability All of D
an indirect measure of the
product? Mentio
ned