Professional Documents
Culture Documents
● T EC AL
FO
UND
I NS
N
T I T UT E O F
ED 1 9 6 2 MA N
ENTRY
I LA
HE
● S PH I
L I PP I NE
STEP
UP FENCE
STUDY AREA
SHE
HE
BOOTH
STEP
MDP STUDY AREA
LENDING
UP
3-30mm²
1-14mm²G BACKSTAGE
DN
STEP
EXISTING
SEPTIC TANK AREA
1 21" Ø PVC PIPE
0.80
STAGE STAGE
PHYSICAL PLANT
W A L K
MANAGEMENT OFFICE
ACU
2.0 HP
PULL BOX
ACU
2.0 HP
PULL BOX
B A C K A L L E Y
ACU
ACU
2.0 HP
2.0 HP
SEMINAR SEMINAR
ROOM A ROOM B
2.0 HP
2.0 HP
Y
2.0 HP
TIN:
REG:
W
FIRE
EXIT
0.80
1.80
1.80
CONTROL
3-250mm² ROOM
E
MDP ANNEX
0.90
1-22mm²G
3" Ø PVC PIPE
C.R.
115-880-310
13761
EXEC.
1.80
FEMALE
V
PTR:
C.R.
LOBBY LOBBY
MALE
EXEC.
PLACE:
3-200mm²
1.00
PULL BOX
DN.
1-22mm²G
RAMP
2ND FLOOR
3" Ø PVC PIPE
MH
I
CB
-
MDP MEETING ROOM
STEP UP
1
E
ARCHITECT/PPMO DIRECTOR
AR. FRANKIE VIADO
ACU
2.0 HP
2ND FLOOR 2ND FLOOR
SAD
R
DATE:
OFFICE
D
ACU
3 TR
-
9277327
LOUNGE
CONDENSER
WOODEN ACCORDION DOOR
ADDRESS:
F.E.
DS
STEEL DOOR
CB
CB
SCALE
CORP.
ADD'L FOR
PROJECT TITLE:
CORP.
ADD'L FOR
CORP.
ADD'L FOR
REGISTRAR'S
____" DIAMETER RCP STORM DRAINAGE SYSTEM
OFFICE
A R E A
SPLICING POINT OF
DS
PULL BOX
CB
PULL BOX
PPG-B B1
R E C E I V I N G
SPLICING POINT OF
MDP ANNEX FEEDER LINE
PARKING SLOTS
WAITING AREA
UP
STEP
ALUMNI &
PLACEMENT
MOUNTED A.C.U.
F.E.
STO.
SPLICING POINT OF
BUILDING 1 FEEDER LINE
0.90
KITCHEN
TELLERING
TELLERING EXT.
5 TR
ACU
OWNER:
1.20
0.90
0.90
0.90
ANTE
ROOM
CB
CORRIDOR
F.E.
NTS
MH
0.90
ACU
2.0 HP
ACU
2.0 HP
EXECUTIVE
Y
W A L K
OFFICE
ACU
2.0 HP
F.E.
ACU
2.0 HP
A
RECEPTION &
H A L L W A Y
LOUNGE ROOM
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES
SPLICING POINT OF
ACU
W
2.0 HP
EXEC.
STUDY AREA FEEDER LINE C.R.
E.F.
3-100mm²
C O V E R E D
1-14mm²G
MH
C.R.
MDPG-E B1 MDPG-N B1
ENTRANCE
UP
V
DATE:
LANDING
DRAWN BY:
FEMALE
F.E.
CHECKED BY:
REVISION NO.:
I
C.R.
APPROVED BY:
R
ACL
PPMO
EPP
00
06-AUG.-20
1-22mm²G
MDP CAREER CENTER 4" Ø PVC PIPE
ECB 500AT RISER UP
SPLICING POINT OF 2 SETS 3RD FLOOR EE ROOM
MDP ANNEX FEEDER LINE 3-125mm² MCB 3200AT BUILDING 1
1-14mm²G
4" Ø PVC PIPE
SHEET CONTENT:
ECB 1250AT
MTS 1250AT 9 SETS
3-250mm²
1-80mm²G
3 SETS CAREER CENTER
3-250mm² 500KVA, 3P
RAMP DN
1-22mm²G
4" Ø PVC PIPE
STAIR
GENSET
SINGLE LINE DIAGRAM
(E)
SECURITY GUARD
S I D E W A L K
PROVISION
PEDESTRIAN GATE
SHEET NO.
E
- -