You are on page 1of 1

H NO L OG I C

● T EC AL

FO
UND
I NS
N

T I T UT E O F

ED 1 9 6 2 MA N
ENTRY

I LA
HE
● S PH I
L I PP I NE

STEP
UP FENCE
STUDY AREA
SHE

HE

BOOTH
STEP
MDP STUDY AREA

LENDING
UP

3-30mm²
1-14mm²G BACKSTAGE

DN
STEP
EXISTING
SEPTIC TANK AREA
1 21" Ø PVC PIPE

0.80
STAGE STAGE

PHYSICAL PLANT
W A L K

MANAGEMENT OFFICE
ACU
2.0 HP

PULL BOX
ACU
2.0 HP

PULL BOX

B A C K A L L E Y
ACU
ACU
2.0 HP

2.0 HP
SEMINAR SEMINAR
ROOM A ROOM B

REPUBLIC ACT 9266


ACU
ACU

2.0 HP
2.0 HP
Y

ARCHITECT OR AUTHOR OF SAID DOCUMNETS.


BACKALLEY
ACU
ACU
2.0 HP

2.0 HP

AND OTHER PROJECTS OR BUILDINGS WHETER EXECUTED


SEALED AS INSTRUMENT OF SERVICES, ARE INTELLECTUAL

PARTLY OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF


PROPERTY AND DOOCUMENTS OF ARCHITECT, WHETER THE
OTHER CONTRACT DOCUMENTS OF SERVICES, STAMPED OR

SHALL BE UNLAWFUL FOR NAY PERSON TO DUPLICATE OR TO


OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT
SEC. 33. OWNERSHIP OF PLANS, SCPECIFICATIONS AND OTHER
CONTRACT DOCUMENTS-DRAWINGS AND SPECIFICATIONS AND
A

MAKE COPIES OF SAID DOCUMENTS FORUSE OF REPETITION OF

TIN:
REG:
W

FIRE
EXIT
0.80
1.80
1.80

CONTROL
3-250mm² ROOM
E

MDP ANNEX
0.90

1-22mm²G
3" Ø PVC PIPE

C.R.

115-880-310
13761
EXEC.
1.80

FEMALE
V

PTR:
C.R.
LOBBY LOBBY

MALE
EXEC.

PLACE:
3-200mm²
1.00

PULL BOX
DN.

1-22mm²G
RAMP

2ND FLOOR
3" Ø PVC PIPE
MH
I
CB

-
MDP MEETING ROOM

STEP UP

1
E

ARCHITECT/PPMO DIRECTOR
AR. FRANKIE VIADO
ACU
2.0 HP
2ND FLOOR 2ND FLOOR
SAD
R

DATE:
OFFICE
D

ACU
3 TR

-
9277327
LOUNGE
CONDENSER
WOODEN ACCORDION DOOR

ADDRESS:
F.E.
DS

STEEL DOOR
CB
CB

SCALE
CORP.
ADD'L FOR

PROJECT TITLE:
CORP.
ADD'L FOR

CORP.
ADD'L FOR

REGISTRAR'S
____" DIAMETER RCP STORM DRAINAGE SYSTEM

OFFICE
A R E A

SPLICING POINT OF
DS

PULL BOX
CB

938 AURORA BLVD. CUBAO, QUEZON CITY


MDP ANNEX FEEDER LINE
ACU
MH

PULL BOX

PPG-B B1
R E C E I V I N G

SPLICING POINT OF
MDP ANNEX FEEDER LINE
PARKING SLOTS

WAITING AREA
UP
STEP

T.I.P. QUEZON CITY BUILDING 1


OFFICER

ALUMNI &
PLACEMENT

T.I.P. QUEZON CITY 500KVA GENSET FEEDER WIRE


DS
CB

BUILDING 1 1.5 TR. SPLIT WALL


CB

MOUNTED A.C.U.
F.E.

STO.

SINGLE LINE DIAGRAM


_____" DIAMETER RCP STORM DRAINAGE SYSTEM

SPLICING POINT OF
BUILDING 1 FEEDER LINE
0.90

KITCHEN
TELLERING

TELLERING EXT.
5 TR
ACU

OWNER:
1.20

TIP DESIGN GRILLS


0.90
0.70

0.90
0.90
0.90
ANTE
ROOM
CB

CORRIDOR
F.E.

F.E. ROOF LINE


DS

CHB WALL HARDIFLEX WALL


0.90

NTS
MH

0.90
ACU
2.0 HP

ACU
2.0 HP

EXECUTIVE
Y
W A L K

OFFICE
ACU
2.0 HP
F.E.
ACU
2.0 HP
A

RECEPTION &
H A L L W A Y

DR. ELIZABETH Q. LAHOZ

LOUNGE ROOM
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES

SPLICING POINT OF
ACU
W

2.0 HP

EXEC.
STUDY AREA FEEDER LINE C.R.
E.F.

3-100mm²
C O V E R E D

1-14mm²G
MH

PULL BOX 2 21" Ø PVC PIPE


MALE
E

C.R.
MDPG-E B1 MDPG-N B1
ENTRANCE
UP
V

DATE:
LANDING

DRAWN BY:

FEMALE
F.E.

CHECKED BY:

REVISION NO.:
I

C.R.
APPROVED BY:
R

ACL
PPMO

EPP

00

06-AUG.-20

SPLICING POINT OF 3 SETS


MDP ANNEX FEEDER LINE 3-250mm²
D

1-22mm²G
MDP CAREER CENTER 4" Ø PVC PIPE
ECB 500AT RISER UP
SPLICING POINT OF 2 SETS 3RD FLOOR EE ROOM
MDP ANNEX FEEDER LINE 3-125mm² MCB 3200AT BUILDING 1
1-14mm²G
4" Ø PVC PIPE
SHEET CONTENT:

ECB 1250AT
MTS 1250AT 9 SETS
3-250mm²
1-80mm²G
3 SETS CAREER CENTER
3-250mm² 500KVA, 3P
RAMP DN

1-22mm²G
4" Ø PVC PIPE
STAIR

GENSET
SINGLE LINE DIAGRAM
(E)
SECURITY GUARD

CONCRETE BEAM ABOVE


GATE
UP
54X55

S I D E W A L K
PROVISION
PEDESTRIAN GATE

SHEET NO.

E
- -

TO MERALCO POWER SUPPLY

You might also like