Professional Documents
Culture Documents
ABUJA
Prepared by:
March, 2022
Plate Load Test
CONTENTS
1.0 Overview 3
2.0 Testing Equipment 5
3.0. Test Procedure 5
4.0 Settlement and Bearing Capacity Analysis 6
5.0 Conclusion and Recommendation 11
APPENDICES
Appendix A1: Load - settlement curve
PLATES
Plate A: Test set up
TABLE
Table 1: Summary of settlement and bearing capacity
Table 2: Test Information
2
Plate Load Test
1. OVERVIEW
The report contains information on the plate load test carried out at
a site in Abuja. The test was conducted on the 19th and 20th March,
2022 at the proposed foundation depth, the size of plate used is
600mm. The test results are depicted in appendix A1 while
computation for each test point is in section 4. Table 1 shows the
summary of settlement and bearing capacity.
3
Plate Load Test
4
Plate Load Test
5
Plate Load Test
Sf = Sp { }2
B﴾Bp + 0.3﴿
Bp(B + 0.3﴿
In clay soils,
Sf = Sp x B
Bp
Where;
𝑆𝑓 Permissible Settlement of footing in mm
𝑆𝑝 Settlement of test plate in mm
𝐵 Size of footing in meters (m); Assume 1.2m
𝐵𝑝 Size of test plate in meters (0.6m).
Permissible Settlement of footing when B is 1.5m therefore is;
6
Plate Load Test
Test point 1
From Appendix A1, Plate Ultimate bearing capacity (qp) is
𝟗𝟗. 𝟎𝒌𝑵/𝒎𝟐 and settlement of test plate in mm 𝑆𝑝 = 23mm
For cohesive soil, qp = qf (Footing Ultimate bearing capacity)
Therefore, settlement of footing is,
Sf = Sp x B
Bp
Sf = Sp x 1.2/0.6
Sf = 23 x 1.2/0.6
= 46mm
Test point 2
From Appendix A1, Plate Ultimate bearing capacity (qp) is
𝟕𝟒. 𝟎𝒌𝑵/𝒎𝟐 and settlement of test plate in mm 𝑆𝑝 = 12mm
For cohesive soil, qp = qf (Footing Ultimate bearing capacity)
Therefore, settlement of footing is,
Sf = Sp x B
Bp
Sf = Sp x 1.2/0.6
Sf = 12 x 1.2/0.6
= 24mm
Test point 3
From Appendix A1, Plate Ultimate bearing capacity (qp) is
𝟔𝟖. 𝟎𝒌𝑵/𝒎𝟐 and settlement of test plate in mm 𝑆𝑝 = 16mm
For cohesive soil, qp = qf (Footing Ultimate bearing capacity)
Therefore, settlement of footing is,
Sf = Sp x B
Bp
Sf = 16 x 1.2/0.6
= 32mm
7
Plate Load Test
Test point 4
From Appendix A1, Plate Ultimate bearing capacity (qp) is
𝟏𝟎𝟎. 𝟎𝒌𝑵/𝒎𝟐 and settlement of test plate in mm 𝑆𝑝 = 8
For cohesive soil, qp = qf (Footing Ultimate bearing capacity)
Therefore, settlement of footing is,
Sf = Sp x B
Bp
Sf = 8 x 1.2/0.6
= 16mm
Test point 5
From Appendix A1, Plate Ultimate bearing capacity (qp) is
𝟏𝟎𝟎. 𝟎𝒌𝑵/𝒎𝟐 and settlement of test plate in mm 𝑆𝑝 = 7.2
For cohesive soil, qp = qf (Footing Ultimate bearing capacity)
Therefore, settlement of footing is,
Sf = Sp x B
Bp
Sf = Sp x 1.2/0.6
Sf = 7.2 x 1.2/0.6
= 14.4mm
Test point 6
From Appendix A1, Plate Ultimate bearing capacity (qp) is
𝟗𝟐. 𝟎𝒌𝑵/𝒎𝟐 and settlement of test plate in mm 𝑆𝑝 = 16
For cohesive soil, qp = qf (Footing Ultimate bearing capacity)
Therefore, settlement of footing is,
Sf = Sp x B
Bp
Sf = Sp x 1.2/0.6
Sf = 16 x 1.2/0.6
= 32mm
8
Plate Load Test
Test point 7
From Appendix A1, Plate Ultimate bearing capacity (qp) is
𝟕𝟐. 𝟎𝒌𝑵/𝒎𝟐 and settlement of test plate in mm 𝑆𝑝 = 7.8mm
For cohesive soil, qp = qf (Footing Ultimate bearing capacity)
Therefore, settlement of footing is,
Sf = Sp x B
Bp
Sf = Sp x 1.2/0.6
Sf = 7.8 x 1.2/0.6
= 15.6mm
Test point 8
From Appendix A1, Plate Ultimate bearing capacity (qp) is
𝟏𝟐𝟖. 𝟎𝒌𝑵/𝒎𝟐 and settlement of test plate in mm 𝑆𝑝 = 2
For cohesive soil, qp = qf (Footing Ultimate bearing capacity)
Therefore, settlement of footing is,
Sf = Sp x B
Bp
Sf = Sp x 1.2/0.6
Sf = 2 x 1.2/0.6
= 4mm
Test point 9
From Appendix A1, Plate Ultimate bearing capacity (qp) is
𝟏𝟖𝟖. 𝟎𝒌𝑵/𝒎𝟐 and settlement of test plate in mm 𝑆𝑝 = 0.81
For cohesive soil, qp = qf (Footing Ultimate bearing capacity)
Therefore, settlement of footing is,
Sf = Sp x B
Bp
Sf = Sp x 1.2/0.6
Sf = 0.81 x 1.2/0.6
= 1.62mm
9
Plate Load Test
Test point 10
From Appendix A1, Plate Ultimate bearing capacity (qp) is
𝟐𝟎𝟎. 𝟎𝒌𝑵/𝒎𝟐 and settlement of test plate in mm 𝑆𝑝 = 5.08mm
For cohesive soil, qp = qf (Footing Ultimate bearing capacity)
Therefore, settlement of footing is,
Sf = Sp x B
Bp
Sf = Sp x 1.2/0.6
Sf = 5.08 x 1.2/0.6
= 10.16mm
10
Plate Load Test
6.0 CONCLUSION
The report contains information on the plate load test carried out at
a site in Abuja. The test was conducted on the 19th and 20th March,
2022 at the proposed foundation depth, the size of plate used is
600mm. The test results are depicted in appendix A1 while
computation for each test point is in section 4. Table 1 shows the
summary of settlement and bearing capacity.
7.0 RECOMMENDATION
Considering the low bearing capacity and high settlement values,
raft or pile foundation is hereby recommended for the intended
structure.
11
Plate Load Test
12
Plate Load Test
PROJECT: Abuja
Working
Loading Applied
Load Pressure Tim e Settlem ent in m m
steps Load
Increm ent
Cum m ulative
Average
num ber Stage (kN) bar Tim e Dial Guage Dial Gage Total
(m m )
(Mins) 1(m m ) 2(m m ) Settlem ent
50.00 10.805
2 1 70 2.0 9.36 12.25 21.610
100.00 24.010
3 2 140 7.0 20.22 27.80 48.020
150.00 40.900
4 3 210 17.0 41.30 40.50 81.800
200.00 57.685
5 4 280 21.0 58.11 57.26 115.370
225.00 60.756
6 5 250 25.0 60.23 61.28 121.511
250.00 64.825
7 6 420 50.0 64.19 65.46 129.650
10.000
Qu = 99KN/m2
Settlement (mm)
20.000 Sp = 23.0mm
30.000
40.000
50.000
60.000
70.000
13
Plate Load Test
PROJECT: Abuja
Working
Loading Applied
Load Pressure Tim e Settlem ent in m m
steps Load
Increm ent
Cum m ulative
Average
num ber Stage (kN) bar Tim e Dial Guage Dial Gage Total
(m m )
(Mins) 1(m m ) 2(m m ) Settlem ent
25.00 1.671
2 1 35 3.0 2.44 0.90 3.342
50.00 6.148
3 2 70 13.0 6.22 6.08 12.295
75.00 11.458
4 3 105 20.0 10.74 12.18 22.915
100.00 20.445
5 4 140 24.0 18.21 22.68 40.890
125.00 26.225
6 5 175 28.0 25.68 26.77 52.450
150.00 33.555
7 6 210 53.0 33.67 33.44 67.110
5.000
Qu = 74KN/m2
Settlement (mm)
10.000 Sp = 12.0mm
15.000
20.000
25.000
30.000
35.000
40.000
14
Plate Load Test
PROJECT: Abuja
Working
Loading Applied
Load Pressure Tim e Settlem ent in m m
steps Load
Increm ent
Cum m ulative
Average
num ber Stage (kN) bar Tim e Dial Guage Dial Gage Total
(m m )
(Mins) 1(m m ) 2(m m ) Settlem ent
25.00 8.000
2 1 35 0.5 6.93 9.08 16.000
50.00 12.122
3 2 70 1.0 11.81 12.44 24.243
75.00 19.360
4 3 105 8.0 18.95 19.77 38.719
100.00 30.230
5 4 140 12.0 28.32 32.14 60.460
125.00 37.355
6 5 175 16.0 36.49 38.22 74.710
150.00 42.590
7 6 210 41.0 42.33 42.85 85.180
5.000
10.000
Qu = 68KN/m2
Settlement (mm)
15.000 Sp = 16.0mm
20.000
25.000
30.000
35.000
40.000
45.000
15
Plate Load Test
PROJECT: Abuja
Working
Loading Applied
Load Pressure Tim e Settlem ent in m m
steps Load
Increm ent
Cum m ulative
Average
num ber Stage (kN) bar Tim e Dial Guage Dial Gage Total
(m m )
(Mins) 1(m m ) 2(m m ) Settlem ent
25.00 2.545
2 1 35 10.0 2.67 2.42 5.090
50.00 4.105
3 2 70 13.0 4.32 3.89 8.210
75.00 6.560
4 3 105 16.0 6.33 6.79 13.120
100.00 8.215
5 4 140 19.0 8.32 8.11 16.430
125.00 11.495
6 5 175 22.0 11.32 11.67 22.990
150.00 14.475
7 6 210 27.0 14.85 14.10 28.950
2.000
4.000
Settlement (mm)
6.000 Qu = 100KN/m2
Sp = 8.0mm
8.000
10.000
12.000
14.000
16.000
16
Plate Load Test
PROJECT: Abuja
Working
Loading Applied
Load Pressure Tim e Settlem ent in m m
steps Load
Increm ent
Cum m ulative
Average
num ber Stage (kN) bar Tim e Dial Guage Dial Gage Total
(m m )
(Mins) 1(m m ) 2(m m ) Settlem ent
25.00 1.538
2 1 35 15.0 1.10 1.98 3.075
50.00 3.660
3 2 70 25.0 3.21 4.11 7.320
75.00 6.265
4 3 105 29.0 5.32 7.21 12.530
100.00 7.330
5 4 140 34.0 6.45 8.21 14.660
125.00 8.775
6 5 175 37.0 8.67 8.88 17.550
150.00 10.050
7 6 210 42.0 9.89 10.21 20.100
250.00 14.135
8 7 350.00 47.0 13.76 14.51 28.270
2.000
4.000
Settlement (mm)
6.000 Qu = 100KN/m2
Sp = 7.2mm
8.000
10.000
12.000
14.000
16.000
17
Plate Load Test
Working
Loading Applied
Load Pressure Tim e Settlem ent in m m
steps Load
Increm ent
Cum m ulative
Average
num ber Stage (kN) bar Tim e Dial Guage Dial Gage Total
(m m )
(Mins) 1(m m ) 2(m m ) Settlem ent
25.00 7.990
2 1 35 10.0 5.90 10.08 15.980
50.00 10.785
3 2 70 15.0 8.39 13.18 21.570
75.00 13.650
4 3 105 25.0 11.37 15.93 27.300
100.00 16.855
5 4 140 30.0 12.53 21.18 33.710
125.00 21.450
6 5 175 35.0 12.67 30.23 42.900
150.00 25.485
7 6 210 40.0 15.55 35.42 50.970
250.00 37.390
8 7 350.00 50.0 35.67 39.11 74.780
5.000
10.000
Qu = 92KN/m2
15.000 Sp = 16mm
Settlement (mm)
20.000
25.000
30.000
35.000
40.000
18
Plate Load Test
PROJECT: Abuja
Working
Loading Applied
Load Pressure Tim e Settlem ent in m m
steps Load
Increm ent
Cum m ulative
Average
num ber Stage (kN) bar Tim e Dial Guage Dial Gage Total
(m m )
(Mins) 1(m m ) 2(m m ) Settlem ent
25.00 3.660
2 1 35 15.0 3.21 4.11 7.320
50.00 5.890
3 2 70 30.0 5.32 6.46 11.780
75.00 7.270
4 3 105 33.0 6.21 8.33 14.540
100.00 9.660
5 4 140 38.0 11.31 11.42 19.320
125.00 12.270
6 5 175 44.0 12.54 12.00 24.540
150.00 14.475
7 6 210 49.0 14.57 14.38 28.950
2.000
4.000
Settlement (mm)
6.000 Qu = 72 KN/m2
Sp = 7.8mm
8.000
10.000
12.000
14.000
16.000
19
Plate Load Test
PROJECT: Abuja
Working
Loading Applied
Load Pressure Tim e Settlem ent in m m
steps Load
Increm ent
Cum m ulative
Average
num ber Stage (kN) bar Tim e Dial Guage Dial Gage Total
(m m )
(Mins) 1(m m ) 2(m m ) Settlem ent
25.00 0.380
2 1 35 5.0 0.53 0.23 0.760
50.00 0.555
3 2 70 13.0 0.81 0.30 1.110
75.00 0.965
4 3 105 23.0 1.45 0.48 1.930
100.00 1.585
5 4 140 33.0 2.32 0.85 3.170
125.00 1.945
6 5 175 43.0 2.76 1.13 3.890
150.00 2.725
7 6 210 48.0 3.12 2.33 5.450
200.00 4.545
8 7 280.00 58.0 4.98 4.11 9.090
250.00 6.355
9 8 350.00 73.0 6.69 6.02 12.710
1.000
3.000
4.000
5.000
6.000
7.000
20
Plate Load Test
PROJECT: Abuja
Working
Loading Applied
Load Pressure Tim e Settlem ent in m m
steps Load
Increm ent
Cum m ulative
Average
num ber Stage (kN) bar Tim e Dial Guage Dial Gage Total
(m m )
(Mins) 1(m m ) 2(m m ) Settlem ent
25.00 0.020
2 1 35 5.0 0.01 0.03 0.040
50.00 0.265
3 2 70 15.0 0.26 0.27 0.530
75.00 0.325
4 3 105 25.0 0.37 0.28 0.650
100.00 0.425
5 4 140 35.0 0.47 0.38 0.850
125.00 0.520
6 5 175 45.0 0.56 0.48 1.040
150.00 0.600
7 6 210 50.0 1.03 0.56 1.200
200.00 0.900
8 7 280.00 65.0 1.11 0.69 1.800
250.00 1.300
9 8 350.00 80.0 1.27 0.79 2.600
0.200
0.400
Settlement (mm)
0.600
0.800
Qu = 188kN/m2
Sp = 0.81mm
1.000
1.200
1.400
21
Plate Load Test
PROJECT: Abuja
Working
Loading Applied
steps
Load
Load
Pressure Tim e Settlem ent in m m Point 10
Increm ent
Cum m ulative
Average
num ber Stage (kN) bar Tim e Dial Guage Dial Gage Total
(m m )
(Mins) 1(m m ) 2(m m ) Settlem ent
25.00 0.210
2 1 35 10.0 0.18 0.24 0.420
50.00 0.960
3 2 70 20.0 1.11 0.81 1.920
75.00 1.865
4 3 105 30.0 2.23 1.50 3.730
100.00 2.965
5 4 140 40.0 3.63 2.30 5.930
125.00 3.315
6 5 175 50.0 4.11 2.52 6.630
150.00 4.035
7 6 210 55.0 4.65 3.42 8.070
200.00 5.170
8 7 280.00 65.0 5.92 4.42 10.340
250.00 7.225
9 8 350.00 80.0 7.60 6.85 14.450
Point 10
Load and Settlement Curve
1.000
2.000
3.000
Settlement (mm)
4.000
5.000 Qu = 200kN/m2
Sp = 5.08mm
6.000
7.000
8.000
22