You are on page 1of 23
GUJRANWWALA E TEST.CHEGK PROFORMA IN RE nly eof Division / SDivn 2. Name & Address RIC POWER COMPANY LIMITED ‘CT.OF CONNECTION HAVING LOAD UPTO 499 KW Cer 2B 0OF9SH JAS. qin peoge 3. Kindotintavey/Tant/Shont_wATE? Sopher 4. Name of Fe Leflace_ L1-10u 5. Scope af Work BA poke App: No & Date fu_uiff Aol a STALL. KWH wot’ + ToumeterNo 4/ 3a 37 cams 2 simno 3/6 S93P of 2 / 3. Make Creative “x @ X 4. Capacity S110 5/10 5 Constant 4000 IMP f- Looweinf. 8. Volt/ Phase zaoaoo3Pawre __/ 304009, awire 7. Reading Tota 0 92 oS _Mep _52 8 MDI og L$ 2° KWSum 2 (62 (2-32. /- 10. Reset No o8 v of NEW EXISTING vewH = _BAYo Rey e 2. KVARH 2x 2kye 3. MDI Rxyo 2xGe 4 KWSum BLY Z RKYye CT Ratio (Installed) CT Ratio (Existing) CT Ratio (Removed) 20¢e/(QN- Dee Gt =a) COMPLETE READING CYCLE OF DIGITAL METER NEWLY INSTALLED / EXISTING REMOVED Oate_/9-%- 2-2. Date LF to: 22 Time__ 7G ‘Po Time__7 KWH Total_o + 92 KW sum_p‘62_ KWH Total fre? kw sum_/2.:22. th ge 11, o tbe 122 T1pa.ey e eo? wiooeé 753. TW_2y 13, = 13, = 13, es fn Toa D ResetNo__o KVARH Total_) Reset No._o 7 ee Instant KWo “Z2 1_fe Instant KW_o- 7p c Bra Instant KV. 12, oF Instant KV, B = Instant PF 13, Instant PF. MOI Total. oe AUPE, MOI Total_/+ Fo AVP. 11 MWe 72, Ra 13 sp0,0P) déector Op. _sioive TECNEAL SERVICES (MGT) s CIBY CIRCLE GEPCO Ger ae GEYCO Scanned with CamScanner vomee andres tae LS Suia AC wo PAREC= 0 fFISPL ‘eter Checking Result ‘Accuracy With in Permissible limits of error 8. Newly pasted MS-Gtps / Postal order = Meter BL 1S 22-410 ye 16, (S320 ATB Inside Glass_ outside Glass_ — Ter. ZZ vatom__/S 3 P49 Right Side. (S3745 Let side_ 7.8 3-96 $ MS S (REMOVED). BLICT3227 9% fe 32 10. MSS (RETAINED), BL 1S 3729 fo 33 11 TIF Capacity /In depended / Make / StNo___/wwg.jé» a = 42. LT Bushing M.S.$ Nos. = 13 Wredby Name_Cmyea Bahhi'e Signature. 7 14 Tested by, Name, Dol at Bhred Signature, 15. Date of execution of work: Fr2e 16, Detail of Work done / Observation / Recommendations. The technical committee visited the site for replacement of TOU meter with AMR meter. Before opening the A.1.B checked the meter and found “with in permissible limits of error. Then open the A.T.B removed the old meter and installed new AMR meter. Complete the job check the accuracy of new meter on heater load and found with in permissible limits of error. After that close the A.T.B welded & pasted postal order which is dully signed by the technical committee as mentioned above. / f x 18. Name Designation ‘Signature Date 1 Mas_frat tse. 2- 46. Detail of Work done / Observation / Recommendations, The technical conmmittee visited the site for replacement of TOU meter with AMR meter. Before opening the A.T.B checked the meter and found “with in permissible limits of error. Then open the _A.T.B removed the old meter and installed new AMR meter. Complete the job check the accuracy_of new meter on heater load and found with in permissible limits of error. After that close the A.T.B welded & pasted postal order which is dully signed by the technical committee as mentioned above. ff - x” 18 Name Designation ‘Signature Date 1 Laos Lng 2 Hbmed XEN operation GEPCO Divisiongad Zz Db 2 Gyn LP Circle Manager (M&T) Circle GEPCO City, 3 Arhas Losey) Bap sp0 Operation GEPCO SiDivision, 4 Consumer / Consumers: Representative triste ASASO SP ale — B8___ £0 ro Copy Forwarded For Information, 4, The SE (Operation) GEPCO CITY CIRCLE. ‘The Manager (M&T) GEPCO, Ltd. Gujranwala 2 3, The XEN (Operation) Division, o GEPCO. 4, The SDO (Operation) SiDivision GEPCO. Scanned with CamScanner JRANWALA ELECTRIC POWE! R. COMPANY LIMITED TEST-CHECK PRO Mn AL RESPECT OF CONNECTION SAVING LOAD UPTO.499 KW muh YQ weno1l73é- Bace nf Name of Division / $.Di 2 Names address __Larrdend ffgS$acm Fe a a Wind éttdadey tain sual phe Me 4. Name of Feeder App: No & Date. 5. Scope of Work slew! Pack oP LT-TOU METER BMISTING/ INSTALL, KWH KVARH kw 1. Tou Meter No 2 G 2. SimNo = 3 Make Citak ve L = 4 Capacity sv L 5. Constant Lorn f 8. Volt/ Phase LieGor{fPge 7 Reading Tota 28) oe. : 8. MOI Otfe. 9. KWSum ap 10. Reset No. ore —+ EXISTING REMOVED wm = edu 2. KVARH ee S f- 3. MOI ke2- 4, KWSum Lp Zz Zk CT Ratio (Installed) CT Ratio (Existing) CT Ratio (Removed) Ae pep) = = COMPLETE READING CYCLE OF DIGITAL METER NEWLY INSTALLED / EXtSTING REMOVED Date o 6 K+ 2e2-2- Date Time__ [1 2 Time, KWH Total_a +7 ww sum_0 ‘PA KWH Total Kw suM___y 1 O'o# 1 aoe 11 [ TH. 12 PL 12, _w 92t 72 12 B 13. 13, 1 13, fi KVARH Total_a OP Reset No__O2~ KVARH Total Reset No. 11 o tho Instant KW__o~ 29 11, Instant KW_ 12 LE. Instant KV. 12, Instant KV, 13 — Instant P.F_ T3, Instant P.F] MOI Total_a -42 AVP. Z MOI Total wer 71, m1, 72. % 13, 3 sposopy of. QQ swivn GErCO ‘SPECTOR CIRCLE MANAGER (M&T) TEC LSERVICES(M&T) CITY GTRCLEGEPCO CLE GEPCO Scanned with CamScanner Vv seared La SSajin ncno__D6- Bren uP Lexrm ‘urple Anes of ey 1B Position weil Status. out Sid, (4: «Newly pasted MIS-Ships / Postal order ° uete_%T_ £079 30227 TC, CEPISE ATB. Inside Glass, GP PP 322 2G outside Glass, 3a Top. LAPS 32. Bottom. LAPS IP. Right Side. BID Ge Left Side, LOAD? 1, 10. MSS (REMOVED), 11. MSS (RETAINED), 42. TIF Capacity In depended! Make /StNo__S@Ku _ tind Sty fste. Gaze 13. LT Bushing M.S.S Nos. KT GDP-I 92-93-99 GS 14. Wired by. Name. wees Bashir Signature. 16. Tested by. Name, bE Gar (Tiwed Signature. er 16. Date of execution of work Yb ex 20d 17. Detail of Work done / Observation / Recommendations. The technical committee visited the site on dated 06-10-2022 to install new/ Back up meter. Committee installed new LT TOU meter with CTS 100/5 Amp in_new ATB. complete the job restore the supply from 50 KVA T/F. Check the accuracy of new meter on heater load and found with in permissible limits of error. After that close the A.T.B welded & pasted postal order which ss dully signed by the technical committee as mentioned above. /~ J 18. Name Designation Signature Date 1 pb Forte r Looe Xen Operation GEPCO Division_Ave ap 2 Lin my Circle Manager (M8T) Circle GEPCO City. 3 frtas hated bape s00 Operation GEPCO ‘SiDivision, & L i 4. Consumer / Consumers Representative Endst No. PRS 34 Date 14 Copy Forwarded For Information 4. The SE (Operation) GEPCO CITY CIRCLE. 2. The Manager (M&T) GEPCO, Ltd. Gujranwala. 3, The XEN (Operation) Division AVG, op GEPCO. 4, The S00 (Operation) CLA ‘S/Division GEPCO. Scanned with CamScanner GUIRANWALA ELECTRIC POWER COMPANY LIMITED ‘TTEST.CHECK PROFORMA IN. RESPECT OF CONNECTION AVING LOAD UPTO 499 KW. 1. NameotDiision/sovn KOZ {CEA nycwo PSMA l= (00.53.00 2. Name & Address Bola l Satay 3. Kind of Industry / Tariff / S Load. 4. App: No& Date BB top lo 2 Goh DIDEIOUS BE CET EB 22 506. No wvarel 2A LOP OOPS [1 FIDL Elect Leflaic Cf HAS 1 28 Kf Dele ph Aus 5. Scope of Work J-TOU METER EXISTING /INSTA T-TOU REMOVED KVARIT Kw KVARI 4. Tou Meter No. op SSH 209s 2. SimNo CBD V0.3 Gal 3. Make Creative bbe 4 Capacity sno I penny 5. Constant 4000 IMP. [Eee ee 6 Vort/Phase 2300400 31P,4 Wire boy, Sf due 7. Reading Total OFS 062 M058. 2968 8 MDI 000 of SE 9. KWSum OFF CRE 40. Reset No a2. ay [ ‘MULTIPLICATION FACTOR AS INDICATED FOR BILLING EXISTING peiguE 1. KWH Be YO ¥ LO 2. KVARH AGO. Zt 20 3. MDI LUO. x20 4 KWSum O x20 CT Ratio fInstatled) CT Ratio (Existing) CT Ratlo (Removed) FOSS 720, COMPLETE READING CYCLE OF DIGITAL METER NEWLY INSTALLED / EXISTING REMOVED Date 9-10“ 22 Date 27-22 Time_AP* Time_2P: KWH Total_O'7 kwsum_ O77. KWH Total 272.5% xw sum_ 22.9% tt D200 71. O04 TH aS 1__ 22 e 1 re 72. O- 12 7023 2 Of 9S 3 = T3, Ss 73, ne 73, Eat KVARH Tota OO 7” Reset No _ D2 KVARH Total 7 7 Reset Noo 7 1 Coe Instant Kw_ 2-7 11, C. Instant KW_e39 12 2 Instant KV__—— 2, 2573 Instant KV__—— 13 = Instant P.F. 13. a, Instant P.F_? SY MOI Total__@ AvP.F__— MDI Total__2 &4 AVP.F__— Tt oO 11 z 72, o T2, 73, 7 73. XEN (OP) SPECTOR ‘CIRCLI Bete sin GEPCO Divn NO. TEC GEPCOGRW CITY CIRCLE GEPCO SERVICES (M&T) CITYCIRCLI ANAGER (M&T) \GEPCO Scanned with CamScanner os Address Rill Sheer weno 3St/pttn 100° F800 + Checking Result racy. With in Permissible limits of error newly pasted NUS.-Stips / Postal order: Meter, TOC. / ATB Inside Glass, outside Glass_ Top, Bottom. Right Side. Left Side. @MSS(REMOVED)_. SKIS 3S96FS__ 4? JO. 10, MS.S (RETAINED), Me. 11. TIF Capacity / In depended / Make / Sr No__ 700 LU) ag SE 12, LT Bushing M.S. Nos Zz Ze Zz pe Tver? 43, Wired by. Name_17-7& 244 Signature. 2 Lijar Afyeof 14. Tested by. Name_7” ffir Abs Signature 15, Date of execution of work: Lt V0. 16, Detail of Work done / Observation / Recommendations. ‘The technical committee visited the site on dated 03-10-2022 for extension of load from 60 KW to 80 KW. Checked the accuracy of existing LT TOU meter and found with in BSS. Then removed the LT TOU meter and Insttaled new AMR meter with CTS 200/5 Amp in new ATB on pole. Complete the job restores the supply from 100 KVA T/P. Check the accuracy of new. installed meter_on heater load and ible limits of error. After that close the A.T.B welded & pasted postal order which found with in permi is dully signed by the technical committee as mentioned above. 48. Name, Designation Signature Date , Alan Late? XEN Operation GEPCO Division /VOZZ » 2 MASI Hari Circle Manager (M&T) Circle GEPCO City. 3. ‘SDO Operation GEPCO syivision C£Lt Ler. 4 Consumer / Consumers Representative Endst No, 2p-e Date 04 _;_'2 i202 Copy Forwarded For Information. 4. The SE (Operation) GEPCO CITY CIRCLE. 2. The Manager (M&T) GEPCO, Lid. Gujranwala. 3. The XEN (Operation) Division__/Vx7_GEPCO. 4 ‘The SDO (Operation) Seu 1b. Siivision GEPCO. CIRCLE MANA! (M&T) CITY Cli HIWALA Scanned with CamScanner GUJRANWALA ELECTRIC POWER COMPANY LIMITED ‘TEST.CHECK PROFORMA IN RESPECT OF CONNECTION HAVING LOAD UPTO 499 KW + mast som pag LR nem Adan SEB2L. 2. Name & Address mn: flaws 3. Kindof Industry /Tarit/Stout_Qeeromyes iB. O Go hee 4. Name of Feeder 5. Scope of Work Leflace Lu Mit hal, ote fle App: No & Date LT-TOU METER, G LINSTALL LT-TOU REMOVED KWH KVARH KWH KVARH 1. Tou Meter No. Ore 2. Sim No 322-8 SF YG = 3. Make Creative wz Bw 4. Capacity _ 510. 50 5 Constant 4000 IMP, Lorrd np 6. Volt/ Phase 230/400 3/P, 4 Wire 230/400 3/P, 4 Wire 7. Reading Total od ah b. EES. 8 MDI g-9?. 2- 9 KWSum Lee Zz SS-2e wa 40. Reset No. o 2e — ety Lee 1. KWH 2. KVARH 3. MDI ee 4. KWSum CT Ratio = CT Ratio (Existing) CT Ratio (Removed) ne 01/3 (IN ee COMPLETE READING CYCLE OF DIGITAL METER NEWLY INSTALLED / EXISTING REMOVED te 26-22 Date_/ S-K +2 > ime_ pe 2 Time. rn Total_rad KW Sum _f2g- KWH Total kwsum_[J> 2+ Wr 1, ae WZEPS T1yk- Fe 2 Led 12 1 Dy 72, TIEPPR ns 7h 13 e. 73. = 13, = vevareiToa a: Wy ResetNo__ 3 KVARH Total GUS Reset No__ 2+ "1 en. Instant KW__ae = 2? ESD os aes Instant KW_¢ “4 12 gue, Instant KV. 72. LER. Instant KV. 3 = instant P.F_7 73, = Instant P.F__/ MOI Total__o "49 AV PLE. MOI Total__2- = AV PF. aoe m1, 72. Z 3, SHO sop) XE! siva Diva NO, TEC GEPCO GEPCO GRW cir Scanned with CamScanner — = Address, 10 ior weno _2P-SAE Rb - (S IS Bef cer Checking Result With in Permissible limits of error Newly pasted WMS-Stps / Postal order. eter WE Ge 9S Fe 19 Tc Gs 45 73. ATB Inside Glass, outside Glass, Tor, som _Caeeeesee Right Side. 604595 Let'side_ 6 9S 7S a § MSS (REMOVED), washed aut 10 MS S (RETAINED), Bie wu F327 teh 2 41. THF Capacity In depended / Make / StNo.___/ife Arig __pirn -d_ = 12. LT Bushing M.S.$ Nos 43. Wired by. Name__/7 Tia 2 Signature, 14, Tested by. Name, 2b fag > Ahmed Signature, Ai 15. Date of execution of work: LS -% +202 2 16. Detail of Work done / Observation | Recommendations. The technical committee visited the site for replacement of TOU meter with AMR meter. Before opening the A.T.B checked the meter and _found “with in permissible limits of error. Then open the A.T.B removed the old meter and installed new AMR meter. Complete the job check the accuracy of new meter on heater load and found with in permissible limits of error. After that close the A.T.B welded & pasted postal order which is dully signed by the technical committee as mentioned above. L wy 2 18. Name Designation Signature Date 1. thar Jo G2 Mi rebel. XEN Operation GEPCO Division p74 2 -fhen OY Circle Manager (M&T) Circle GEPCO City ai parkas katt Basa S00 Operation GEPCO ‘SiDivision. ' 4 ‘Consumer / Consumers oe Endst No. 13F9S-98 Date [7 _1_2o __ro22 ‘Copy Forwarded For Information. 4. The SE (Operation) GEPCO CITY CIRCLE. 2. The Manager (M&T) GEPCO, Ltd. Gujranwala. 3. The XEN (Operation) Division. AL Ph Le GEPCO. 4, The S00 (Operation) _C/A ‘SfDivision GEPCO. Scanned with CamScanner GUIRANWALA ELECTRIC POWER COMPANY LIMITED ‘TEST.CHECK PROFORMA IN RESPECT OF CONNECTION HAVING LOAD UPTO 499 KW: 1 NamearBiisen/soin Aly C1 eww 27-1286 LEIP G0. 2. Name & Address Admed files. Kind of industry /Tariff/Stoaa_Cozamye s BD Name of Feeder App Scope of Work keblace Zev wi ane — LT-TOU METER BNISTING / INSTAL KWH KVARIL 1, TouMeterNo. Q/32 2G oe 2. Sim No 03372-Se 3R ho 3. Make Creative 4 Capacity S40 510 5. Constant 4000 IMP. correo? 6 Volt/Phase ' 230/400 3/P, 4 Wire 230/400 3/P, 4 Wir 7. Reading Total peo 43/77 (9635 8 MDI ee DYE 8. KWSum p27 {29:0} Z 10. Reset No. o3 Pe EXISTING 41. KWH a 2. KVARH a Le 3. MOI (6 4. KWSum Lape CT Ratio (Installed) CT Ratio (Existing) CT Ratio (Removed) 40 / Snr Yapypnr _ COMPLETE READING CYCLE OF DIGITAL METER NEWLY INSTALLED / EXt8* INO REMOVED Date (g =/4" 24 Date_ (SK 2 Time___ AGE 2 Time__7. oC KWH Total. Log KW Sum L2¢ KWH Total Y2l29 KW SUM, [2pek 1 0-08 T__asee mHBSIES THQGw2 m2 Lee Rifas P__26 SPP TR_f2$ice 3 13, = 13, 13, a KVARHTotal_o- Ze —ResetNo.__a KVARHToW/ZERS —ResetNo_R2. a . Instant KWW_p-2 9 m1_e32, Instant KW_o+o 9 12 2 - G Instant KV_ 72, Instant KV_ 13 =_ Instant P.F_ 13. — Instant P.F_ MDI Total__az ave AVP, MDI Total_~1 45° AVP. 7 11, Tyre 12, wii Lge 13 es ee sbo,gP) XEN (OP) PECTOR CIRCLI siivn Diva NOMI TE SERVICES(M&T) CI ‘GE GEPCO GRW cm LE GEPCO Scanned with CamScanner a Address, Abed Biles weno 222026 E22 Gore er Checking Result racy With in Permissible limits of error only pasted MYS-Stps / Postal order soter_ WE Gog? 49 Te G0 19 7B Inside Glass, outside Glass. pa To Botom_ 62094 Sp HS Right Side, bay Lett Side, CALE L. 9 MSS (REMOVED), 2/29 £2 fo PP 10. MS S (RETAINED), (2253p +o Pr . 44. TVF Capacity /In depended Make /SrNo_ 2a 2eg __perof . 12. LT Bushing M S.S Nos. 13. Wired by, Name_47_* /jé)4 > Signature, 14, Tested by. Name, of Liar Berge Signature, ass 45. Date of execution of work 1S 207 ve 46. Detail of Work done / Observation / Recommendations. The technical committee visited the site for replacement of TOU meter with AMR meter. Before opening the A.T.B checked the meter and found “with in permissible limits of error. Then open the A.T.B removed the old meter_and installed new AMR meter. Complete the job check the accuracy of new meter on heater load and found with in permissible limits of error. After that close the A.T.B welded & pasted postal order which is dully signed by the technical committee as mentioned above. / S 48, Name Designation Presin Date 1. Aloe VE Liemad XEN Operation GEPCO Division_“V 07 2M Ae 4) Circle Manager (M&T) Circle GEPCO Ci 3 Aker Lifiel, Rajon. eM . ‘SDO Operation GEPCO (Division, uh 4 Consumer / Consumers Representative Endst No 1334) -94 Date Je 1 10 102 ‘Copy Forwarded For Information. 4, The SE (Operation) GEPCO CITY CIRCLE. 2, The Manager (M&T) GEPCO, Ltd. ‘Gujranwala. 3. The XEN (Operation) Division. M2 ie GEPCO. 4, The SDO (Operation) SiDivision GEPCO. Scanned with CamScanner " GUIRANWALA ELECTRIC POWER COMPANY LIMITED ‘TEST.CHUCK PROFORMA IN RESPECT OF CONNECTION HAVING LOAD URL 4" KW | Mameot Division ssi ALAA CQ ero BLAM po 00 fo/ e+ 2 Name & Address Ahsan 3 Kind ot nduntey/ Tat 18tont_C@ Yeous B. pf he 4. Name ot Feeder App No & Date 5 Scopeot Work Leltace. Tie ath, AML mafe+ M-LOUMMTLR PSISTING /INSTALL, ! WH KYA 1. TouMeterNo aad ba ~ 2 SimNo oa Pe BAY. / 3 Moke Creatwe 4° Capacity 5/10 5 Constant 4090 IMP 6 Volt! Phase 230/400 3/P, 4 Wire 7 Reading Total oe ofr 8 MOI ast 9 KWSum Pas S 10. Reset No oe: MULTIPLICATION FACTOR ASJNDIL NEW EXISTING 1 own R40 Bigs. 2 KVARH —__ RkxGe | 3. MDI o Biya 4. KWSum Rife aa a CT Ratio (Installed) CT Ratlo (Existing) CT Ratio (Removed) veeSprwvo Ae = ING C' FE DIGIT) NEWLY INSTALLED / EXISTING REMOVED date K-22. ae obs TED A uring Time. : Time, KWH Total.» Sa wsum 7S KWH Total Lad, KWSUM 207 6P "1 pees: 11, or oe HZBePe T1204" u enfe 72 Libs T2282 $9 TaZe pe 13, ee T3, T3, < rn Tae I ResetNo__O.3 KVARH Total SYCZS —-ResetNo_1P 2 22 Instant KW_o+/P TYP222 Instant KW_o" 2? —e 7 o- Pe Instant KV. T2__foR2e Instant KV, 3 =_ Instant PF 73, Instant PF, er MOI Total__9 + Ou AV PE. MOI Total__/' é cis AvP, ee 1 neh 12. f___ 13, # (or) als sive XENLOP) NO. rcoGRw Scanned with CamScanner vy vancaress___Lth G40 weno BAH 36-0 [foo » checking Result acy. With in Permi ‘vouly pasted MS-Stps / Postal order: WE 604926 026 Te. 604932 ble limits of error / ATB Inside Glass, outside Giass, Ter, 7 Botom___ Got P27 Right Side. 624546 Let'side__60494 9 MSS (REMOVED) we 256 te ba 10. WuS S (RETAINED). wo 75652 Cosy 41. TIF Capacity / In depended / Make /SrNo___ (07 K+ __ tnd peng pO a 12. LT Bushing M SS Nos. Leal 13. Wired by. Name__c? » Lerten ‘Signature. 14, Tested by. Name. Dal Fe fon tbe Signature. Ker 15. Date of execution of work: JS > 2er 2 16, Detail of Work done / Observation / Recommendations The technical committee visited the site on dated for replacement of TOU with AMR meter. Before opening the A.T.B checked the meter and found “with in permissible limits of error, Date & Time wrong. Then open the A.T.B removed the old meter_and installed new AMR meter, complete the job check the accuracy of new meter on heater load and found with in permissible limits of error, Afier that close the A.T.B welded & pasted postal order which is dully signed by the technical committee as mentioned above. 4 we 18. Name Designation ‘Signature Date 1.0han 2, ‘XEN Operation GEPCO Division py 977 2 % Circle Manager (M&T) , Citcle GEPCO City 3. DO Operation GEPCO ‘SiDivision_ 4 Consumer / Consumers Representative Endst No. 13733-36 pate _/A- 1/0 02 ‘Copy Forwarded For Information. 1. The SE (Operation) GEPCO CITY CIRCLE. ‘The Manager (M&T) GEPCO, Ltd. Gujranwala 2 3. The XEN (Operation) Division__AV2Zy _ GEPCO. 4 . The SDO (Operation) oh) SiDivision GEPCO. CIRCLE MANAGER (M&T) CITY CIRCLE GWALA Scanned with CamScanner GUIRANWALA ELECTRIC POWER COMPANY LIMITED ‘TESTCHECK PROFORMA IN RESPECT OF CONNECTION JAVING LOAD UPTO 499 KYE Name of Division / Siva WeZ// Cp) nono DAAAZC /P P6007 2 Name & Address Phoned pifees — % Kind of industry /Taritt/Stoad_ (Odqrmye¢ ss BB GPL 4. Name of Feeder App Mo t Date 5. Scope of Work 4ce Owl Aa fl meer _ LL-Tou Mer, SLING JAOUBEMOYED 1 TouMeterNo. 6. (apse =e Z te ee 2 SimNo 0 932-Pe CP/4 > 3 Make Creative ze by 4. Capacity 5/0 a 5. Constant 4900 me LEZ & Vol Phase 2301600 37, 4 Wire ZI YP, 4 Vie 7. Reading Total o fe Gri Bs ee) & MoI aie be = KWwSun Wt yj VU 10. Reset No. o% 7: _ 40S MULTIPLICATION FACTOR AS INDICATED FOR BILUING : ea pe BasTNG p,. spsonm 2 LA de pre le * a =, wisea ton _L T1__p23e rextH at 72. 1222 owe cs, 2, Neatart > wor Tos_o- £5 BPE 1 rr == | ‘ > XEN gor) Boron CREE YEAR AE) DE som noe te SEXVICES MAT) CITY, arcs carcoee are Oy Grr arco Scanned with CamScanner c GUIRANWALA ELECTRIC ROWER COMPANY LIMITED é TEST CHECK PROFORMA IN RESPECT OF CONNECTION HAVING LOAD UPTO 499 KW . © Name of Division /spimn AVO7// cK ACN DAVIE [PALO 7 Name& Address _Qdomed Aifees Mindotindusry/Tanit/Stond_COdemyes BF Phew 4. Name of Feeder App: No & Date 5. Scope of Work _foflace Tw st tel me fer LT-TOU METER E LT-TOU REMOVED 4 ei 20 Bey, eons KWL 1. TouMeterNo. O/2pzo"~ 2 SimNo 0 93.D-Pe CP/4» = 7 3. Make Creative & Bye © 4. Capacity SO. - 5H10 5. Constant 4000 IMP foro itn 6. Volt/ Phase 230/400 3/P, 4 Wire 130/400 3/P, 4 Wire 7. Reading Total o fe 0-92. 2S 2 LK, 8 MDI aiee 0 6 L 9. KWSum LAS PEt te 10. Reset No. o8 fos / EXISTING 1. KWH 2. KVARH —— 3. MDI Us 4. KWSum Regs CT Ratio (Installed) CT Ratio (Existing) CT Ratio (Removed) Lee flr Qar = COMPLETE READING CYCLE OF DIGITAL METER: NEWLY INSTALLED / EXISTING REMOVED Date jS R22 Date_Y=P2-2. Ney, Time__/¢+} 2 Time, 6". oO KWH Total_p Pe kwsum_ 717 KWH Total_ 25 277 Kw suM_Z6-Z_ 1 at£e 11 a2 do 11. 2M 1_Yé" ran 72 Ge 72, LS T2__pp4 Mo TOPS 13 = 73, = 73, 73, = KVARH Total_g -22_ Reset No__2% KVARH Total_22 ‘BZ Reset No. 1 sfe Instant KW_a - 22 71, z Instant KW_g + ay 12 rae Instant KV. T2__1 992 Instant KV. 13 = Instant PZ 13 Instant P.F__J MDI Total__o@ +62 AVP, MOI Total__o = 6 AV PE. 11 Taf 2, Tg OO 73. Be SDQ~OP) XEN{OP) SPECTOR: wae Sivn Div NO._ J TEC! SERVICES (M&T) GEPCOGRW CITY CIRCLE GEPCO: Scanned with CamScanner 6 Nime & Address Biles 5 Meter Checking Result Accuracy. With in Permissible limits of error 8. Newly pasted ME-Stips / Postal order Meer WEBGUI ree 16 ATB: Inside Glass, Top. 7 Right Side *T 6P699C 9. M.S.S (REMOVED). 10. M.S.S (RETAINED). Left Side. AIC NO. ZETA bn Lf bay be 457 outside Glass. Bottom _ WL S6 4/96, “Fz GEOL IE. walked ear 13405 to oF NE ae (apa Ms eo 42. LT Bushing M S.S Nos 13. Wired by, Name_a? ‘79077 ‘Signature 14, Tested by. Name. ably r Bhd Signature, 16. Date of execution of work: 1S [er 202-2 16. Detail of Work done / Observation / Recommendations. The technical committee visited the site on dated for replacement of TOU with AMR meter. Before opening the A.T.B checked the meter and found “with in permissible limits of error, Date & Time wrong. Then open the A.T.B removed the old meter and installed new AMR meter, complete the job check the accuracy of new meter on heater load and found with in permissible limits of error. After that close the A.T.B welded & pasted postal order which is dully signed by the technical committee as mentioned above. 18. Designation . Name 4. 209 FA TAK foatidyen Operation GEPCO Aten Fete flrs s oy i Division. ay Circle Manager (M&T) , Circle GEPCO City. 3 Dhar Kase/ 43/44 s00 Operation GEPCO ‘S!Division_ 4 Consumer / Consumers Representative Endst No. 87 -YO Date Copy Forwarded For Information. 4, The SE (Operation) GEPCO CITY CIRCLE. 2, The Manager (M&T) GEPCO, Ltd. Gujranwala. 3. The XEN (Operation) Division V7 /y _ GEPCO. 4, The $00 (Operation) 2. f4 Lp 1_/2 /- va Signature Date 12022 SiDivision GEPCO. A CIRCLE ‘GRR (M&T) CITY CIRCLE GWWALA Scanned with CamScanner

You might also like