You are on page 1of 2
ll ? sembcorp + A study on the solar PV opportunity for the new Food Hub was sized based on the roof allocated for insaling Solar + Based on the drawings provided by SATS, a simulation onthe potential solar PV layout was done using JASolar JAM 72830 545MR ‘545 Vip modules. Executive Summary —- = Es 1 5 Installed Capacity 385 kWp ™ No. of PV Modules: 596 I Expected First Year Output 385 MWh | < | Expected Carbon Abated 157 tCO,/yr Design Assumptions ‘The following are assumptions used to simulate the PV Layout JASolar JAM 72530 S45/MIR 545 Wp panels were used ‘Assumes Kiiplok roof profile, with § degrees tit ‘Assumes inverters willbe installed onthe roof and is within 20 m from the solar aray installation area ‘Assumes switchroom with a spare breaker of >400A will be made available at the rooftop. SATS will consult Sembcorp to keep distance between the sullchroom and the Inverters to be within 50m ‘Assumes @ GS guardrail taller than tm willbe provided by SATS (Cat ladder access to the PV array to facitate maintenance willbe provided by SATS ‘Ascumes the array wll not experience significant shade due to MBE equipment of neighboring buildings [All necessary fre safety clearance has been taken into consideration

You might also like