1. Name of Establishment:
2. Complete Business Address:
5. Plans to be submitted: submit (in quadruplicate) the foundation plan with design, installation and
location plans of the pressure vessel. The plans shall be prepared, signed and sealed by a Professional
Mechanical Engineer. Plan shall also bear the name and signature of owner or manager of the
plant. The working drawing of the pressure vessel shall be submitted together with the First
Inspection Report.
6. Boiler/Pressure Vessel Data:
a. Manufacturer:
b. Type:
c. Serial Number:
d. Place of Origin:
e. Date of Make:
f. Heating Surface:
g. Max. A.W.P.:
h. Volume cu ft:
7. Printed Name and Signature of Person to Supervise the Installation:
PME Registry No. Date:
PTR No. Date:
TIN:
8. Other accessories or equipment:
Company TIN:
Company Tel. No.
Application No.