CURRICULUM VITAE
GEOTECHNICAL &CIVIL ENGINEER
KERROUCHE Akram
District theniet el hdjar
26000 medea, Algeria
Cell: +213.659,319,947
+213.542.647.247
Kerrouche.akram@hotmail.fr
Driving licence: B
Geotechnical & Civil Engineer
Title/Summary
Objective and goals
Expecting a challenging and dynamic career in civil & Building and Geotechnical
engineering where | can apply my knowledge and skill development to work in a
company with an effective environment conductive for personnel Success, intellectual
growth and career advancement and to achieve a position that would offer job
satisfaction and channels for knowledge gained.
Experience Summary
With more than 6 years of experience in the field of infrastructures, buildings, oil and gas
industry.
Employment History
-China State Construction Engineering
Corporation C.S.C.E.C
«Corporation Limited « G.C.E.S »
February 2017 - June 2020 C E
Box Culvert: 12 000m
Technical Gallery: 22,000 m
Earthworks: 74,000 m
Rain Water Pipe: 75 000m
Used Water Pipe: 25 000m
Curb stone: Roads 74m x 2 = 148
Asphalt team: 74,000 m
Tunnel: 9.8km
Substation: 3
Client: ADAResponsibilities:
- Consistent technique of the projects, and organization of the site
- Establishment of the attachments and the financial situations following the works finished
on site.
+ Daewoo E&C (SOUTH KOREA)
April 2013 January 2017
y4
DAEWOO E«c|
MLE, llizi, Algérie
CPF plan CAFC (Central Processing Facility)
Realization of project "EPC" of Cental Area Field Complex (CAFC project)
- CAFC plant (Central Process Facility (32,000bpd),Gas Process Facility (120mmscfd)
Pipe/instrumentation/Electricity interface & Tie ~ in between MLE & CAFC.
~ Production & Gathering System (Infields Manifolds, Flow Line, Production Manifolds) Client:
SONATRACH- FIRSE CALGARY PETROLEUMS.
Responsibilities:
~_ in charge of activities related to the erection of structural and building works on site
for the construction of a Central Processing Facilities
~ ensure that the structural and building construction works performed on site by the
subcontractors comply with contract requirements, approved drawings and specifications and
within time schedule.
~ checking the preparation, issue and implementation by subcontractor of construction means,
including documents, detailed procedures, method statements, drawings, construction
equipment, personnel, planning, as-built documentation, and back-up procedures if necessary.
~ insure that all works under my supervision are performed in a safe manner.
- Establishment reports of advancements and progress of the works (daily reports, Weekly
reports, monthly reports)
*BET MEHLOUFI
May 2012 - April 2013
Medea, Algeria
building engineer
~ Realization of buildings (4 floors) +HOUSE(R+4floors) + outside adjusting. In
Kser el boukhari, Medea,
Client: OPGI MEDEA
Responsibilities:
- Consistent technique of the projects, and organization of the site
~ Establishment of the attachments and the financial situations following the works
Finished on siteEducation and degrees
+ -Bachlor’s degree: civil engineering Master degree
DR YAHIA FARES UNIVERSITY
SEPTEMBER 2012
Medea, Medea, Algeria
Training
+ IELTS (International English Language testing system 2014),
Skills
AutoCAD/MicrosoftExcel/MicrosoftWord/SAP2000/Robot/covadis/dream
si Internet.
Languages knowledge
English,(good)
French,(good)
Arabic,(good)