0% found this document useful (0 votes)
171 views1 page

Barrier Tape Ownership Form Template

Jack-in Pile M Sdn Bhd is conducting piling work from June 20th 2022 to September 20th 2022. Iqbal can be contacted at 017-4409747 and Fahmi can be contacted as a secondary contact at 017-4253774 regarding the Dexcom project. The work involves piling and has slip, fall, open hole, spark and damaged wire rope hazards requiring safety helmet, shoes, vest, glasses and gloves personal protective equipment.

Uploaded by

Bard Badrul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
171 views1 page

Barrier Tape Ownership Form Template

Jack-in Pile M Sdn Bhd is conducting piling work from June 20th 2022 to September 20th 2022. Iqbal can be contacted at 017-4409747 and Fahmi can be contacted as a secondary contact at 017-4253774 regarding the Dexcom project. The work involves piling and has slip, fall, open hole, spark and damaged wire rope hazards requiring safety helmet, shoes, vest, glasses and gloves personal protective equipment.

Uploaded by

Bard Badrul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

BARRIER TAPE OWNERSHIP FORM

START DATE: 20/06/2022


FINISH DATE: 20/09/2022
CONTRACTOR JACK-IN PILE M SDN BHD
POINT OF CONTACT: IQBAL
PHONE: 017-4409747
____________________________________________

SECONDARY CONTACT:
FAHMI
PHONE: 017-4253774
DEXCOM
PROJECT / TOOL NAME: ____________________________________________

TYPE OF WORK: PILING WORK ACTIVITY

HAZARD: SLIP & FALL AND OPEN HOLE/ SPARK /WIRE ROPE DAMAGED

PPE Required: SAFETY HELMET /SAFETY SHOES, SAFETY VEST , SAFETY


GLASS, & GLOVESS