Professional Documents
Culture Documents
K.Rithish Grade-11 A2
K.Rithish Grade-11 A2
ON
MOVIE TICKET BOOKING
FOR
For the year 2022-2023 EXAMINATION
(AS PART OF COMPUTER SCIENCE COURSES [083] )
SUBMITTED BY:
RITHISH.K
UNDER THE GUIDANCE OF:
Mr.S.Kumaresan,B.sc.,[CT],B.Ed.,MCA,MBA
SRI KUMARAN
PUBLIC SENIOR SECONDARY SCHOOL
SRI KUMARAN PUBLIC SENIOR SECONDARY SCHOOL
1
ACADEMIC YEAR : 2021-22
PROJECT REPORT ON
MOVIE TICKET BOOKING
NAME: RITHISH.K
CLASS:11th A2
2
SRI KUMARAN PUBLIC SENIOR SECONDARY SCHOOL
CERTIFICATE
This is to certify that Cadet RITHISH.K. Roll No:11020 has
successfully completed the project work entitled Sales and
Inventory supervision system in the subject Computer Science
(083) laid down in the regulations of CBSE for the purpose of
Practical Examination in Class XI to be held in Sri Kumaran Public
Senior Secondary School on__________
3
TABLE OF CONTENTS [ T O C]
01 ACKNOWLEDGEMENT
02 INTRODUCTION
03 PROPOSED SYSTEM
06 SOURCE CODE
07 OUTPUT
10 TESTING
12 BIBLIOGRAPHY
13 CONCLUSION
4
ACKNOWLEDGEMENT
Apart from the efforts of me, the success of any project depends largely on
the encouragement and guidelines of many others. I take this opportunity to express
my gratitude to the people who have been instrumental in the successful completion
of this project.
I express deep sense of gratitude to almighty God for giving me strength for
the successful completion of the project.
I express my heartfelt gratitude to my parents for constant encouragement
while carrying out this project.
5
INTRODUCTION
6
PROPOSED SYSTEM
Today one cannot afford to rely on the fallible human beings of be really
wants to stand against today’s merciless competition where not to wise saying “to
err is human” no longer valid, it’s outdated to rationalize your mistake. So, to keep
pace with time, to bring about the best result without malfunctioning and greater
efficiency so to replace the unending heaps of flies with a much sophisticated hard
disk of the computer.
One has to use the data management software. Software has been an ascent
in atomization various organisations. Many software products working are now in
markets, which have helped in making the organizations work easier and efficiently.
Data management initially had to maintain a lot of ledgers and a lot of paper work
has to be done but now software product on this organization has made their work
faster and easier. Now only this software has to be loaded on the computer and work
can be done.
This prevents a lot of time and money. The work becomes fully automated
and any information regarding the organization can be obtained by clicking the
button. Moreover, now it’s an age of computers of and automating such an
organization gives the better look.
7
SYSTEM DEVELOPMENT LIFE CYCLE (SDLC)
8
SYSTEM CONCEPT DEVELOPMENT PHASE
9
PHASES OF SYSTEM DEVELOPMENT LIFE CYCLE
INITIATION PHASE
10
DESIGN PHASE
PLANNING PHASE
11
DEVELOPMENT PHASE
12
CODING
global f
f=0
#this t_movie function is used to select movie name
def t_movie():
global f
f = f+1
print("which movie do you want to watch?")
print("1,movie 1 ")
print("2,movie 2 ")
print("3,movie 3")
print("4,back")
movie = int(input("choose your movie: "))
if movie == 4:
# in this it goes to center function and from center it goes to movie function and it
comes back here and then go to theater
center()
theater()
return 0
if f == 1:
theater()
# this theater function used to select screen
def theater():
print("which screen do you want to watch movie: ")
print("1,SCREEN 1")
print("2,SCREEN 2")
print("3,SCREEN 3")
a = int(input("choose your screen: "))
ticket = int(input("number of ticket do you want?: "))
timing(a)
13
# this timing function used to select timing for movie
def timing(a):
time1 = {
"1": "10.00-1.00",
"2": "1.10-4.10",
"3": "4.20-7.20",
"4": "7.30-10.30"
}
time2 = {
"1": "10.15-1.15",
"2": "1.25-4.25",
"3": "4.35-7.35",
"4": "7.45-10.45"}
time3 = {
"1": "10.30-1.30",
"2": "1.40-4.40",
"3": "4.50-7.50",
"4": "8.00-10.45"}
if a == 1:
print("choose your time:")
print(time1)
t = input("select your time:")
x = time1[t]
print("successful!, enjoy movie at "+x)
elif a == 2:
print("choose your time:")
print(time2)
t = input("select your time:")
x = time2[t]
print("successful!, enjoy movie at "+x)
14
OUTPUT
Hi welcome to movie ticket booking:
where you want to watch movie?:
1,city 1
2,city 2
3,city 3
choose your option: 2
which theater do you wish to see movie?
1,Inox
2,Icon
3,pvp
4,back
choose your option: 1
which movie do you want to watch?
1,movie 1
2,movie 2
3,movie 3
4,back
choose your movie: 3
which screen do you want to watch movie:
1,SCREEN 1
2,SCREEN 2
3,SCREEN 3
choose your screen: 1
number of ticket do you want?: 4
choose your time:
{‘1’: ‘10.00-1.00’, ‘2’: ‘1.10-4.10’, ‘3’: ‘4.20-7.20’, ‘4’: ‘7.30-10.30’}
select your time:2
successful!, enjoy movie at 1.10-4.10
15
TESTING
Software Testing is an empirical investigation conducted to provide
stakeholders with information about the quality of the product or service under test, with
respect to the context in which it is intended to operate. Software Testing also
provides an objective, independent view of the software to allow the business to
appreciate and understand the risks at implementation of the software. Test
techniques include, but are not limited to, the process of executing a program or
application with the intent of finding software bugs.
It can also be stated as the process of validating and verifying that a software
program/application/product meets the business and technical requirements that
guided its design and development, so that it works as expected and can be
implemented with the same characteristics. Software Testing, depending on the
testing method employed, can be implemented at any time in the development
process, however the most test effort is employed after the requirements have been
defined and coding process has been completed.
TESTING METHODS
Software testing methods are traditionally divided into black box testing and
white box testing. These two approaches are used to describe the point of view that
a test engineer takes when designing test cases.
Black box testing treats the software as a "black box," without any knowledge
of internal implementation. Black box testing methods include: equivalence
partitioning, boundary value analysis, all-pairs testing, fuzz testing, model-based
testing, traceability matrix, exploratory testing and specification-based testing.
16
SPECIFICATION-BASED TESTING
17
BIBLIOGRAPHY
Computer science with python-class XI By: Sumita Arora
A Project report on MOVIE TICKETS BOKKING
BY: RITHISH.K
Website: https://www.coursera.org/articles/what-is-python-used-for-a-beginners-guide-
to-using-python
18
Conclusion
In this work we have developed a application for easy way
check the ticket avability and easy to book the tickets.
19