You are on page 1of 1

2520 15000 2520 30000 4000 30000 2520 15000 2520

DIRECTION
OF TRAVEL DIRECTION
ESPIRIT
OF TRAVEL BUILDING & ENGINEERING
DIRECTION

15
PTE. LTD.

0
OF TRAVEL

20
0
8 KAKI BUKIT AVE 4, #01-09 PREMIERE@KAKI
BUKIT SINGAPORE 415875
TEL NO: 3157 3326 / 6385 5618
PROPOSED CONCRETE HUMP FAX: 6385 5360
EMAIL: admin @espirit.com.sg
YELLOW STRIPS 150 WIDE 45°

4000

45.0
TYPICAL PAVEMENT WARNING MESSAGE FOR ROAD HUMP


WIDTH OF CARRIAGEWAY

PARABOLIC S-CURVE
DIRECTION
TO BE RAISED BY PREMIX W3B OF TRAVEL

COLOUR SCHEME FOR HUMP


50 100

CARRIAGEWAY LEVEL

800 2400 800


4000 TENURE OF LAND:

SECTION A-A

CONCRETE HUMP DETAILS TENURE OF LAND:


ARCHITECT:
--

20000 TRAILING TERMINAL


WITH RAISED KERB)
20000 LEADING TERMINAL
900 (EXPRESSWAY)
200(OTHER ROAD
STRUCTURAL ENGINEER:
4 NOS. NEW VIG POST

1000
1000

1000

1000
PROJECT TITLE:

DIRECTION OF TRAVEL -
EDGE OF CARRIAGEWAY PLAN 4 NOS. NEW VIG POST
4000 4000
4050
EQ EQ EQ EQ
4050
184

184
600

600
1000

1000
500

500
DIRECTION OF TRAVEL
600 1000 C16/20 ELEVATION C16/20 1000 600 DRAWING TITLE:
MASS CONCRETE MASS CONCRETE
TYPE A-TURNED DOWN ANCHORAGE TERMINAL
CONCRETE HUMP AND VEHICULAR
INTERMEDIATE GUARDRAIL DETAILS

VIG POST DETAIL


SCALE: NTS DRAWN: CLARENCE
DATE: 09/12/2022 CHECKED: JERIN
DRAWING NO.: REV. NO.:
-/EBE/SD/AR/01 0

You might also like