[GBL Construction Solutions]
NON-CONFORMANCE
REPORT
Prepared by
[Esmeralda Thomas]
[esmeralda@gblconstruction.com]
September 25, 2080
Overview
CenaThe GBL Construction Solutions is supervising the construction of a two-story
commercial building located at Maximilian St. Riverdale, Dallas County, Texas 75001
The team is in the process of checking the quality of the electrical and
heating/ventilation/air conditioning (HVAC) systems of the building. Despite the tight
project schedule, the team noticed that the HVAC contractor failed to adhere to
certain quality standards, hence the issuance of a non-conformance report.
Problem
After a comprehensive inspection of the HVAC system, the Quality Control Director
reported that the registers, drills, and diffusers are incompatible with the wall and
ceiling systems. The HVAC contractor wasn't able to comply with the minimum
quality standards set by the client and the standard safety protocols ordered by the
local authorities.
Non-Conformance Details
DESCRIPTION DISPOSITION RESPONSIBLE
The registers, drills, and
diffusers are incompatible Romeo Julianne
- Remove
with the wall and ceiling (Contractor)
systems of the building
Corrective Action
The Quality Control Director initiated and forwarded the report to the Project
Manager to ask for the prompt rectification of the major mishaps of the HVAC
contractor. The Project Manager called the attention of the HVAC contractor to
remind the latter of its obligations under the terms of the subcontracting agreement.
Recommendation
tt hs Now create yur ou documentAll installations must adhere to the standard safety and quality protocols made by
local authorities and in line with the specifications set by the client. The HVAC
contractor's team leader must issue a report within five days from the issuance of
this non-conformance report reflecting the changes that it had made.