1218/22, 6.09 PM SOM Quiz 3
SCM Quiz 3
biancamicaellacerda@ncba.edu.ph Switch account
WY Saving disabled
Your email will be recorded when you submit this form
* Required
Select "TRUE" if the statement is correct and "FALSE" if not.
Practical standard are more likely to be attained by worker making diligent * + point
efforts.
@ Tre
O False
Ideal standards make no allowance for waste spoilage and machine * 1 point
breakdowns
Practical standards can be used for product costing and cash budgeting * 1 poi!
@ Tre
O False
htpssdocs. google. comiformsda/FAlpOLSI89pHAZIqgPHZSFLxPoHO-KEM OplKsIOrI28DSquSeviFXdwiformResponse 71218/22, 6.09 PM SOM Quiz 3
If properly used, standards can help motivate employees. * 1 point
Unfavorable variance, material in amount, should be investigated, but large * 1 poin
favorable variance need not be investigated.
O Tre
@ False
Ideal standards can be used for cash budgeting or product costing. * 1 point
‘A firm using practical standards has no reason to make any midyear * 1 point
adjustment to the production standard if an old machine is replaced by a
newer, faster machine,
htpssdocs. google. comiformsida/FAlpOLSI89pHAZIqgPHZSFLxPoHO-KEM OplKsIOrI28DSquSeviFXdwiformResponse
2a1218/22, 6.09 PM SOM Quiz 3
Standard costs are estimates of costs attainable only under the most ideal * 1 point
conditions, but rarely practicable.
Behavioral scientists find that perfection standards often discourage * 1 point
‘employees and result in low worker morale,
The standard cost per unit of materials is used to calculate a materials * 1 point
price variance.
@ Tre
O False
Ideal standards are also called theoretical or maximum efficiency * 1 point
standards.
htpssdocs. google. comiformsida/FAlpOLSI89pHAZIqgPHZSFLxPoHO-KEM OplKsIOrI28DSquSeviFXdwiformResponse
a61218/22, 6.09 PM SOM Quiz 3
Ideal standards do not make provisions for workers with different degrees * 1 point
of experience and skill levels.
Standard costs are difficult to use with a process costing system. * 1 point
O Tre
@ False
Under practical standard, exceptions from standards are less likely. * 1 point
Consequently, managers will be better able to practice management by
exception.
@ Tre
O False
The standard cost per unit of materials cannot be determined until the end * 1 point
of the period.
Back Next Clear form
This form was created inside of National College of Business and Arts. Report Abuse
Google Forms
htpssdocs. google. comiformsida/FAlpOLSI89pHA2Iq2PHZSFLxPoHO-KEM OplKsIOrI2809quSeviFXdwiformResponse 48